iPROS Manufacturing
  • Search for products by classification category

    • Electronic Components and Modules
      Electronic Components and Modules
      57032items
    • Machinery Parts
      Machinery Parts
      71997items
    • Manufacturing and processing machinery
      Manufacturing and processing machinery
      96512items
    • Scientific and Physics Equipment
      Scientific and Physics Equipment
      33551items
    • Materials
      Materials
      35211items
    • Measurement and Analysis
      Measurement and Analysis
      52826items
    • Image Processing
      Image Processing
      14800items
    • Control and Electrical Equipment
      Control and Electrical Equipment
      50726items
    • Tools, consumables, and supplies
      Tools, consumables, and supplies
      63190items
    • Design and production support
      Design and production support
      11918items
    • IT/Network
      IT/Network
      41453items
    • Office
      Office
      13482items
    • Business support services
      Business support services
      32244items
    • Seminars and Skill Development
      Seminars and Skill Development
      5736items
    • Pharmaceutical and food related
      Pharmaceutical and food related
      25758items
    • others
      60823items
  • Search for companies by industry

    • Manufacturing and processing contract
      7341
    • others
      5034
    • Industrial Machinery
      4426
    • Machine elements and parts
      3283
    • Other manufacturing
      2871
    • IT/Telecommunications
      2533
    • Trading company/Wholesale
      2466
    • Industrial Electrical Equipment
      2314
    • Building materials, supplies and fixtures
      1815
    • software
      1642
    • Electronic Components and Semiconductors
      1563
    • Resin/Plastic
      1486
    • Service Industry
      1432
    • Testing, Analysis and Measurement
      1132
    • Ferrous/Non-ferrous metals
      979
    • environment
      702
    • Chemical
      631
    • Automobiles and Transportation Equipment
      559
    • Printing Industry
      509
    • Information and Communications
      451
    • Consumer Electronics
      420
    • Energy
      323
    • Rubber products
      313
    • Food Machinery
      303
    • Optical Instruments
      280
    • robot
      272
    • fiber
      251
    • Paper and pulp
      232
    • Electricity, Gas and Water Industry
      170
    • Pharmaceuticals and Biotechnology
      166
    • Warehousing and transport related industries
      145
    • Glass and clay products
      141
    • Food and Beverage
      132
    • CAD/CAM
      121
    • retail
      109
    • Educational and Research Institutions
      107
    • Medical Devices
      101
    • Ceramics
      95
    • wood
      89
    • Transportation
      83
    • Medical and Welfare
      62
    • Petroleum and coal products
      61
    • Shipbuilding and heavy machinery
      52
    • Aviation & Aerospace
      49
    • Fisheries, Agriculture and Forestry
      40
    • Public interest/special/independent administrative agency
      29
    • equipment
      25
    • self-employed
      23
    • Government
      20
    • Materials
      20
    • Research and development equipment and devices
      18
    • Mining
      17
    • Finance, securities and insurance
      13
    • Individual
      10
    • Restaurants and accommodations
      9
    • cosmetics
      9
    • Police, Fire Department, Self-Defense Forces
      7
    • Laboratory Equipment and Consumables
      4
    • Contracted research
      3
    • Raw materials for reagents and chemicals
      2
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Electronic Components and Modules
  • Machinery Parts
  • Manufacturing and processing machinery
  • Scientific and Physics Equipment
  • Materials
  • Measurement and Analysis
  • Image Processing
  • Control and Electrical Equipment
  • Tools, consumables, and supplies
  • Design and production support
  • IT/Network
  • Office
  • Business support services
  • Seminars and Skill Development
  • Pharmaceutical and food related
  • others
Search for Companies
  • Search for companies by industry

  • Manufacturing and processing contract
  • others
  • Industrial Machinery
  • Machine elements and parts
  • Other manufacturing
  • IT/Telecommunications
  • Trading company/Wholesale
  • Industrial Electrical Equipment
  • Building materials, supplies and fixtures
  • software
  • Electronic Components and Semiconductors
  • Resin/Plastic
  • Service Industry
  • Testing, Analysis and Measurement
  • Ferrous/Non-ferrous metals
  • environment
  • Chemical
  • Automobiles and Transportation Equipment
  • Printing Industry
  • Information and Communications
  • Consumer Electronics
  • Energy
  • Rubber products
  • Food Machinery
  • Optical Instruments
  • robot
  • fiber
  • Paper and pulp
  • Electricity, Gas and Water Industry
  • Pharmaceuticals and Biotechnology
  • Warehousing and transport related industries
  • Glass and clay products
  • Food and Beverage
  • CAD/CAM
  • retail
  • Educational and Research Institutions
  • Medical Devices
  • Ceramics
  • wood
  • Transportation
  • Medical and Welfare
  • Petroleum and coal products
  • Shipbuilding and heavy machinery
  • Aviation & Aerospace
  • Fisheries, Agriculture and Forestry
  • Public interest/special/independent administrative agency
  • equipment
  • self-employed
  • Government
  • Materials
  • Research and development equipment and devices
  • Mining
  • Finance, securities and insurance
  • Individual
  • Restaurants and accommodations
  • cosmetics
  • Police, Fire Department, Self-Defense Forces
  • Laboratory Equipment and Consumables
  • Contracted research
  • Raw materials for reagents and chemicals
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Energy
  3. Aggreko Japan
  4. Product/Service List
Energy
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

Aggreko Japan

addressTokyo/Chiyoda-ku/9th Floor, Marunouchi North Exit Building, 1-6-5 Marunouchi, WeWork Marunouchi North Exit
phone090-1699-8843
  • Special site
  • Official site
last updated:Dec 12, 2025
Aggreko Japanlogo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(25)
  • catalog(10)
  • news(0)

Aggreko Japan List of Products and Services

  • category

1~7 item / All 7 items

Displayed results

Filter by category

発電機レンタル 発電機レンタル
変圧器のレンタル 変圧器のレンタル
ロードバンクのレンタル ロードバンクのレンタル
事例 事例
蓄電池(BESS)について 蓄電池(BESS)について
事例

事例

事例集について

[Case Study] Robust System Integration Testing for a Newly Established Data Center

Obtained certification from Uptime Institute! A case study of data center commissioning.

We would like to introduce a case where we provided an advanced comprehensive testing solution that enables digital control and synchronization to colocation service providers based in Asia. The company needed to conduct a Level 5 System Integration Test (IST) as part of the commissioning process to validate the power and cooling infrastructure. Through a digitized load testing solution, we provided detailed test data and reports to corporate clients investigating the resilience of their facilities. This also led to obtaining Tier III certification from the global data center certification body, the Uptime Institute. [Challenges] - There was a need to conduct a Level 5 System Integration Test as part of the commissioning process to validate the power and cooling infrastructure. - There was a possibility that operations within the data center could become congested, leading to a complex and inefficient process. *For more details, please download the PDF or feel free to contact us.*

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study] Commissioning of a Hyperscale Data Center in Japan

A case that enabled the operation of a hyperscale data center within a specified period and budget.

We would like to introduce a case study that made it possible to conduct performance testing of various scenarios in a hyperscale data center for global enterprises at the Collocation Data Center. In the company's facility, thorough testing and commissioning were essential to ensure that various infrastructures of the data center, such as power and cooling systems, were functioning without issues and to confirm the complete operational capability and fault tolerance of the data center. Aggreko conducted a site survey and determined that a combination of 200kW load devices, LV cables, and connectors was optimal for the customer's data hall. A total of 32 load devices, amounting to 4.8MW, were prepared to simulate the thermal load on the data center's power, cooling, and infrastructure. As a result, it was guaranteed that the system would operate appropriately under various scenarios and meet the stringent industry standards and regulations regarding uptime and energy efficiency. [Case Summary] ■ 200kW Load Devices: 32x ■ LV Cable Length: 11.2km ■ Data Hall Capacity: 4.8MW *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Example] Supplying electricity to a newly constructed high-rise building.

Power supply in just a few days! A case where time and costs were saved from start to finish.

We would like to introduce a case where we provided a compact and powerful mobile generator along with complete technical support to a major construction company in the United States. The company needed to rapidly supply power to high-rise buildings in densely populated urban areas. By avoiding downtime of 6 to 8 weeks, construction was able to start immediately. By providing reliable power similar to grid electricity with a ready-to-go package, they avoided costly delays and significantly reduced costs. [Challenges] - There was a need for adequate electrical capacity. - They had to prepare compact and smart equipment that could operate automatically. - Sufficient power needed to be supplied to a 20-story building. *For more details, please download the PDF or feel free to contact us.*

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Example] Drying the construction site

A case where a building affected by winter water damage was rapidly dried using a modular system installed in four buildings.

We would like to introduce a case where Ashcourt Group implemented a modular mobile heater and a 30kVA generator. At the company's construction site, winter weather caused damage to the interiors, leading to delays and difficulties for the workers. To address this, they installed equipment that combined a 125kW heater with ducts connected to a 30kVA generator. To minimize the installation area, it was connected to a 1,000-liter fuel tank. As a result, they were able to overcome the adverse winter weather and adhere to the project schedule. [Challenges] - There were delays in the construction schedule for four student dormitories. - Winter weather caused damage to the interiors. *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Example] Continuously cooling the rocket motor.

Simulating sub-zero conditions in the heat of the Utah desert! A case of continuously cooling a motor in extreme heat.

We would like to introduce a successful case of testing a crewed flight solid rocket motor, made possible by the introduction of a specially designed adaptable air cooling system for Orbital ATK. The cooling motor test was a crucial test to prove that the motor could operate at low temperatures, but it was necessary to keep the motor and propellant at 40°F (5°C). Maintaining such low temperatures in the testing facility in Utah, where temperatures exceed 100°F (38°C), was extremely challenging. Our company designed an air cooling system equipped with a chiller unit that has three double-stacked low-temperature air handlers with defrost capabilities. Just before the live test, we removed the equipment from the building and operated a custom air duct system to cool the DM-2 joint until one minute before the rocket launch. [Challenges] - It was necessary to keep the motor and propellant at 40°F (5°C). - An integrated electric defrosting device was required. - It was essential to maintain the air at the appropriate temperature. *For more details, please download the PDF or feel free to contact us.*

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Nitrogen cooling for ammonia production plants]

A case of a two-stage system that cools outside air, increasing the air flow rate to winter flow levels.

We would like to introduce a case where the flow rate returned to winter levels at an ammonia plant in the southeastern United States, resulting in an improvement in ammonia production to 38 tons per day. The company attempted to restore the flow rate by cooling the air entering the compressor, but the reliability of the cooling system was poor, and it could not maintain the necessary air flow rate. As a solution, a two-stage system was devised to cool the outside air, and an air conditioning unit was designed to cool the outside air within the filter housing. The two-stage system increased the air flow rate to winter levels, approximately 48,000-50,000 pounds per hour, even when the temperature rose, achieving an air flow rate of about 5,550-7,500 pounds per hour. [Challenges] - The density of outside air in summer is low, leading to a decrease in flow rate and a reduction in ammonia production. - The reliability of the cooling system was poor, and it could not maintain the necessary air flow rate. *For more details, please download the PDF or feel free to contact us.*

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Example] Continuously cooling the data center

Designed with the improvement of cooling water performance and continuous availability in mind! A case study achieving facility upgrades with zero downtime.

We would like to introduce a case where a system designed with a focus on improving the performance of cooling water and continuous availability was implemented at a data center in the United States. A major data center handling millions of retail transactions had to upgrade its cooling system during the shopping season, necessitating a temporary temperature control system. Our engineers teamed up with cooling tower specialists to design a 1,600-ton temporary cooling system to meet the customer's needs and increased load. During a two-week period, our temporary cooling system maintained the appropriate temperature for the data center. [Case Summary] ■ Challenge: Continue operating the data center in optimal condition during peak shopping season ■ Solution: Chillers and cooling towers designed for maximum availability ■ Result: Facility upgrade, zero downtime, numerous satisfied customers *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1 Next
  • 【イプロス初主催】AIを活用したリアル展示会!出展社募集中

    【イプロス初主催】AIを活用したリアル展示会!出展社募集中

  • 塗装・乾燥の課題を解決。回転シャッター・巻取りスノコの資料進呈

    塗装・乾燥の課題を解決。回転シャッター・巻取りスノコの資料進呈

  • 金属・化学・窯業・食品・医薬品などのほぐし・解砕・ふるい分けがこれ一台 解砕機構付き佐藤式振動ふるい機 つばさ デモ実施中!
  • イプロスAI活用プラン新登場 貴社の“欲しいリード”がより多く手に入る! 資料進呈
    • Contact this company

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.