List of Control and Electrical Equipment products
- classification:Control and Electrical Equipment
9361~9375 item / All 53339 items
Achieves high collection efficiency through electrostatic methods. Offers a wide range of products from large to small sizes. Also compatible with water-soluble oil mist.
- air conditioning
Contributes to ISO 14001 and SDGs! Easy installation on existing piping. Reduces maintenance costs and labor with no chemical injection! Water treatment device - Scale Watcher.
- Water treatment equipment
Achieve extended equipment lifespan and a comfortable water environment! We recommend installation during new construction or renovation!
- Water treatment equipment
Recover mineral oil accumulated in the coolant pit to enhance resource utilization and reduce waste!
- Oil-water separator
Efficiently recover animal and vegetable oils in a short time to dramatically reduce the inflow of fats and oils into sewers and treatment facilities!
- Oil-water separator
Scale Watcher will change the three major challenges of scheduled maintenance! Significantly reduce long equipment downtime, high costs, and cleaning labor hours!
- Water treatment equipment
Adhesion scale softening and peeling effect! Reduction in system downtime has also been confirmed.
- Water treatment equipment
Installed in the supply water of large incinerator injection pumps! Significant effects on cooling efficiency and equipment longevity without the use of chemicals.
- Water treatment equipment
Improve circulating cooling water without chemicals! Easily enhance the blockage in piping and the cooling efficiency decline in resin molding machines, temperature control units, and molds!
- Other water treatment equipment
We want to ensure that rainwater outside the standard values is neutralized and not discharged externally!
- Other water treatment equipment
Are the current transportation methods able to meet the "GDP"? - We focused on the use of VIP (Vacuum Insulation Panels).
- Other Boxes
Exhaust type + stirring type unit type
- Ventilation and Exhaust
About the "Automatic Stop Function after 10 Years" for the Underfloor and Attic Ventilation Fan Series.
Regarding the "Automatic Stop Function after 10 Years" Automatic stop has been implemented in products manufactured from 2015 onwards. ■ Overview of Inspection Period Notification Function The dedicated controllers and timers for underfloor and attic ventilation fans sold since 2015 are equipped with the safety function mentioned on the left. Starting from November 2025, this automatic stop function will be activated sequentially for products manufactured in 2015. ■ Response Procedure at the Time of Automatic Stop It is anticipated that customers will contact the sales and installation stores. We ask that the sales and installation stores respond according to the following steps: 1. Conduct a safety inspection based on the "Underfloor and Attic Ventilation Fan Inspection Checklist." * Please be sure to check for looseness and retighten the connections of the controller and timer. If any liquids such as water, oil, or detergent have come into contact, the internal components may corrode, leading to ignition or fire, necessitating the replacement of the main unit. 2. If there are no issues, press and hold the set button to restart operation. ■ Start of Shipment for Controllers/Timers with Inspection Period Notification Function For details regarding the shipment history of timers, please contact our company: your sales representative or the Quality Control Department.
Exhaust type + diffusion type unit! A subfloor ventilation series that detects humidity conditions and draws in dry air from beneath the floor.
- Ventilation and Exhaust
About the "Automatic Stop Function after 10 Years" for the Underfloor and Attic Ventilation Fan Series.
Regarding the "Automatic Stop Function after 10 Years" Automatic stop has been implemented in products manufactured from 2015 onwards. ■ Overview of Inspection Period Notification Function The dedicated controllers and timers for underfloor and attic ventilation fans sold since 2015 are equipped with the safety function mentioned on the left. Starting from November 2025, this automatic stop function will be activated sequentially for products manufactured in 2015. ■ Response Procedure at the Time of Automatic Stop It is anticipated that customers will contact the sales and installation stores. We ask that the sales and installation stores respond according to the following steps: 1. Conduct a safety inspection based on the "Underfloor and Attic Ventilation Fan Inspection Checklist." * Please be sure to check for looseness and retighten the connections of the controller and timer. If any liquids such as water, oil, or detergent have come into contact, the internal components may corrode, leading to ignition or fire, necessitating the replacement of the main unit. 2. If there are no issues, press and hold the set button to restart operation. ■ Start of Shipment for Controllers/Timers with Inspection Period Notification Function For details regarding the shipment history of timers, please contact our company: your sales representative or the Quality Control Department.
Measures against heat in the attic! Expels accumulated heat and improves air conditioning efficiency! Effective against humidity, condensation, and VOCs!
- Ventilation and Exhaust
Remote live inspection service
■Live Inspection Start Our company conducts inspections to provide our clients with a deeper understanding of the effectiveness, safety, and installation information of the products they sell. This includes visits to our simulation studio, experimental laboratory, test house, and production line. By observing the visualization of product effects, safety tests, and durability testing scenes, we have received feedback such as "I gained a deeper knowledge of the products" and "I can confidently propose to end users." We are pleased to announce the launch of our 'Remote Live Inspection Service,' focusing on smoke simulation and security systems, which are the main features of our inspections. Considering feedback such as "I am interested, but it's difficult to come all the way to Fukuoka" and "It's hard to coordinate schedules for multiple people," the content will be a condensed version, but we will ensure interactive communication similar to an in-person visit. 【Flow of Remote Inspection】 ■ For underfloor ventilation... Approximately 30 minutes ■ For security... Approximately 20 minutes ■ Q&A... About 10 minutes