Reduce the time spent on demand calculation by 100 hours a year! By implementing a streamlined function, we solve issues precisely while coexisting with the existing system.
We would like to introduce a case study on the implementation of the inventory management system "SmartF" at Nitto Denko Corporation, a cosmetics manufacturer. The company faced challenges in accurately grasping future inventory levels and had to manually input required quantity calculations using Excel. As a result of the implementation, by automating the required quantity calculations through CSV integration between the existing system and SmartF, they were able to reduce labor hours by 100 hours annually. [Case Overview (Partial)] ■Challenges - Due to fluctuations in lot numbers, lot records at the site were being maintained manually. ■Effects - Significant reduction in the effort required for handwritten lot records by optimizing the timing of production order issuance.
Inquire About This Product
basic information
【Other Case Summary】 ■Solution - CSV integration of production planning and inventory data between Smart F and existing systems. ■Background of Implementation - The manufacturing volume has increased nearly twofold, making Excel-based requirement calculations insufficient. *For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
catalog(8)
Download All Catalogs
Company information
- Based on a wealth of over 250 successful contract development projects in the manufacturing industry, we planned and developed the production management cloud system "Smart F." - A professional company specializing in DX for the manufacturing industry, well-versed not only in IT technology but also in the operations of manufacturing sites.





![SmartF Implementation Case Studies [Assembly Industry]](https://image.mono.ipros.com/public/product/image/2080901/IPROS11369191301179499039.png?w=280&h=280)
![[Data] Production Schedule Template: Easily Create Work-Specific Gantt Charts](https://image.mono.ipros.com/public/product/image/2080901/IPROS7511278023852021927.jpg?w=280&h=280)
![Production Management for Pharmaceuticals and Cosmetics: Case Study [Gantt Chart Option]](https://image.mono.ipros.com/public/product/image/f24/2000553636/IPROS78477947930291160375.png?w=280&h=280)
![[Basic Knowledge] About Customization](https://image.mono.ipros.com/public/product/image/43b/2000328251/IPROS43044833247200060395.jpeg?w=280&h=280)
![[Case Study on the Implementation of a Production Management System for Health Food Manufacturers] Byholon Inc.](https://image.mono.ipros.com/public/product/image/080/2000693313/IPROS69602423388883960702.png?w=280&h=280)




![[Inventory Management] Lamp tag lights up to notify / Location management system](https://image.mono.ipros.com/public/product/image/17d/2001518425/IPROS8614431155595895802.jpg?w=280&h=280)
