[Processing Example] Consistent support from tube bending and coining bending to assembly.
Introducing a case where we implemented a design that allows for the reduction of engineering work, enabling delivery in a short timeframe!
We would like to introduce a case where we manufactured bent parts and cylindrical rolled parts, and finally completed the riveting process. This time, we received a request for a short delivery time of 300 pieces in 10 days, so it was necessary to quickly complete the bending process before riveting. To achieve this, our company developed an in-house mold with improvements to reduce the process steps, enabling us to meet the short delivery deadline. 【Case Overview】 ■ Material: SECC ■ Size: 50×30×25mm ■ Plate Thickness: t2.0/t1.2 ■ Precision: ±0.1 ■ Quantity: 300 ■ Delivery Time: 10 days *For more details, please refer to the PDF document or feel free to contact us.
- Company:西野精器製作所
- Price:Other