We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 40 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

  1. フルサト工業 Osaka//Building materials, supplies and fixtures 建材開発部
  2. スワロー工業 Niigata//Building materials, supplies and fixtures
  3. null/null
  4. 4 null/null
  5. 5 null/null

Construction method Product ranking

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

  1. Solar Mounting System D-SWAT SAMURAI Replacement Method スワロー工業
  2. Dye Q reinforcement method *Repairs for missing areas and anti-corrosion processing are also available!
  3. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  4. 4 Rapid-curing polyurethane spray waterproofing method "Rim Spray"
  5. 5 [Free Inspection] Teratech Method to Fill Underfloor Cavities and Reduce Machine Vibration

Construction method Product List

751~765 item / All 895 items

Displayed results

CB method

It can be easily done even in narrow spaces! We will introduce the standard method for welding reinforced concrete joints.

The "CB Method" refers to enclosure welding using ceramic backing materials. After the welding operation, the backing can be removed, allowing for visual inspection of the weld appearance. This method was jointly developed by Osaka Prefecture and Aichi Institute of Technology, focusing on stable quality. It is used in various construction projects, regardless of whether they are in architecture or civil engineering, and particularly for large diameters (D35 and above), it has achieved approximately 500,000 instances per year. 【Features】 ■ High reliability of joint performance ■ Good workability of joint shape ■ Reliable quality control ■ Speedy welding operations ■ Expanding possibilities for construction methods ■ Market area: Hokuriku only *For more details, please refer to the PDF document or feel free to contact us.

  • Processing Contract
  • Welding Machine
  • Pipe Fittings

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hybrid construction method "TORNADO"

We have made it possible to clean the drainage pipes of high-rise buildings and apartments, which was previously impossible!

The "TORNADO" rotates the cleaning nozzle along the pipe wall, allowing for a fast cleaning speed and uniform cleaning across the entire surface. Since it uses water (high-pressure water) for cleaning, there are no concerns about dust or noise, making it environmentally friendly. Instead of spending a huge amount on replacement construction, it is much more cost-effective to continue using your existing shared piping by cleaning it every 1 to 2 years. 【Features】 ■ The cleaning nozzle rotates along the pipe wall for cleaning ■ Fast cleaning speed, able to clean uniformly across the entire surface ■ Cleans using only water, making it low-cost and environmentally friendly ■ Can pass through approximately 30 bends ■ Suitable for cleaning oil residues with hot water from a high-pressure pump *For more details, please refer to the PDF document or feel free to contact us.

  • High pressure cleaner
  • Other cleaning machines

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Enclosed welding method "JCe-MT method"

Work can be easily carried out even in narrow workspaces, and the backing material can be removed after welding is completed!

The "JCe-MT method" is a jointing technique that uses a ceramic backing material in a specified jig to continuously fill the groove with welding wire using a semi-automatic welding machine for two rebar pieces that are to be joined. It has the advantage of allowing easy visual inspection and ultrasonic testing, and in recent years, it has gained attention as a method capable of joining fixed rebars, which is impossible with gas pressure welding, in applications such as PC construction for high-rise condominiums and large-diameter rebars in civil engineering. [Features] ■ Certified by excellent welding construction companies and Class A joint welding construction companies. *For more details, please feel free to contact us.

  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Multi-Drill Method Equivalent to BG Method

Select from various construction machines!

We would like to introduce a case study of underground obstacle removal conducted by our company. In Tokyo, we carried out construction using a multi-drill method equivalent to the BG method. We removed PHC piles and pine piles with a diameter of 1500 mm and a length of 22 m. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: Multi-Drill Method Equivalent to BG Method ■ Construction Date: June 10, 2022 ■ Location: Tokyo ■ Details: Diameter 1500 mm, Length 22 m *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Underground Obstacle Removal Method in Tokyo (Equivalent to BG Method)

Original tools developed! Examples of removal using the all-casing crushing method.

We would like to introduce a case study of underground obstacle removal conducted by our company. This project took place in Nakano Ward, Tokyo, using an underground obstacle removal method equivalent to the BG method. It features the SR-45 standard mast specification. Piles that could not be removed using the pull-out method were removed using the all-casing crushing method. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Method (Equivalent to BG Method) ■ Construction Date: May 19, 2022 ■ Location: Nakano Ward, Tokyo ■ Details: SR-45 standard mast specification, depth of 16m *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【施工事例】マルチドリル工法による壁際地中障害撤去

いろいろな地質、地中障害物に対応!壁に接近した施工が可能な事例

当社で行った地中障害撤去の施工事例をご紹介いたします。 東京都大田区にて、マルチドリル工法(BG工法同等)による 壁際地中障害撤去を実施。周辺への影響が少ないので、壁に 接近した施工が可能です。 関連リンクにて、画像付きで本事例をご紹介しておりますので 是非ご覧ください。 【事例概要】 ■工事名:マルチドリル工法(BG工法同等)による壁際地中障害撤去 ■施工日:2022年04月08日 ■所在地:東京都大田区 ■詳細:φ1000、L=2.3m(52本) ※詳しくは関連リンクからPDFダウンロードいただくか、お問い合わせ下さい。

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Study] Special Feature on Removed Underground Obstacles - March

We have a track record of construction in various fields! We can cut, remove, and backfill underground obstacles using various methods suitable for the site.

On our company website, we introduce case studies of underground obstacle removal. This page features a special report on underground obstacles that were removed in March 2022. For more details, please refer to the related links. Our company is capable of cutting, removing, and backfilling underground obstacles using various methods suitable for the site. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Chuo Ward, Tokyo - Underground Obstacle Removal Work

Lifted using the multi-drill method! A case of removing obstacles made of hard machi stone.

We would like to introduce a case of underground obstacle removal that we conducted. In a site adjacent to the Shuto Expressway in Chuo Ward, Tokyo, we removed a hard block of rubble that had been left under the old revetment. Using the multi-drill excavator SR-45, which has the capability to remove obstacles even in adjacent areas, we lifted the rubble using the multi-drill method. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Project in Chuo Ward, Tokyo ■ Construction Date: October 12, 2020 ■ Location: Nihonbashi Hamacho, Chuo Ward, Tokyo *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] SR45 Multi-Drill Method Underground Obstacle Removal

Introducing examples of smooth removal made possible by using our independently developed tools!

We would like to introduce a case study of underground obstacle removal conducted by our company. In Nihonbashi, Chuo-ku, Tokyo, where the Shinkansen runs nearby, we used the SR45 multi-drill to remove a site construction pile with a diameter of Φ1200 and a depth of GL-22m. The removal of the site construction pile in a narrow area was extremely challenging, but by utilizing our uniquely developed Kelly grab, 3D bucket, and lightweight power jack, we were able to achieve a smooth removal. 【Case Overview】 ■ Project Name: SR45 Multi-Drill Method - Underground Obstacle Removal ■ Construction Date: September 11, 2021 ■ Location: Hon-Ishicho, Nihonbashi, Chuo-ku, Tokyo ■ Details: Φ1200 GL-22m *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles

For inquiries and requests regarding foundation work, contact us! We feature underground obstacles removed using our developed tools.

On our company website, we introduce case studies of underground obstacle removal. On this page, we feature underground obstacles that were removed using tools developed by our company. For more details, please check the related links. Additionally, we have included images of the removal status from January 2022, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (3)

We have published a feature on underground obstacles! For your foundation work needs, please feel free to contact us.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 3 of our special on removed underground obstacles. For more details, please refer to the related links. For requests regarding foundation work, including underground obstacle removal, ground improvement work, existing pile extraction work, site preparation piles, excavation support work, and installation/removal of construction platforms, please feel free to contact us. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (6)

Track record of construction in various fields! Consistent in-house construction from ground surveys to ground improvement work is possible.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 6 of our series on removed underground obstacles. For more details, please refer to the related links. Our company is capable of consistent in-house construction from ground surveys to ground improvement work. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (8)

In the multi-drilling method, tools are selected and constructed according to the situation! Original tools are also developed.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 8 of our series on removed underground obstacles. For more details, please refer to the related links. Our company has also developed original tools and has achieved many results in various field situations. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Sagamihara City, Midori Ward, T Column New Construction and Renovation Work

A total of 290 construction locations with an excavation length of approximately 10m! An example of columnar improvement work using the T-column method.

We would like to introduce a case study of the ground improvement work conducted by our company. In a vast area in Tsukui, Sagamihara City, we performed columnar improvement work using our original deep mixing method and T-column method. Due to the construction involving 290 locations and an excavation depth of approximately 10 meters, we installed a 30-ton silo and plant for the solidifying agent. The solidifying agent was delivered daily, and the work was successfully completed. 【Case Overview】 ■ Project Name: T-Column New Construction and Renovation Work in Midori Ward, Sagamihara City ■ Construction Date: March 16, 2020 ■ Location: Chigira, Midori Ward, Sagamihara City *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Atsugi City Surface Improvement Using Mixing Bucket

Introducing a case of surface improvement related to new construction work conducted in Atsugi City, Kanagawa Prefecture!

We would like to introduce a case study of ground improvement work carried out by our company. In Atsugi City, Kanagawa Prefecture, we performed surface improvement work associated with the new construction of the Atsugi Fire Station South Mouri Branch. A mixing bucket was attached to a 0.7 backhoe, and we mixed 162 tons of solidifying material for an area of 893 m². 【Case Overview】 ■ Project Name: Surface Improvement in Atsugi City Using a Mixing Bucket ■ Construction Date: October 14, 2020 ■ Location: Nagase, Atsugi City, Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration