Take measures to prevent water leakage during cutting! Connect the PVC piping and white piping using flanges.
The customer was planning to introduce new equipment in the factory to respond to increased production, and was considering measures to ensure that they could handle any troubles that might arise. Their request was, "We want to connect the separate pipes currently in use into one system so that even if one side stops, we can supply water from the other pipe, allowing us to keep the equipment running." To achieve this, we connected the PVC and white pipes at the junction points using flanges. Additionally, considering future uses, we installed ball valves to allow each pipe to be used independently while consolidating the piping. [Case Overview] ■ Industry: Electronic Components Manufacturing ■ Subject: Piping ■ Request: Piping Construction ■ Work Details: 1 day (1 week after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Inquire About This Product
basic information
【Response Details】 - Connected the PVC and white pipes at the connection points using flanges to link each pipe. - Installed ball valves to ensure that each pipe can be used independently, considering future applications, and consolidated the piping. - Drained the water from the pipes before construction to prevent leaks during cutting. - As the work was conducted at a height of about 3 meters from the ground, a rolling tower was assembled on-site for safety during the construction. - During the work, a blue tarp was used to prevent water splashes and ensure that water did not directly contact the walls. *For more details, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(5)
Download All Catalogs
Company information
An unwavering "spirit of service" to strongly support businesses in Mie. By upholding the "three promises" in our business, all employees strive to face our customers and respond to their needs. ■□■ Key Area: Mie Prefecture, Hokusei and Chusei Regions ■□■




![Vacuum Insulated Piping [Manufactured by Jeck Tohri] ◎Certified by the Minister of Economy, Trade and Industry](https://image.mono.ipros.com/public/product/image/780/2000395245/IPROS13954836198260453617.jpeg?w=280&h=280)


![[Free Consultation] Solve your concerns about human resource development and organizational building with an expert!](https://image.mono.ipros.com/public/product/image/2116324/IPROS6296700791486405869.png?w=280&h=280)
![[Free Consultation] Support for Skill Transfer and Personalization Elimination in Manufacturing Industry](https://image.mono.ipros.com/public/product/image/2116324/IPROS7215852937793411113.png?w=280&h=280)
![[Free Consultation] Technical Succession in Manufacturing, Elimination of Dependence on Individuals, and On-Site Improvement](https://image.mono.ipros.com/public/product/image/2116324/IPROS7926668162855223432.png?w=280&h=280)
![[Free Consultation] Support for Organizing and Prioritizing Factory Improvement Issues](https://image.mono.ipros.com/public/product/image/2116324/IPROS15121268743917620150.png?w=280&h=280)
![[Free Consultation] Support for Improving Inspection Operations and Quality Control in the Manufacturing Industry](https://image.mono.ipros.com/public/product/image/2116324/IPROS5075765738309177260.png?w=280&h=280)