[Construction Example] Large Shopping Center: Correction of Sunken Concrete Floor
Correction made during the night while operations were suspended! A case where two construction plant vehicles were used to expedite the construction schedule.
A large shopping center experienced significant floor subsidence due to weak ground. Gaps were observed in various places, such as between the floor and walls and between the walls and ceiling, caused by the subsidence. As a result, our company implemented repairs. The "Upcon Method," which can be executed during nighttime while the business is closed, was adopted for the repairs. To expedite the construction period, two construction plant vehicles were utilized, and the repairs were completed over 25 nights. 【Construction Overview】 ■ Construction Area: Approximately 3,240m2 (Backyard 405m2, Inside Store 2,835m2) ■ Maximum Subsidence: 94mm ■ Repairs completed over 25 nights ■ Two construction plant vehicles used to expedite the construction period For more details, please feel free to contact us via PDF download or inquiry form.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other