Balancing measures for extreme heat and extreme cold while reducing electricity costs! Warehouse roof renovation system.
An integrated system for warehouse roof renovation that combines insulation, waterproofing, and lightweight solar, achieving both improved working environment and reduced electricity costs without seismic reinforcement work.
In the current situation where the risks of heatstroke, soaring electricity costs, and labor shortages are becoming serious, improving the harsh thermal environment in warehouse sites and promoting energy conservation are urgent tasks for companies. To protect the health of workers and ensure sustainable business continuity, environmental improvements from the roof are being sought. Joscom Co., Ltd. offers a warehouse roof renovation system that balances measures against extreme heat and cold with electricity cost reduction. By integrating "Isotan insulation + polyurea waterproofing" with Kyocera's ultra-lightweight solar power generation, it is possible to achieve building protection, improvement of the working environment, and self-consumption of electricity in a one-stop solution. 【Features】 ■ Comprehensive support: Integrating insulation, waterproofing, and power generation to completely renovate the warehouse roof and optimize storage and working environments. ■ Improvement of working environment: Significantly suppressing heat impact from the roof, reducing the risk of heatstroke in summer and providing warmth in winter. ■ Funding renovation costs through solar power generation: The effects of self-consumption and electricity cost reduction can offset the costs of insulation and waterproofing work. ■ Ultra-lightweight design that does not require seismic reinforcement: Utilizing ultra-lightweight panels that do not impose a load on the existing roof structure, eliminating the need for seismic reinforcement work. If you are responsible for simultaneously improving harsh warehouse environments and advancing decarbonization measures, please check the catalog download button.
Inquire About This Product
Related Videos
basic information
**Construction Process (5 Steps in Total)** ■ Site Investigation Specialized staff will thoroughly check and diagnose the actual condition and structure of the warehouse roof, as well as the surrounding environment. ■ Substrate Treatment To ensure that insulation and waterproofing materials adhere properly, we will perform substrate treatment, including the removal of dirt and rust, as well as repairs and cleaning of the roof surface. ■ Insulation Application (Isotan Insulation) We will apply high-performance spray insulation without gaps, shutting out the effects of outside temperatures (solar heat and winter cold). ■ Waterproofing Application (Polyurea Waterproofing) We will spray a strong, durable, and waterproof polyurea to prevent rainwater intrusion for an extended period. ■ Solar Panel Installation (Ultra-Lightweight Solar Panels) We will install ultra-lightweight panels that do not burden the existing roof, establishing a self-consumption and power generation system. *The feasibility and specifications of the construction may vary depending on the condition and structure of the roof, as well as usage conditions (the optimal plan will be proposed after a site investigation). *If you are a person in charge who wants to simultaneously improve the harsh warehouse environment and implement decarbonization measures, please check the catalog download button.
Price range
Delivery Time
Applications/Examples of results
If you are a person in charge who wants to simultaneously improve the harsh warehouse environment and implement decarbonization measures, please check the catalog download button.
catalog(1)
Download All CatalogsCompany information
Joscom will thoroughly inspect and investigate the current condition of the buildings and carry out appropriate maintenance and repair work that contributes to their longevity. In our company, many young skilled workers are actively engaged on-site. The fact that our own craftsmen carry out the work requested by customers can truly be described as "direct delivery from the construction site." Joscom will continue to aim for the longevity of buildings and maintain the "direct delivery from the construction site" approach.

