List of Exhibition planning/construction products

  • classification:Exhibition planning/construction

121~135 item / All 388 items

Displayed results

It won't break even after 1 million repetitions! A mat switch with reliable operation, high durability, and low price. Suitable for options in machine tools as well. Please consult us about delivery t...

  • Sensors

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

We can accommodate high resistance over 10,000 ohms, with diameters ranging from approximately 30 mm to 8 inches, and we also offer thinning and chip processing arrangements!

  • Other semiconductors
  • Processing Contract
  • Wafer

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Corrected a maximum settlement of 46mm! A case where the distortion of the door frame caused by settlement was resolved.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A case study of correcting liquefied ground due to the earthquake! A maximum settlement of about 60mm was corrected in a day and a half.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A maximum settlement of 500mm occurred! An example of correction using a combination of the up-con method and single pipe pile driving method.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Maximum sinking of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Our method, which raises the CO pavement using the foaming pressure of rigid urethane resin, has been adopted!

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The construction period is 1 day! A case study of the correction work for the sinking of the platform section inside the toll booth conducted in Saitama Prefecture in December 2012.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Correction of road surface irregularities and unevenness in a short construction period! Introducing examples of port facility repair work.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Possible to carry out without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The ground floor slab sank due to the earthquake! A case study of improving the gaps between the floor and walls, and between the walls and ceiling.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Even in cases where the space between neighboring properties is very narrow, construction is possible! A maximum settlement of 66mm can be corrected in 3 days.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Disaster recovery and emergency response for roads! 100% filling of gaps and voids with polyurethane resin.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Filter

classification
Delivery Time
Location