Comprehensive Power Diagnosis for Precision Machinery Factories
Comprehensive Power Diagnosis for Factories
Visualizing the electricity costs of the grinding process to support energy-saving improvements.
In the precision machinery industry, optimizing power consumption in the polishing process is essential for cost reduction and productivity improvement. It is necessary to understand the power usage of polishing machines and related equipment and to eliminate waste. Aim Co., Ltd.'s "Factory-Wide Power Diagnosis" analyzes the overall power usage of the factory in detail and identifies waste in power consumption during the polishing process. 【Usage Scenarios】 - Visualization of power usage in the polishing process - Correlation analysis between the operational status of polishing machines and power consumption - Prioritization of energy-saving measures 【Benefits of Implementation】 - Visualization of potential electricity cost savings - Estimation of cost-effectiveness for energy-saving investments - Improvement in profit margins through reduced energy costs
Inquire About This Product
basic information
【Features】 - Detailed analysis of the overall power usage in the factory - Visualization of the breakdown of power usage, load fluctuations, and demand trends - Presentation of potential reduction areas and improvement priorities - Estimation of investment recovery period - Further energy-saving proposals through the introduction of Reduck 【Our Strengths】 AIM Corporation is a company with strengths in energy-saving technologies for refrigeration and air conditioning systems. We provide high return on investment solutions through improvement proposals that utilize existing equipment.
Price information
Basic Diagnosis: 198,000 yen (excluding tax) - For a factory with an annual electricity cost of 20 million yen, a 1% improvement can reduce costs by 200,000 yen. Standard Diagnosis: 580,000 yen (excluding tax) - For a factory with an annual electricity cost of 20 million yen, a 2.9% improvement can be recovered. Premium Diagnosis: 980,000 yen (excluding tax) - For a factory with an annual electricity cost of 30 million yen, a 3.3% improvement can be recovered. The cost of updating one refrigeration unit is between 15 million and 30 million yen. Before that, why not understand the "overall structure of wasted electricity" for 980,000 yen?
Price range
P4
Delivery Time
P4
※There is a limit to the number of loggers, so please consult with us.
Applications/Examples of results
We have a track record with 13 companies, including food manufacturing plants and meat processing centers. Feedback from factory managers and energy-saving managers indicated that they seemed to know the percentage of electricity consumption for power equipment such as refrigeration units, chillers, compressors, conveyor belts, and processing machinery, but they did not actually know. It was also revealed that large power equipment does not consume a significant amount of electricity depending on operating hours and seasonal variations, which helps in understanding the priority for energy-saving measures, allowing for effective strategies to be implemented and cost-effective energy-saving initiatives to be undertaken.
catalog(2)
Download All CatalogsCompany information
Reduce electricity costs without replacing your freezer. We are an energy-saving technology manufacturer specializing in "electricity cost reduction" for freezers and air conditioning units in food factories. "Rising electricity costs" and "earthquake risks." Aim Co., Ltd. reduces corporate management risks from both equipment and building perspectives. We have developed our own energy-saving devices such as "Riduck," which improves the mechanical efficiency of commercial freezers and air conditioning units, the wall reinforcement material "Kabetsuyoshi Series" for wooden houses, and the seismic diagnosis software "Mokutai Hakase N." We provide high return on investment solutions through improvement proposals that utilize existing equipment.







![[Leveling Correction] Leveling correction of concrete floors "Teratec Method"](https://image.mono.ipros.com/public/product/image/d08/1267539002/IPROS70063422645318547243.jpeg?w=280&h=280)

