Quickly correct the factory floor's slope and the gaps under the floor with rigid polyurethane foam resin!
Correcting floor tilts caused by earthquakes and ground subsidence without stopping operations and in a short period! No need to move machines or equipment! Also suppressing any concerning vibrations from the machines!
■ The machine cannot be leveled. ■ The machine is tilted and vibrating. ■ Malfunctions are occurring in the machine, leading to an increase in defective products. ■ Gaps have formed in the floor, walls, and ceiling. ■ Cracks have appeared in the floor. The "Upcon Method" solves problems caused by floor tilting and sagging due to earthquakes or ground subsidence, as well as voids and gaps that have formed beneath the floor, using polyurethane resin for quick repairs. 【What is the Upcon Method?】 Small holes with a diameter of 16mm are drilled into the existing concrete floor where subsidence has occurred. While continuously monitoring the level in millimeter increments, polyurethane resin is injected. The resin injected beneath the floor expands under pressure in a short time, compacting and strengthening the ground, improving bearing capacity, and pushing the concrete back to a level position. The final strength of the resin is achieved in about 60 minutes. Even if voids have formed beneath the floor, the same method is used to fill those voids. Since the existing concrete floor is repaired without demolition, the construction period is significantly reduced compared to conventional methods. The polyurethane can lift the floor with a foaming pressure of up to 10 tons per square meter, eliminating the need to move heavy equipment or materials. The deformation of the floor is corrected without stopping the production line.
Inquire About This Product
basic information
**Features of the Upcon Method** 1. Short Construction Period: The construction period is 1/10 that of conventional methods. There is no need for the demolition of existing concrete floors or curing periods, resulting in significant reductions in construction time compared to traditional methods. 2. No Disruption to Operations: No need to move machinery or goods. Construction can be carried out without stopping the production line. 3. High Technical Skill: 100% responsible construction by in-house employees. Our technical staff, who have undergone thorough training and gained experience, are responsible for the construction. 4. Compact Construction Setup: Quick restoration of the current state is possible. The construction plant vehicle, equipped with all necessary materials and equipment, is positioned near the building entrance, eliminating the need for large plant installation and removal. 5. Reduced Risk of Resettlement: The risk of resettlement is lower compared to conventional methods. Polyurethane resin is lighter than concrete or mortar, significantly reducing the risk of resettlement due to the weight of the materials. We provide total support from on-site surveys across the country to repair planning and construction, all handled responsibly by our in-house staff. If you are troubled by floor subsidence, please feel free to contact Upcon, the specialists in subsidence correction, with nationwide support and over 3,000 successful cases.
Price range
Delivery Time
Applications/Examples of results
Doma floor subsidence correction work Doma floor void filling work
catalog(7)
Download All Catalogs![[Construction Case Study/Factory Edition Vol. 1] Settlement Correction and Void Filling Work for a Bag Manufacturing Factory](https://image.mono.ipros.com/public/catalog/image/01/2e3/649428/IPROS09434185074319628739.jpeg?w=120&h=170)
![[Construction Case Study/Factory Edition Vol. 2] Settlement Correction and Void Filling Work for Precision Parts Manufacturing Factory](https://image.mono.ipros.com/public/catalog/image/01/60a/649429/IPROS31170878921170722761.jpeg?w=120&h=170)
![[Construction Case Study Factory Edition Vol. 3] Correction Work for Sunken Floor Slab in a Metal Processing Factory](https://image.mono.ipros.com/public/catalog/image/01/7cc/727508/IPROS94865378217145340721.jpeg?w=120&h=170)
![[Construction Case Study/Warehouse Vol.2] Settlement Correction Work for Automobile Manufacturer's Office and Parts Storage](https://image.mono.ipros.com/public/catalog/image/01/d82/644772/IPROS41981554215493828964.png?w=120&h=170)
![[Construction Case Study/Warehouse Vol. 1] Subsidence Correction and Void Filling Work for Warehouse and Factory](https://image.mono.ipros.com/public/catalog/image/01/d17/644938/IPROS68258418151929232212.jpeg?w=120&h=170)
News about this product(1)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.