Product-specific cost management and gross profit analysis are now possible! A system that enables improved development speed through budgeting for product development.
We would like to introduce a case study on the implementation of the cost management system "SmartF" at Time Machine Co., Ltd., a manufacturer of assembled products. The company faced the challenge of needing 1 to 2 personnel (equivalent to 40 to 80 hours) for outsourcing to perform cost calculations by product. As a result of the implementation, SmartF enabled automatic product-specific cost management, allowing for a reduction in labor costs and hours equivalent to 40 to 80 hours. [Case Overview (Partial)] ■Challenges - Unable to grasp inventory except through monthly stocktaking, and unable to aggregate labor hours. ■Effects - Established a system that enables detailed gross profit analysis through real-time inventory management and system labor hour aggregation.
Inquire About This Product
basic information
【Other Case Summary】 ■Solution - Introduced automatic cost management through inventory management and labor hour aggregation of Smart F. ■Background of Implementation - It was difficult to develop cost calculation functions with in-house systems, so a packaged system that achieves standard operations at a low cost was considered. *For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
catalog(18)
Download All Catalogs
Company information
- Based on a wealth of over 250 successful contract development projects in the manufacturing industry, we planned and developed the production management cloud system "Smart F." - A professional company specializing in DX for the manufacturing industry, well-versed not only in IT technology but also in the operations of manufacturing sites.


![[Information] How to Stop Using Paper and Excel in Production Management](https://image.mono.ipros.com/public/product/image/2080901/IPROS5128220888447409515.png?w=280&h=280)
![SmartF Implementation Case Studies [Assembly Industry]](https://image.mono.ipros.com/public/product/image/2080901/IPROS11369191301179499039.png?w=280&h=280)


![[Case Study] Kyowa Seiko Co., Ltd. - The price of i-PROW was the deciding factor.](https://image.mono.ipros.com/public/product/image/8fb/2001227680/IPROS3184361471426400496.png?w=280&h=280)
![[Introduction Materials] Accident Prevention and Traceability System 'Anshin Works'](https://image.mono.ipros.com/public/product/image/046/2000814286/IPROS39447966246759594590.png?w=280&h=280)
![[Customization Example] Understanding Order Details (Loss Prevention) etc.](https://image.mono.ipros.com/public/product/image/3a6/2000294302/IPROS6604364380487538242.png?w=280&h=280)


![[DX Promotion] Advanced Work Analysis and Improvement Tool 'Time Prism'](https://image.mono.ipros.com/public/product/image/b8c/2000419232/IPROS99182972907542311320.png?w=280&h=280)

