If you're troubled by scale in your cooling tower, try "Aqua Crystal Ring."
Handling Company: Archive Co., Ltd.
For those struggling with scale removal in cooling towers
**For those struggling with scale removal in cooling towers** Stubborn scale that won't come off even with chemicals, we will completely remove it with "zero chemicals"! **We can solve all these problems!** ✓ The scale is really bad. ✓ Cooling efficiency is decreasing, and there are occasional abnormal shutdowns. ✓ The filler is clogged with scale. ✓ It’s hard to remove even with chemicals. ✓ Maintenance effort and frequency are increasing. ✓ I want to reduce chemical costs. **Five benefits that make us the choice** ■ Benefit 1: Significantly improved cooling efficiency! We remove scale and restore the original cooling performance. ■ Benefit 2: No chemicals, power, or construction needed! Just place it in water. No special work is required. ■ Benefit 3: Maintenance-free Simply wipe the main unit with a cloth when it gets dirty. Maintenance is completed in one minute! ■ Benefit 4: Reduced running costs No need for chemicals, electricity, or additional maintenance costs. Significant expense reduction. ■ Benefit 5: Environmentally friendly Contributes to reducing waste and CO2 emissions with zero chemicals and power. ★ Moreover, to prevent the reattachment of scale, the lifespan of the equipment and piping inside the cooling tower will be greatly extended.
Inquire About This Product
basic information
【Recommended for companies like these】 ✓ Cannot use chemicals due to hygiene or manufacturing reasons ✓ Hesitant to introduce large devices such as "electrolytic scale removal systems" ✓ Prefer minimal maintenance ✓ Previous scale countermeasures have not been effective 【Three features of our product】 ■ Feature 1: Easy installation without construction or tools Installation is simply done by attaching it with the included cable ties. Anyone can easily install it. ■ Feature 2: Can be installed without stopping operation It can be introduced just by placing it in the water, without needing to stop operations. *In some cases, stopping operation may be necessary. ■ Feature 3: Can be installed regardless of size or type It can be introduced into any cooling tower, regardless of size, shape, or type. 【Specifications】 - Size: Diameter 100mm, Thickness 30mm - Material: Resin (hardened polyethylene) - Accessories: Chain, cable ties - Operating temperature range: 1℃ to 80℃ - Warranty period: 3 years For information on the safety of our product (Product Safety Data Sheet/SDS), please visit our website below. https://acr.archives.co.jp/specification/
Price information
Please send us the specifications of the cooling tower you are having trouble with, along with any current photos if possible. We will propose the optimal plan and estimate for where and how many units should be installed.
Delivery Time
P3
※We will deliver within 5 business days after the order is placed. Installation can be done on the same day the product arrives (estimated time: about 10 minutes).
Applications/Examples of results
■Example 1: A major hotel in Tokyo - Cooling tower for air conditioning (1800RT) A large cooling tower that has been in operation for 25 years. The cooling efficiency had significantly decreased due to scale and rust, prompting consideration for replacement. Including disposal, new installation, piping work, and losses due to downtime, the estimated cost was about 200 million yen. "It wouldn't be too late to try this product first," they decided, and it was installed. As a result, scale removal and rust suppression were achieved, leading to an extension of the cooling tower's lifespan and significant cost savings. (Afterward, installations were also made at related hotels in Hakone and Ito.) ■Example 2: A major ice manufacturer in Saitama - Cooling tower (125RT) A cooling tower that has been in operation for 18 years. A significant amount of scale had accumulated on the filler, worsening cooling efficiency. They were troubled as the scale could not be removed even with chemical treatment. About 10 months after installation, approximately 20 kg of scale was detached, and cooling efficiency was restored. (Afterward, it was also installed in another cooling tower.) === Additionally, we have over 100 cumulative installation achievements === For more details, please visit the website below (Handling company: Archive Co., Ltd.). https://acr.archives.co.jp/
catalog(7)
Download All Catalogs![Examples of Water Quality Improvement and Their Mechanisms of Action [Technical Explanation Document Vol. 2]](https://image.mono.ipros.com/public/catalog/image/2116982/IPROS13138369965535401833.jpeg?w=120&h=170)
Company information
Our company, as a member of Japanese society, aims to contribute to the evolution of society by delivering truly valuable products and services to the world through the skill of sales writing. We believe it is our responsibility to possess the skill to accurately and dramatically communicate "the value that the product or service holds." As a result, we believe this will lay the foundation for a hopeful and prosperous society where everyone can live not according to someone else's values, but according to their own values and in their own way.