Subsidies available for the introduction of production schedulers | Labor-saving investment subsidies
You can use a subsidy with a maximum limit of 100 million yen and a subsidy rate of 1/2 to 2/3 for the introduction of a production scheduler.
You can use the Small and Medium Enterprises Energy-Saving Investment Subsidy (General Type) for the introduction of production schedulers. Equipment that combines peripheral devices and automation tailored to the site is eligible. 【Examples of configurations targeting schedulers】 ■ Delegate production planning to the scheduler Reduce the time spent by those who reorganize plans daily using spreadsheets ■ Collect work performance data at the site terminals Reduce the need for filling out paper daily reports and transcribing them in the office ■ Automatically capture progress using equipment sensors Reduce the hassle of checking progress by going around the site 【Support from Taigen】 Over 158 adoptions and a total subsidy amount of over 2.8 billion yen. Consultations are free. We will support you from creating the business plan to application, and from adoption to grant application and performance reporting. *You can easily book a 60-minute free consultation by selecting a date from the QR code in the catalog.
Inquire About This Product
basic information
【Maximum Subsidy Amount (by Number of Employees)】 - 5 or fewer: 7,500,000 yen (10,000,000 yen for significant wage increases) - 6 to 20: 15,000,000 yen (20,000,000 yen for significant wage increases) - 21 to 50: 30,000,000 yen (40,000,000 yen for significant wage increases) - 51 to 100: 50,000,000 yen (65,000,000 yen for significant wage increases) - 101 or more: 80,000,000 yen (100,000,000 yen for significant wage increases) 【Subsidy Rate】 Small and medium-sized enterprises: 1/2 (2/3 if working to raise the minimum wage), small businesses: 2/3 【Eligible Expenses for Subsidy】 Costs for machinery and equipment/system construction (mandatory), transportation costs, technology introduction costs, expenses related to intellectual property rights, outsourcing costs, expert fees, cloud service usage fees It is a condition to include at least one piece of machinery or equipment with a unit price of 500,000 yen (excluding tax) or more.
Price information
The upfront fee is 100,000 yen, and the success fee is only received when accepted. Consultations are free.
Delivery Time
※Available nationwide online. You can proceed with the application in as little as two weeks.
Applications/Examples of results
【Example of Calculation】 In the case of a parts manufacturing company (50 employees) introducing a production scheduler + on-site work performance input terminals and equipment operation sensors: - Equipment cost (excluding tax): 12,000,000 yen - Subsidy (subsidy rate 1/2): 6,000,000 yen - Actual burden: 6,000,000 yen * The subsidy limit for 50 employees is 30,000,000 yen. The actual subsidy amount will be determined based on the content of the plan and the review. 【Frequently Asked Questions】 Q. Can it be used with just the scheduler? A. It qualifies if combined with on-site terminals and equipment sensors to reduce human labor. Q. Can a plan be made in a factory with many urgent interruptions? A. Yes, it can. Demonstrating how much time is reduced for reworking the plan will be a key aspect of the plan.
catalog(1)
Download All CatalogsCompany information
Taigen Co., Ltd. is a management consulting company established in 2021. Based on the "tips" and "solutions" gained from practice, we provide support for building strong organizations, financial assistance, and new business development. Additionally, we offer a wide range of services, including the formulation of organizational visions, the establishment of evaluation systems, financial training, support for subsidy applications, as well as the planning of business strategies and support for new businesses. We provide one-stop support from building a robust organization and business strategy to fundraising. Please feel free to contact us when needed.











![Review of the slope of the promenade [Example of 3D point cloud editing application]](https://image.mono.ipros.com/public/product/image/c67/2000432036/IPROS13318682353174873464.jpg?w=280&h=280)

![[Information] How the introduction of a scheduler changes production planning operations.](https://image.mono.ipros.com/public/product/image/2001633084/IPROS5258002008102188825.png?w=280&h=280)
