[Construction Example 11] Hot Spring Inn Roof Snow Melting (Hot Water Type, Concealed Method)
The heat source unit that was replaced a few years ago is still in use! An example where the entire roof has started to melt evenly.
We would like to introduce a case study of roof snow melting (hot water type, concealed method) installation. We received a consultation from a quiet hot spring inn that is usually hit by over 2 meters of heavy snow each year, stating, "The roof snow melting system installed over a decade ago is not working well, and despite consuming a lot of fuel, it is not melting effectively. We would like some assistance." The heat source unit that was replaced a few years ago will continue to be used, but almost everything else, including panels, copper pipes, supply pipes, and controls, will be replaced. As a result, the entire roof has started to melt evenly, leading to a resolution of the issue. 【Case Overview】 ■ Nagaoka City, Niigata Prefecture ■ Kerosene boiler ■ 607m2 *For more details, please refer to the PDF document or feel free to contact us.
- Company:北越融雪
- Price:Other