List of Exhibition planning/construction products
- classification:Exhibition planning/construction
121~135 item / All 386 items
Reduce the workload from handling heavy objects! Here are five case studies that solved customer challenges! We are also accepting free consultations and tests tailored to your work!
- Other conveying machines
Strong cold wind from room temperature to -13°C! Depending on the usage environment, you can choose between the combo type or the separate type!
- Cooling system
April 10, 2024 (Wednesday) to April 12, 2024 (Friday) Notice of Participation in Nagoya Manufacturing World 2024
Sanwa Shiki Ventilator Co., Ltd. will be exhibiting at the 2024 Monozukuri World (Nagoya) held at Port Messe Nagoya. We will also be showcasing our large cooling fans and cool/warm ambient products. Date: April 10, 2024 - April 12, 2024 Opening: 10:00 AM Location: Nagoya Port Messe (Exhibition Hall 1) *Our booth: 19-1 We would be grateful if you could visit us if you have the time.
A case study of correcting liquefied ground due to the earthquake! A maximum settlement of about 60mm was corrected in a day and a half.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A maximum settlement of 500mm occurred! An example of correction using a combination of the up-con method and single pipe pile driving method.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Maximum sinking of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Our method, which raises the CO pavement using the foaming pressure of rigid urethane resin, has been adopted!
- Other contract services
- Exhibition planning/construction
- Calibration and repair
The construction period is 1 day! A case study of the correction work for the sinking of the platform section inside the toll booth conducted in Saitama Prefecture in December 2012.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Correction of road surface irregularities and unevenness in a short construction period! Introducing examples of port facility repair work.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Possible to carry out without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
The ground floor slab sank due to the earthquake! A case study of improving the gaps between the floor and walls, and between the walls and ceiling.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Even in cases where the space between neighboring properties is very narrow, construction is possible! A maximum settlement of 66mm can be corrected in 3 days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Disaster recovery and emergency response for roads! 100% filling of gaps and voids with polyurethane resin.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
An example of quickly correcting the unevenness in the concrete pavement slab at a highway toll booth!
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Performed repairs for the subsidence of the toll booth! Partial corrections were also made in areas where there was a step difference with the U-shaped drainage ditch.
- Other contract services
- Exhibition planning/construction
- Calibration and repair