[Case Study] DAS System
Make effective use of limited space! Introducing examples of efficient sorting workflows.
We would like to introduce a case study of the implementation of the "DAS System" at Stork Co., Ltd. The company had been considering a system replacement for a long time due to the aging of their logistics system, which was introduced about ten years ago, and the poor maintenance structure. With the introduction of this system, the display improved from a two-color display to a three-color lamp, making it easier to see. Additionally, various desired reports can now be generated in a timely manner, resulting in an overall increase in speed and a reduction in errors. [Objectives/Requests] ■ We want to improve productivity compared to the current situation. ■ We want to enhance operational efficiency in a limited space. ■ We want to replace the system with a stable one. ■ We want to achieve system replacement without modifying the upper-level systems. *For more details, please refer to the related links or feel free to contact us.
- Company:イシダテクノ
- Price:Other