List of Contract manufacturing products
- classification:Contract manufacturing
1531~1545 item / All 14065 items
Reduce the workload from handling heavy objects! Here are five case studies that solved customer challenges! We are also accepting free consultations and tests tailored to your work!
- Other conveying machines
Strong cold wind from room temperature to -13°C! Depending on the usage environment, you can choose between the combo type or the separate type!
- Cooling system
April 10, 2024 (Wednesday) to April 12, 2024 (Friday) Notice of Participation in Nagoya Manufacturing World 2024
Sanwa Shiki Ventilator Co., Ltd. will be exhibiting at the 2024 Monozukuri World (Nagoya) held at Port Messe Nagoya. We will also be showcasing our large cooling fans and cool/warm ambient products. Date: April 10, 2024 - April 12, 2024 Opening: 10:00 AM Location: Nagoya Port Messe (Exhibition Hall 1) *Our booth: 19-1 We would be grateful if you could visit us if you have the time.
We can consistently produce products with about 30 components from parts!
- Contract manufacturing
- Processing Contract
A case where we received high praise from customers for being able to respond quickly due to a reduction in man-hours!
- Contract manufacturing
- Processing Contract
We can produce various sizes of frames in a short delivery time!
- Contract manufacturing
- Processing Contract
High precision, no assembly process, low cost, no cracks or defects, high rotation durability!
- Resin processing machine
- Contract manufacturing
Sealing formation and in-mold cutting are also possible! We have realized products by processing various parts through insert molding.
- Resin processing machine
- Electrical equipment parts
- Contract manufacturing
We manufacture custom-made stainless steel hardware and plastic products!
- Processing Contract
- Contract manufacturing
Implement proposals that can deliver results in terms of quality and cost! Development of construction methods is also possible before equipment manufacturing.
- Contract manufacturing
For those struggling with automation and labor reduction. Proposals that can deliver results in quality and cost.
- Contract manufacturing
We propose options that meet your needs regarding equipment specifications and safety specifications!
- Contract manufacturing
It is also possible to go through stages such as method development and verification through simple trials before equipment production!
- Contract manufacturing
Equipped with a changeover station! The introduction effect is a reduction from 2 operators to 0.5 operators per team.
- Contract manufacturing
We will propose equipment specifications and safety specifications that meet your needs!
- Contract manufacturing
It is also possible to go through stages such as method development and verification through simple trials before equipment production!
- Contract manufacturing
The target tube size is φ4.74 to 6.35! The processing cycle time is 2 seconds per piece.
- Contract manufacturing
Load the entire bundle of tubes, with automatic sorting and an NG slot included! Processing cycle time is 20 seconds per unit.
- Contract manufacturing