[Construction Example] Disaster Recovery Concrete Pavement Slab Settlement Correction Work
Our method, which raises the CO pavement using the foaming pressure of rigid urethane resin, has been adopted!
We would like to introduce a case of "Disaster Recovery Concrete Pavement Slab Settlement Correction Work" conducted on the Route 4 Bypass in Koriyama City, Fukushima Prefecture. This was a restoration project for the CO pavement slabs of the Route 4 Koriyama Bypass, which were damaged and settled due to the Great East Japan Earthquake. Our method was adopted, which raises the still sound CO pavement slabs using the foaming pressure of rigid polyurethane resin, while keeping traffic restrictions limited to lane reduction during construction without replacing them. 【Case Overview】 ■ Construction Area: Approximately 2,430 m² ■ Area: Route 4 Bypass in Koriyama ■ Construction Period: 24 days (March 2013) ■ Client: Tohoku Regional Development Bureau, Koriyama Route Office *For more details, please refer to the PDF document or feel free to contact us.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other