Directly linked to cost reduction: Significant reduction in processing time for stainless steel parts.
Total processing time reduced from 200 minutes to 50 minutes! Introduction of a case study on stainless steel processing.
Here is a case study on the improvement of aircraft parts processing. The material is precipitation-hardened stainless steel. Before the improvement, the number of processing steps was 4, but by reviewing tool selection and material holding, it was improved to 2 steps. The total processing time was reduced from 200 minutes to 50 minutes. 【Case Study】 ■ Change of processing path: groove cutting → trochoidal (side) processing ■ Significant reduction of non-cutting time → elimination of wasted time ■ Review of tool selection → suitable for the material and large-diameter tools ■ Review of material holding → jigs that enable high-efficiency processing *For more details, please refer to the PDF document or feel free to contact us.
- Company:タアフ
- Price:Other