Introducing examples of buildings constructed with smooth transportation and user-friendly flow!
We would like to introduce the construction achievements of 2×4 houses at our wooden factory, Kowa Manufacturing, which operates with a fully integrated system from the design and manufacturing of press molds to press processing, assembly, and shipping. The first floor consists of a processing factory and a warehouse, while the second floor includes a conference room, office, material storage area (81.94 tsubo), and a workshop (116.44 tsubo), allowing for ample material storage. The building is equipped with a material transport lifter (8.12 m²) connecting the first and second floors, ensuring smooth and user-friendly transportation flow. 【Project Overview (Partial)】 ■ Overall construction period: September 2022 to the end of April 2023 (8 months) ■ Address: Tarui Town, Fuwa District, Gifu Prefecture ■ Number of floors: 2-story with some single-story sections ■ Total floor area: ・2504.16 m² (757.6 tsubo) ・1st floor: 1669.44 m², 2nd floor: 834.72 m² *For more details, please refer to the related links or feel free to contact us.
Inquire About This Product
basic information
【Other Case Summary】 ■Wood Structure - 2nd floor of the two-story section: 16.3m span (LVL truss structure) - Roof of the single-story section: 25.4m span + 3m eave extension (LVL truss structure) ■Estimated Wood Usage - 326m3 - Total carbon storage of wood (CO2 equivalent): 240t-CO2 *For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Leave it to us with peace of mind!! Consistent construction from structural design of 2x4 houses to the building process. Leave it to us with peace of mind!! Proposing the optimal logistics system tailored to our customers.