We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for 3D CAD.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

3D CAD Product List and Ranking from 41 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Aug 27, 2025~Sep 23, 2025
This ranking is based on the number of page views on our site.

3D CAD Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Aug 27, 2025~Sep 23, 2025
This ranking is based on the number of page views on our site.

  1. アシストナビ Kanagawa//others
  2. 東邦製作所 Tokyo//Industrial Machinery
  3. null/null
  4. 4 ソシアパーティション (旧 株式会社コマツパーティション) Tokyo//Other manufacturing
  5. 5 コダマコーポレーション 本社、大阪営業所、名古屋営業所 Kanagawa//CAD/CAM

3D CAD Product ranking

Last Updated: Aggregation Period:Aug 27, 2025~Sep 23, 2025
This ranking is based on the number of page views on our site.

  1. Research, Development, and Evaluation "TEG Wafer" アシストナビ
  2. Control motor (electric operation device) CAD data 東邦製作所
  3. Socia partition CAD data ソシアパーティション (旧 株式会社コマツパーティション)
  4. 4 Electric valve and solenoid valve CAD data 東邦製作所
  5. 4 Data Integrity Compliance Software for Laboratory Process Management メトラー・トレド

3D CAD Product List

91~105 item / All 175 items

Displayed results

3D CAD "KEYCREATOR"

Fusion of 3D functionality and 2D drawing capabilities! Comprehensive support for the design trial and error process.

"KEYCREATOR" is a system that allows anyone to easily create 3D models with the feeling of drawing three-view drawings in 2D design. By avoiding careless mistakes during 2D design, it achieves a reduction in design time. By effectively utilizing existing 2D data, it eliminates the hassle of re-entering shapes while referring to 2D drawings, and thanks to interfaces with various 3D CAD systems, smooth work can be done without the need for intermediate file data compatibility. [Features] ■ Direct editing is possible even with data converted from other CAD systems. ■ 2D drawings, 3D wires, surfaces, and solids can all be used together in the same space. ■ Direct shape changes can be made simply by changing the dimension numbers. *For more details, please refer to the PDF materials or feel free to contact us.

  • Other CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the Engineering Division of Japan System Eight Co., Ltd.

Leave the development of automatic inspection devices and clinical testing systems to us.

At Japan System Eight Co., Ltd.'s Engineering Division, we mainly engage in the development of automatic control devices using PC and microcontroller control, as well as the design and production of various dedicated boards. We possess various operating systems such as Windows Server and Linux, and support development languages including C language and Visual Studio 2005 (C++, C#). 【Business Activities】 ■ Development of automatic control devices using PC and microcontroller control ■ Design and production of various dedicated boards ■ Design and development of various dedicated applications, database and network construction *For more details, please refer to our catalog or feel free to contact us.

  • Other contract manufacturing
  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Precast BIM Software Tekla Structures

Structural BIM software 'Tekla Structures' achieves productivity improvement and cost reduction through detailed structural calculations.

"Tekla Structures" allows for the construction of 3D models of precast concrete structures and enables the management of various information related to manufacturing and construction on a BIM model. By creating 3D models of concrete and rebar components, it can be utilized from basic design to structural calculations, detailed design, site construction, and management, achieving improvements in productivity and cost reduction. In the 3D model, it is possible to check in advance the intersections between rebars, the interference between rebars and steel frames, and the interference with equipment, thereby eliminating issues on site. The placement, joints, and anchoring of rebars can be automatically generated simply by specifying the parameters of the provided components, allowing for accurate tracking of material quantities. From the model, necessary drawings and documentation for manufacturing and construction, such as axis diagrams, rebar detail drawings, and rebar processing drawings, are automatically generated, enabling quick responses to design changes and avoiding inconsistencies between design information and manufacturing drawings. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special site below ⇩

  • 3D CAD
  • 2D CAD Construction
  • antenna

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Stadium Renovation Project

Transmitting vertical loads to two linked pendulums! Introducing a case where circulation within the stadium has improved!

We would like to introduce a case study on the introduction of BIM software for the Santiago Bernabéu Stadium renovation project. The new fixed roof, which uses over 9,000 tons of steel, consists of two trusses spanning 177 meters in length and four cross trusses measuring 144 meters in length. This roof is retractable and splits into two panels that slide over the inner cross trusses. The panels are made up of five air-inflatable cushions measuring 72×7 meters, positioned between six steel hybrid trusses with a span of 72.5 meters. Additionally, during the assembly process, the main truss, which served as a guide for the other trusses, transmits vertical loads to two new evacuation towers on the west side and two linked pendulums integrated into the building on the east side, while completely isolating horizontal loads from the existing structure. The redevelopment of the stadium also includes the installation of a video scoreboard. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special site below ⇩

  • 3D CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Offshore Platform

We will introduce a case where the use of advanced tools successfully achieved an efficient design process!

The "Azeri Central East (ACE) Project" has become the second largest and most important project for AZFEN. By utilizing advanced tools of Tekla software, such as custom components (streamlining customizable modeling features), templates, and macros, the project has successfully achieved an efficient design process. The project focuses on the production and drilling at the new 48-slot site, as well as a distribution platform located at a depth of 140 meters between the existing Central Azeri and East Azeri platforms. Additionally, the project includes an infield pipeline that transports oil and gas from the ACE platform to the existing ACE Phase 2 transportation pipeline. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 3D CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] AFAS Stadium

An example of minimizing miscommunication and work-related errors!

In August 2019, part of the roof of the Morenaar Stand at AFAS Stadium collapsed due to strong winds. Fortunately, there were no matches taking place, and no injuries were reported, but the damage was significant. There was a design flaw in the structural joints, with insufficient thickness in the welds, and damage from strong winds experienced in the past contributed to the collapse. At the end of 2019, ASK Romein was selected for the design and structural engineering, and they began collaborating with BAM Bouw en Techniek. BIM was maximally utilized throughout the engineering process, enabling clear communication among project stakeholders and seamless interaction between different software. Since there are many points of contact between the existing structure and the new structure, point cloud data measured with a 3D scanner is being used in the engineering and assembly processes. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 3D CAD
  • antenna
  • 2D CAD Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Boat Landing

Boat landing of AME-2 and AWG-1! Effective design collaboration has been achieved!

Pinnacle has been appointed as the structural engineering consultant to support the development and structural engineering of safe and reliable boat landings (docks) off the coast of the Netherlands. The main engineering challenge was to install the boat landing on the existing jacket between the sea surface and the platform's "spider deck." The company evaluated the design, as well as wind, wave, tide, and impact conditions, and then analyzed the structure of the boat landing to carry out detailed design using "Tekla Structures." By involving the steel fabricator, vessel operators, and installation and rope access contractors from the structural design and detailed design stages, reliable work was carried out in the manner recommended by the main clamp and frame installation contractors. The cost efficiency was very high, and despite the challenging conditions, there were no accidents, and no modifications were needed on-site. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special site below ⇩

  • 3D CAD
  • antenna
  • 2D CAD Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Pepper Tree Quarry

Conducted 3D laser scanning and integrated it as a point cloud on the reconstructed Tekla model!

In 2013, Sandvik received a project from their client Boral for a quarry located in Pepper Tree. The factory, located in Sydney, Australia, is equipped with six crushers, nine screening machines (vibrating screens), a conveyor belt approximately 3.4 km long, and a fully automated loading system. This project was one of the more complex ones undertaken by the company. The main challenge was integrating the complex new equipment into the existing factory, which had not been designed for it, and not all existing blueprints were available. By importing from other applications, utilizing past Tekla models, and performing rough modeling of the remaining parts, a complete three-dimensional model of the factory was reconstructed in "Tekla Structure" using the existing model and drawing information. Scanning the existing factory with Trimble's 3D laser scanner made it possible to compare the model with the actual factory, serving as the foundation for the design of the new equipment. *For more details, please feel free to contact us. ⇩ The catalog can be downloaded from the special website below ⇩

  • 3D CAD
  • antenna
  • 2D CAD Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Steel Structural Design of Waste Heat Recovery Boiler

The top part has an external platform with access to the chimney platform!

In the project for the steel structure design of the boiler building and the work and inspection platform for the waste heat recovery boiler implemented in Kazinbarcika, Hungary, we have carried out the basic design, detailed design, and creation of documentation for the structure. We undertook the basic design of the boiler building, detailed design including the outer walls, external stairs, and joints of the platform, as well as the creation of documentation for manufacturing. The main platform is equipped with grating, and there are stairs and ladders installed between each platform for movement routes. The entire structure is painted, with only the grating and stair steps galvanized, and the weight of the steel frame is 150 tons. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special site below ⇩

  • 3D CAD
  • antenna
  • 2D CAD Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Bjelgste Office Building

We combine traditional building materials like wood with modern design and manufacturing techniques!

"Birgstad Financial Park" was constructed as an office building for SpareBank 1 in Stavanger, Norway. The above-ground structure uses wood (a natural, renewable, and locally sourced material) as the primary load-bearing element. The floors are made of cross-laminated timber panels, supported by laminated beams and columns. The main wooden components are designed with strength in mind, and through high-precision processing, most of the wood can be directly joined without the use of metal fasteners, thereby shortening the construction process. Thanks to the advanced modeling technology of "Tekla Structures," the beams not only achieve aesthetic beauty but also meet practical requirements. *For more details, please refer to the PDF document or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 3D CAD
  • antenna
  • 2D CAD Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Transformation of North Sea Oil Field Platform Construction

Efficient design and manufacturing automation! Achieving advanced automation in the design and manufacturing processes!

The two platforms of the Johan Sverdrup oil field are designed and manufactured by the Norwegian company Aibel. Currently, the company's massive project is transitioning from a shipyard in the tropical region of Thailand to the rough seas of the North Sea. This project faced challenges such as compliance with standard requirements in the oil and gas industry and the integration of Tekla software with existing solutions. To address these challenges, experts in three-dimensional design using Tekla software collaborated to successfully semi-automate the drawing creation process with Tekla. They generated accurate information in a data format suitable for collaboration with machine tools, achieving up to 95% efficiency in the company's production labor and quality. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 3D CAD
  • antenna
  • 2D CAD Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration