[Construction Example] Food Factory 2nd Floor: Settlement Correction Work and Unevenness Correction Work
Correction of unevenness and settlement on a floor with a special structure! Resolving issues with cart operations caused by unevenness.
We would like to introduce a case of "settlement correction work and unevenness correction work" carried out on the second-floor slab of a food factory located in Kanagawa Prefecture. Unevenness occurred in the floor panels of the refrigerated room, causing issues with the movement of carts transporting goods, and the panels were being held down with anchors to suppress the unevenness. After the construction, the settlement in front of the entrance was resolved, and the floor panels' floating issue was also eliminated by filling the urethane layer with new urethane. 【Case Overview】 ■ Construction Area: 46.17m² ■ Maximum Settlement Amount: 42mm ■ Void Amount: 46.17 ■ Area: Kanagawa Prefecture ■ Construction Period: 4 days (including ancillary work) *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.