List of air conditioning products
- classification:air conditioning
1186~1200 item / All 1726 items
Reduce the workload from handling heavy objects! Here are five case studies that solved customer challenges! We are also accepting free consultations and tests tailored to your work!
- Other conveying machines
Strong cold wind from room temperature to -13°C! Depending on the usage environment, you can choose between the combo type or the separate type!
- Cooling system
April 10, 2024 (Wednesday) to April 12, 2024 (Friday) Notice of Participation in Nagoya Manufacturing World 2024
Sanwa Shiki Ventilator Co., Ltd. will be exhibiting at the 2024 Monozukuri World (Nagoya) held at Port Messe Nagoya. We will also be showcasing our large cooling fans and cool/warm ambient products. Date: April 10, 2024 - April 12, 2024 Opening: 10:00 AM Location: Nagoya Port Messe (Exhibition Hall 1) *Our booth: 19-1 We would be grateful if you could visit us if you have the time.
After implementation, it has received great acclaim for enabling comfortable and agile activities! Here is an introduction to a case where it was introduced as a heatstroke prevention measure during t...
- air conditioning
[Heat Stroke Prevention Case Study] Saitama Prefectural Disaster Prevention Aviation Center
This is an introduction to the case study implemented at the Saitama Prefectural Disaster Prevention Aviation Center. The Saitama Prefectural Disaster Prevention Aviation Team conducts aerial firefighting and rescue operations using helicopters. This time, we introduced the "Spot Bazooka" as a measure against heatstroke during the team's intense training sessions. Until now, training inside the helicopter hangar was conducted in a very harsh environment due to the lack of air conditioning, but after the introduction, the team members have been able to operate comfortably and efficiently, receiving great praise from the members. For more details, please refer to the related products and catalog. [Overview] ■ Issues - Training inside the helicopter hangar was conducted in a very harsh environment due to the lack of air conditioning. ■ Effects - After the introduction, team members have been able to operate comfortably and efficiently, receiving great praise.
Since there are no vinyl ducts, it won't interfere with the work! Introduction of a case where approximately 117 units were installed in 7 locations.
- air conditioning
[Heat Stroke Prevention Case Study] Home Logistics Co., Ltd.
The warehouse of Home Logistics Co., Ltd. has a floor height of just under 10 meters, and cooling the entire building would incur tremendous costs. However, if left unattended, the environment can exceed 35°C in the peak summer, posing a constant risk of heatstroke. Therefore, we introduced the air conditioner 'Guppy Bazooka,' which is used in agricultural greenhouses. It delivers powerful cold air up to 50 meters away with its high airflow and static pressure (the force that pushes air). We first tried one unit, and it indeed delivered cold air up to 50 meters. Next, we purchased four more units, and the workers rated it as "excellent." As a result, approximately 117 units were installed in seven regional distribution centers (logistics warehouses) of Home Logistics. For more details, please refer to the related products and catalog. [Implementation Overview] ■ Issues - Cooling the entire warehouse would incur tremendous costs. - The environment can exceed 35°C in the peak summer if left unattended. ■ Effects - Powerful cold air reaches up to 50 meters away with high airflow and static pressure (the force that pushes air). - There are no vinyl ducts, so it does not interfere with work.
It was determined that it can be implemented at a cost of less than one-fifth of the conventional equipment costs!
- air conditioning
[Heat Stroke Prevention Case Study] Bunkyo Gakuin University Girls' Junior and Senior High School
Among the three gymnasiums in total, the main gymnasium of the academic building, which did not have air conditioning installed, had previously considered introducing air conditioning. However, due to the excessively high costs, the introduction plan was put on hold. Upon learning about our products, they decided to reconsider the installation. In the case of the "Spot Bazooka," it was found that it could be installed for less than one-fifth of the cost of conventional equipment, leading to the decision to proceed with the installation. As a result, during the summer before installation, the temperature inside the gymnasium exceeded 30 degrees Celsius, making classes and club activities difficult due to the heat. However, after the installation, it became very cool and comfortable. For more details, please refer to the related products and catalog. [Case Summary] ■ Installed Equipment: Guppy Bazooka Single Type, 4 units ■ Capacity: Maximum 7 horsepower (28 horsepower for 4 units) ■ External Dimensions and Weight - Indoor Unit: Height 920 x Width 950 x Depth 330 mm, 52 kg - Outdoor Unit: Height 1350 x Width 950 x Depth 330 mm, 90 kg
Positive feedback stating 'It was great that it could be installed quickly!' Introduction of cases where it has been implemented, mainly in elementary and middle schools.
- air conditioning
[Heat Stroke Prevention Case Study] 19 Public Elementary and Junior High School Gymnasiums in Nakano Ward, Tokyo
In Nakano Ward, we have introduced spot bazookas, focusing on the elementary and junior high schools that are planned for renovation in the future. Although there are plans for future renovations, we have implemented the introduction with a budget constraint of three units per school, and the schools that have actually used them have expressed their satisfaction, saying, "It's very cool." Since it is a lease introduction, the spot bazookas have a short installation period from planning to setup (possible within a year), and the representatives from Nakano Ward have also evaluated it positively, stating, "It was good that we could install it quickly." Additionally, the indoor and outdoor units are compact, making relocation easy. In Nakano Ward, they plan to relocate the equipment before the start of renovation work at the elementary and junior high schools to make effective use of the leased equipment. For more details, please refer to the related products and catalog. 【Introduction Overview】 ■ Nakano Ward Saginomiya Elementary School Gymnasium Indoor Unit ■ Nakano Ward Saginomiya Elementary School Gymnasium Outdoor Unit ■ Nakano Ward Eighth Junior High School Gymnasium Indoor Unit ■ Nakano Ward Eighth Junior High School Gymnasium Outdoor Unit
Cooling targeted only at the workspace! Introduction of a case study that significantly reduced air conditioning installation costs.
- air conditioning
[Heat Stroke Prevention Case Study] Shinkokugyo Co., Ltd.
Shinchu Kogyo has been considering measures against heatstroke at their automobile maintenance facility for some time. During their consideration of air conditioning systems due to their headquarters relocation, they learned about the existence of the Spot Bazooka at an exhibition. The Spot Bazooka blows cool air specifically at the work area (only where needed), which significantly reduces initial costs compared to installing a conventional air conditioning system. Furthermore, due to the nature of the maintenance facility, dust is a concern. The Spot Bazooka's environmental durability, allowing for outdoor use while being easy to maintain, was a key factor in its adoption. For more details, please refer to the related products and catalog. [After Implementation] ■ Significantly reduced initial costs ■ Environmental durability for outdoor use ■ Easy maintenance ■ The cooling air reached over 10 meters even in the semi-open maintenance facility where outside air enters, allowing workers to perform maintenance comfortably ■ Increased work efficiency
The key point is that the air conditioning's cooling airflow reaches far with a large volume of air! Introduction of case studies in vehicle maintenance facilities.
- air conditioning
[Heat Stroke Prevention Case Study] Vehicle Maintenance Facility
This is an introduction to a case study implemented at a vehicle maintenance facility. The work inside the vehicle maintenance facility was being conducted without air conditioning, but due to the ongoing extreme heat during the summer years, we were considering measures against heatstroke. As a solution, we installed one spot bazooka unit in each vehicle maintenance lane, which is the main work flow, and also installed two additional spot bazooka units on the opposite side. We considered various products, but after experiencing the actual machine at an exhibition, we decided on the Ease spot bazooka. The deciding factor was its high air volume, which allowed the air conditioning's cooling air to reach far, and after installation, the dehumidified dry air helped to dry sweat, creating a comfortable environment. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■ Installation Location: Koto Ward, Tokyo, Vehicle Maintenance Facility ■ Number of Units Installed: 7 Spot Bazooka Units ■ Installation Period: July 2020
Introducing a case study of the Spot Bazooka, which can blow cold air approximately 20 meters even inside semi-open buildings!
- air conditioning
[Heat Stroke Prevention Case Study] Hanwa Co., Ltd.
At the factory of Sanko Kogyo Co., Ltd., we have been working on heat countermeasures through the installation of fans, provision of cooling vests, and taking breaks during work when the WBGT warning temperature is reached. However, in order to further improve the workplace environment and ensure the safety of our workers, we have decided to implement more advanced measures across all sites. We are introducing our highly efficient air conditioning units at our locations nationwide. In selecting the air conditioning units, the 'Spot Bazooka,' which can blow cool air approximately 20 meters even in semi-open buildings, emerged as a strong candidate. This decision was made based on performance verification through demonstration units and confirmation of implementation results in the market. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■ A total of 99 Spot Bazookas have been installed at 20 locations nationwide (18 sales offices, including group companies, and 2 factories) as of the end of 2020. * Breakdown: 15 integrated units and 84 separate units (single type).
Introducing the implementation results and customer feedback of "Complete Factory Cool Down" for heatstroke prevention, and it's energy-saving too!
- air conditioning
Prepare for summer in winter and spring! Ventilation and air conditioning that can create a comfortable space even in large areas. Energy-saving and easy to install.
- air conditioning
Up to 8 hours of continuous operation possible! Case study of the special specification Strong Cool for educational facilities.
- air conditioning
Special specifications for educational facilities are also available! We are conducting demonstrations where you can experience the actual machine.
- air conditioning
Introducing a case study of the "Cool Breeze Plan" that cools down hot factories.
- air conditioning
Improving the operator's work environment! We support our customers in various settings.
- air conditioning
- Cooling system
- Other air conditioning equipment
Significant reduction in air conditioner power consumption! Same temperature settings and operation method, low cost, and easy installation.
- air conditioning
World's first!! Energy-saving device specialized for refrigeration equipment such as freezers, refrigerators, and chillers.
- air conditioning