1~2 item / All 2 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Contact this company
Inquiry Form1~2 item / All 2 items

The Waste Regulation Division of the Ibaraki Prefectural Department of Citizen Life and Environment faced issues with the costs associated with surveying depending on the scale of the site, as well as the number of days required to obtain survey results, which was followed by a significant amount of time needed for document preparation. To address this, we introduced the cloud-based on-site management DX tool "Kumiki." Before its implementation, simple surveying tasks were carried out with the cooperation of many staff members, but now they can be handled by just two people. We received feedback stating, "The alignment feature is excellent, and it allows for easy comparison of images taken at different times, making it extremely useful." [Challenges] ■ Costs vary depending on the scale of the site ■ It takes days to obtain survey results ■ Document preparation requires a significant amount of time *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case study on the implementation of the cloud-based on-site management DX tool "Kumiki" at Mizukura Group Co., Ltd. The company faced the challenge of requiring 2 to 3 days of work with 2 to 3 personnel when there were multiple embankments to measure. After the implementation, it took only a few tens of minutes for drone photography and about ten minutes for measurements using the drone surveying function of our product, all manageable by a single person. This resulted in a significant reduction in both work time and personnel. [Challenges] ■ Required 2 to 3 days of work with 2 to 3 personnel ■ A system capable of using point cloud data is necessary to adapt to future construction DX *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration