I want to shorten the construction lead time for expanded polystyrene insulation material.
Pre-cut, which leads to a shortened construction period.
In the case of wall insulation, Matsubara Sangyo Co., Ltd.'s insulation materials are precut one by one at a dedicated factory to fit between the columns and studs, and delivered accordingly. This eliminates the need for cutting on-site and contributes to shorter delivery times. Additionally, during exterior insulation installation, we can also accept layout drawings and precut each piece for delivery, further reducing on-site cutting efforts and contributing to expedited delivery. 【Features】 - Each piece is precut at a dedicated factory to fit between the columns and studs. - Eliminates the need for cutting on-site, contributing to shorter delivery times. - During exterior insulation installation, we can accept layout drawings and precut each piece for delivery. For more details, please contact us.
- Company:松原産業
- Price:Other