[Case Study of Sofir] Decontamination Dump Waiting Area within the Intermediate Storage Facility Zone
The processing capacity is 96 people, 5.1m3/day! An example of a soil microbial membrane combined treatment purification tank in Iwaki City, Fukushima Prefecture.
We would like to introduce a case where our "Sofeel" was implemented at the decontamination dump waiting area within the interim storage facility area in Iwaki City, Fukushima Prefecture. The construction system is "Sofeel Discharge," with a processing capacity of 96 persons and 5.1 m³/day. This product is a soil microbial film combined treatment purification tank. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Construction Location: Iwaki City, Fukushima Prefecture ■ Construction Period: 2019 ■ System: Sofeel Discharge ■ Processing Capacity: 96 persons, 5.1 m³/day ■ Client: Ministry of the Environment, Fukushima Regional Environmental Office *For more details, please refer to the PDF materials or feel free to contact us.
- Company:ソフィール協会 (事務局)アルコ株式会社
- Price:Other