Comprehensive gas discharge tests for interference surveys of geothermal wells in various locations! Please feel free to consult with us at any phase.
The blowout test consists of several phases. The "pumping test" is conducted immediately after the geothermal well has been drilled. The main purpose is to discharge the cuttings and mud water during drilling. Additionally, the "blowout test" is performed for each geothermal well, and the "comprehensive blowout test" aims to collect data for assessing power generation capacity. Please feel free to consult us at any phase. We will provide proposals based on our track record. [Overview] ■ Pumping Test - Conducted immediately after the geothermal well has been drilled - Lasts for several days - Main purpose: Discharge of cuttings and mud water during drilling *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Other Overview】 ■ Venting Test - Conducted for each geothermal well - Approximately 1 to 3 months - Main purpose: Investigation of the original hot water composition, confirmation of geothermal well capacity ■ Comprehensive Venting Test - Simultaneous venting test for all geothermal wells - Approximately 3 to 6 months - Main purpose: Investigation of interference between geothermal wells, data acquisition for examining power generation capacity *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
By leveraging my experience as a user, I will contribute to the utilization of low-cost, high-efficiency, and clean equipment by responding to various customer needs regarding equipment. Additionally, I will fulfill our corporate social responsibility and strive to maintain and improve the natural environment.