"Aqua Crystal Ring" for stubborn scale removal that I had given up on.
Handling Company: Archive Co., Ltd.
"I got this much! I can't believe it." The stubborn scale has been completely removed. It can be installed in any cooling tower.
**For those struggling with scale removal in cooling towers** Stubborn scale that won't come off even with chemicals, we will completely remove it with "zero chemicals"! **All these concerns can be resolved!** ✓ The scale is really bad. ✓ Cooling efficiency is declining, and there are occasional abnormal shutdowns. ✓ The filler is clogged with scale. ✓ It's hard to remove even with chemicals. ✓ Maintenance effort and frequency are increasing. ✓ I want to reduce chemical costs. **Five benefits of choosing us** ■ Benefit 1: Significantly improved cooling efficiency! We remove scale and restore the original cooling performance. ■ Benefit 2: No chemicals, power supply, or construction needed! Just place it in water. No special work is required. ■ Benefit 3: Maintenance-free Just wipe the main unit with a cloth when it gets dirty. Maintenance is completed in one minute! ■ Benefit 4: Reduced running costs No need for chemicals, electricity costs, or additional maintenance expenses. Significantly cut costs. ■ Benefit 5: Environmentally friendly Contributes to reducing waste and CO2 emissions with zero chemicals and power supply. ★ Moreover, to prevent the reattachment of scale, the lifespan of the equipment and piping inside the cooling tower is greatly extended.
Inquire About This Product
basic information
【Recommended for such companies】 ✓ Cannot use chemicals due to hygiene or manufacturing reasons ✓ Hesitant to introduce large devices such as "electrolytic scale removal devices" ✓ Prefer minimal maintenance ✓ Previous scale countermeasures have not been effective 【Three features of our product】 ■ Feature 1: Easy installation without construction or tools Installation is simply done with the included cable ties. Anyone can easily install it. ■ Feature 2: Can be installed without stopping operation It can be introduced without stopping operation, as it only needs to be placed in water. *In some cases, stopping operation may be necessary. ■ Feature 3: Can be installed regardless of size or type It can be introduced into any cooling tower, regardless of size, shape, or type. 【Specifications】 - Size: Diameter 100mm, Thickness 30mm - Material: Resin (hardened polyethylene) - Accessories: Chain, cable ties - Operating temperature range: 1℃ to 80℃ - Warranty period: 3 years For information on the safety of our product (Product Safety Data Sheet/SDS), please visit our company website below. https://acr.archives.co.jp/specification/
Price information
Please send us the specifications of the cooling tower that you are having trouble with, along with any current photos if possible. We will propose the optimal plan and estimate for where and how many units should be installed.
Delivery Time
P3
※After placing the order, we will deliver it within 5 business days. Installation can be done on the same day the product arrives (estimated time: about 10 minutes).
Applications/Examples of results
■Example 1: Major Hotel in Tokyo - Cooling Tower for Air Conditioning (1800RT) A large cooling tower that has been in operation for 25 years. The cooling efficiency had significantly decreased due to scale and rust, and they were considering replacing the cooling tower. Including disposal, new installation, piping work, and losses due to downtime, the estimated cost was about 200 million yen. They decided, "It wouldn't be too late to try this product first," and proceeded with the installation. As a result, scale removal and rust suppression were achieved, leading to an extension of the cooling tower's lifespan and significant cost savings. (Afterward, installations were also made at related hotels in Hakone and Ito.) ■Example 2: Major Ice Manufacturer in Saitama - Cooling Tower (125RT) A cooling tower that has been in operation for 18 years. A significant amount of scale had adhered to the filler, worsening the cooling efficiency. They were troubled as the scale could not be removed even with chemical treatment. About 10 months after installation, approximately 20 kg of scale was removed, and the cooling efficiency was restored. (Afterward, they also installed it in another cooling tower.) === In addition, we have over 100 cumulative installation achievements === For more details, please visit the following website (Handling Company: Archive Co., Ltd.). https://acr.archives.co.jp/
catalog(7)
Download All Catalogs![Examples of Water Quality Improvement and Their Mechanisms of Action [Technical Explanation Document Vol. 2]](https://image.mono.ipros.com/public/catalog/image/2116982/IPROS13138369965535401833.jpeg?w=120&h=170)
Company information
Our company, as a member of Japanese society, aims to contribute to the evolution of society by delivering truly valuable products and services to the world through the skill of sales writing. We believe it is our responsibility to possess the skill to accurately and dramatically communicate "the value that the product or service holds." As a result, we believe this will lay the foundation for a hopeful and prosperous society where everyone can live not according to someone else's values, but according to their own values and in their own way.