A case where the progression of new red rust in the air conditioning chilled and hot water piping completely stopped just 52 days after installation!
The hospital had been built for 27 years at the time, and the air conditioning chilled and warm water piping, which used galvanized steel pipes (SGP), was experiencing significant deterioration due to red rust, raising concerns about leaks. Before the red rust corrosion could progress any further, a red rust prevention piping extension device called "NMR Pipe Protector" was installed. After 52 days of installation, under the same conditions, the water sampled from the air conditioning warm water showed a transparent color, and the water quality test results indicated that the iron ion concentration in the water was 0.27 mg/l, which is below the water quality standard value (1.0 mg/l) set by the Japan Refrigeration and Air Conditioning Industry Association. If this product continues to be installed in the hospital's air conditioning chilled and warm water piping, it has been verified that the red rust deterioration and leaks in the piping will be completely prevented, extending the piping's lifespan to that of the building. [Introduction Overview] ■ Hospital Location: Sendai City, Miyagi Prefecture ■ Hospital Overview: 27 years old, 5 stories, 199 beds ■ Installation Work: December 25 to 28, 2006 *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Installed Piping/Number of Installations】 <Hot Water System> ■ Hot water piping for HP1-1, HP1-2, HP2-1, HP2-2, HP2-3, HP2-4 (GSP 150mm to 40mm) - 2 units of PT-150DS - 1 unit of PT-125DS - 1 unit of PT-100DS - 1 unit of PT-75DS - 1 unit of PT-50DS <Cooling Water System> ■ Cooling water piping for EP1-1, EP1-2, EP2-1, EP2-2, EP2-3, CWBP (GSP 150mm to 65mm) - 3 units of PT-150DS - 1 unit of PT-100DS - 2 units of PT-75DS <Cooling Water System> ■ Cooling water piping for CP-1, CP-2 (GSP 150mm) - 2 units of PT-150DS *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(5)
Download All Catalogs
Company information
~Extending the lifespan of old piping~ "NMR Pipe Protector" Cumulative installation record surpasses 4,400 buildings! (As of July 2025) Among them, over 3,100 buildings are condominiums. = Domestic Achievements = New Chitose Airport Domestic Terminal, JR Sapporo Station (JR Tower Building), Imperial Theatre Building (Tokyo Marunouchi), Yaesu Exit Hall, Famous Bookstore Building (Shinjuku), Hotel Toyokaku (Kyoto), Hotel Serve Shibuya, Shirakagi Care House (Saitama), Kawanishi Private Kushi Elementary School, Food Processing Factory, Major Automobile Manufacturer Factory (Fukuoka Prefecture), Kumamoto Red Cross Hospital, etc. = International Achievements = Buckingham Palace, London City Hall, British Museum, BBC, Christ's College, University of Cambridge, Royal Bank of Scotland, Harrods Department Store, Royal Garden Hotel London, UK Parliament, etc. ★ Featured in the Media "NMR Pipe Protector" ★ Selected as one of the top 10 rust prevention technologies in the world in 2020 and introduced in a U.S. magazine! Case studies and customer testimonials have been featured in many media outlets, including TV Tokyo's "World Business Satellite (WBS)", TOKYO MX's "Corporate Spirit", and specialized newspapers "Condominium Management News" and "Air Conditioning Times".