List of service products
- classification:service
7606~7620 item / All 21411 items
Achieves high collection efficiency through electrostatic methods. Offers a wide range of products from large to small sizes. Also compatible with water-soluble oil mist.
- air conditioning
Maximum sinking of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Our method, which raises the CO pavement using the foaming pressure of rigid urethane resin, has been adopted!
- Other contract services
- Exhibition planning/construction
- Calibration and repair
The construction period is 1 day! A case study of the correction work for the sinking of the platform section inside the toll booth conducted in Saitama Prefecture in December 2012.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Correction of road surface irregularities and unevenness in a short construction period! Introducing examples of port facility repair work.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Possible to carry out without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
The ground floor slab sank due to the earthquake! A case study of improving the gaps between the floor and walls, and between the walls and ceiling.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Even in cases where the space between neighboring properties is very narrow, construction is possible! A maximum settlement of 66mm can be corrected in 3 days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Disaster recovery and emergency response for roads! 100% filling of gaps and voids with polyurethane resin.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
An example of quickly correcting the unevenness in the concrete pavement slab at a highway toll booth!
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Performed repairs for the subsidence of the toll booth! Partial corrections were also made in areas where there was a step difference with the U-shaped drainage ditch.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Correction of subsidence while checking the level! A case of pavement repair work at the entrance of a toll booth.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Conducted resin injection work while managing levels! A case completed in 4 days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair