Learn about on-site safety from the palm of your hand.
This is a 1/10 scale model kit that reproduces the next-generation scaffolding "Millennium" for educational and training purposes. It can clearly explain the structure of scaffolding and the roles of its components during safety education at construction sites, new employee training, recruitment activities, and exhibitions. Product Features: Learn the structure of next-generation scaffolding in three dimensions. The structure of next-generation scaffolding used in actual sites is reproduced in the model. You can intuitively check the assembly procedures and the roles of each component in a form close to the real thing. Easy to assemble without tools. Designed to be assembled like a puzzle, no tools are required. The estimated assembly time is about 30 minutes. Can be used for site simulations. It can be utilized for a wide range of purposes such as new employee training, safety education, reviewing work procedures, sales presentations, recruitment events, and exhibitions.
Inquire About This Product
basic information
Supports: P27, P18, P1.0 each 11 pieces Fabric: S18 7 pieces, S12A 26 pieces, S6A 8 pieces Brace: STX1809 21 pieces Stairs: K1818 2 units Stair handrail: JE18 4 pieces Stair opening handrail frame: KT18 2 units Anti: L5018 14 sheets Jack base: N2W 11 pieces *Dimensions are based on the actual conversion dimensions for a 1/10 scale model. *Kit contents may change without notice.
Price range
P3
Delivery Time
Applications/Examples of results
- Training for new employees and safety education - Explanation of scaffolding assembly procedures - Pre-simulation of on-site work - Introduction of business at recruitment events - Explanations during exhibitions and business meetings - Tools for sales and presentations Please check before purchasing.
catalog(1)
Download All CatalogsCompany information
Our company primarily engages in the buying and selling of temporary scaffolding materials, and we have over 1,000 customers nationwide, from Hokkaido to Okinawa. We constantly strive to maintain the number one inventory level in the country and work hard to meet various customer requests. We ship fully maintained scaffolding materials and temporary supplies throughout Japan and overseas. We also accommodate container loading and bulk shipments, so please feel free to contact us. We accept inquiries for estimates and delivery times. We have also started selling through our online shop. Search for "Scaffolding Frog."





![3D Model Production [One-stop from Prototyping to Manufacturing] *Case studies included](https://image.mono.ipros.com/public/product/image/d94/2000438249/IPROS16434053143718568604.jpg?w=280&h=280)
![[Processing Example] Sponge Gear Model](https://image.mono.ipros.com/public/product/image/4f2/2000376291/IPROS8036068528579017787.jpg?w=280&h=280)
![[Production Example] Galapagos Giant Tortoise](https://image.mono.ipros.com/public/product/image/60e/2000996834/IPROS84813810438209122825.jpeg?w=280&h=280)



