1~42 item / All 42 items
Displayed results
Filter by category
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Contact this company
Inquiry FormBefore making an inquiry
Download Profile1~42 item / All 42 items
Filter by category

Check the condition of existing openings, steel frames, and rails, and manufacture and install the door body, reinforcement frame, running parts, and fixed fittings! We are currently distributing examples of cases where adjustments were made to the fitting and opening/closing operation, resulting in a safe and easy-to-use entrance. 【Recommended for the following issues】 ◆ There were signs of corrosion and wear on the rails and guide parts of the existing door, raising concerns about opening/closing functionality and safety. ◆ Due to the large opening, strength to support the door stably and compatibility with the existing building structure are required. ◆ Construction tailored to the site is needed while ensuring the entry and exit of vehicles and workers. For detailed case information, please check the catalog download. For inquiries about delivery conditions, on-site surveys, or details of past plant construction cases, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We manufacture custom piping that meets your requirements and delivers it with assured quality and dimensional accuracy! We are currently distributing examples of projects where we consistently carried out processes from checking drawings and connection conditions to opening processing, temporary assembly, welding, finishing, and painting. 【Recommended for the following issues】 ◆ Need piping with shapes, branching angles, and flange positions that are difficult to accommodate with standard products ◆ Want to ensure dimensional accuracy and quality For detailed case studies, please check the catalog download. For inquiries about delivery conditions, on-site surveys, or details of past plant construction cases, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Manufacturing and installation of steel frame umbrellas for outdoor facilities! We are distributing examples where we manufactured the central pillar, circular ring frame, radial beams, and reinforcements, and conducted on-site construction, assembly, and adjustments, finishing it as a roof substrate. 【Recommended for these concerns】 ◆ Manufacturing and installation of large-diameter steel frame umbrellas for outdoor use according to design specifications ◆ Accurately aligning the connections of the circular ring and radial materials, as well as the alignment, height, and level of the central pillar on-site For more details on the examples, please check the catalog download. For inquiries about delivery conditions, on-site surveys, or details of past plant construction examples, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
After confirming the local situation, we provide a consistent response from the fabrication of the steel structure for the mezzanine to its installation on-site! We include flooring materials, handrails, and stairs in the construction, ensuring strength and safety suitable for the usage environment while achieving a user-friendly layout. We are currently distributing examples of this. 【Recommended for these concerns】 ◆ Insufficient storage space within the factory ◆ Want to increase storage capacity within a limited area ◆ Want to secure safe access routes and a convenient upper workspace For detailed examples, please check the catalog download. For inquiries about delivery conditions, on-site surveys, or details of past plant construction examples, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Confirm the local dimensions and the installation of existing lines, and manufacture the belt conveyor, inclined conveyor, feed hopper/shoot, and exterior cover! We are currently distributing examples of consistent support from planning the delivery order to installation, connection, and position adjustment. 【Recommended for these concerns】 ◆ I want to fit multiple conveying equipment at the designated height and angle within a limited space where existing equipment, pathways, and stairs are in close proximity. ◆ Material handover is necessary between each piece of equipment. For detailed case information, please check the catalog download. For inquiries about delivery conditions, on-site surveys, or details of past plant construction examples, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
To secure an access route to the upper part of existing equipment, new steel stairs, landings, and handrails have been installed! We are distributing examples where support frames were installed in a configuration that avoids interference with surrounding equipment, while confirming the integration with the equipment itself, piping, and installation surfaces. 【Recommended for these concerns】 ◆ There is a need to secure a safe access route to the upper part of existing equipment. ◆ A configuration that avoids interference with surrounding conditions such as the equipment itself and piping is required. ◆ As equipment used outdoors, safety and visibility, including treads, landings, and handrails, are necessary. For more details about the examples, please check the catalog download. For inquiries about delivery conditions, on-site surveys, or details of past plant construction examples, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Air piping work (screw-in type) inside the building is underway! We are currently distributing a case where we consistently handled everything from piping construction to installation while organizing the piping route along the indoor ceiling and confirming the branching and support positions. 【Recommended for these concerns】 ◆ It is necessary to secure a long-distance piping route along the ceiling to supply air throughout the indoor space. ◆ Balancing aesthetics and workability. For more details on the case, please check the catalog download. For inquiries about delivery conditions, site surveys, or details of past plant construction cases, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
After confirming the local conditions, we developed a construction plan and carried out the replacement work using a large crane and aerial work platform! We are currently distributing a case study showing that replacing with a new reinforcement tower has improved the safety and durability of the equipment around the chimney. 【Recommended for the following concerns】 ◆ Concerns about the safety and durability of aging equipment ◆ Work needed in an environment where surrounding equipment is operational For more details on the case study, please check the catalog download. For inquiries about delivery conditions, site surveys, or details of past plant construction cases, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Prevent troubles caused by "limited delivery routes that make transportation impossible" during equipment updates! We are currently distributing examples of completed renovation work that utilized temporary scaffolding and lifting equipment to ensure safety and precision in conjunction with the update of existing boilers. 【Recommended for these concerns】 ◆ The only access to the installation site is via stairs, with narrow and sloped routes ◆ Consideration is also needed for the integration with existing equipment For more details on the case studies, please check the catalog download. For inquiries about delivery conditions, on-site surveys, or details of past plant construction examples, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Preventing the trouble of "existing piping obstructing delivery" that occurs during equipment updates! We are distributing examples of consistent responses from process piping fabrication to delivery, installation, and flange connection, while confirming interference with existing piping, supports, and equipment in limited construction spaces. 【Recommended for these concerns】 ◆ Securing piping routes and avoiding interference with existing structures in confined spaces with dense existing equipment ◆ Balancing construction feasibility and maintenance access For more details on the case studies, please check the catalog download. For inquiries about delivery conditions, on-site surveys, or details of past plant construction cases, feel free to "contact us via the WEB."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Check the local conditions in advance and develop a construction plan considering the delivery procedures, installation locations, and work flow! We are distributing examples of large dryer equipment delivery and installation work. 【Recommended for the following concerns】 ◆ Want to proceed with construction safely and reliably within limited delivery routes and workspaces ◆ Ensure installation accuracy, including the main unit and related equipment For detailed case information, please refer to the catalog download. For inquiries about delivery conditions, site surveys, or details of past plant construction examples, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Checker covers and frames for equipment openings have been manufactured! We have produced covers using patterned steel plates and steel frames tailored to specifications, finished with plating for enhanced durability and rust resistance, and we are currently distributing examples of these products. 【Recommended for the following concerns】 ◆ We want a structure that has sufficient strength while allowing safe opening and closing. ◆ We want to ensure rust resistance and durability considering the usage environment. For detailed examples, please check the catalog download. For inquiries about delivery conditions, on-site surveys, or details of past plant construction examples, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Manufactured a screw feeder for conveying equipment! We have processed and welded the hopper body, screw shaft, support legs, and discharge outlet, and completed the assembly while confirming the fit of each part. 【Recommended for the following concerns】 ◆ I want a complete set manufactured to match the equipment specifications. ◆ It is necessary to finish with aligned dimensions and fits for each part. For detailed case information, please check the catalog download. For inquiries about delivery conditions, on-site surveys, or details of past plant construction cases, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Prevent troubles caused by "existing piping obstructing delivery" during equipment updates! Based on on-site surveys, we planned the delivery route and lifting procedures, and implemented outdoor crane delivery, position adjustments within the factory, and lifting to the second floor using chain blocks. 【Recommended for the following issues】 ◆ Delivery routes cannot be established due to proximity of existing equipment, piping, and control panels ◆ Lifting to the second-floor installation location is necessary ◆ Consideration of high-altitude work and coordination with the building side is required, necessitating a balance between safety and construction sequence For more details on the case study, please check the catalog download. For inquiries about delivery conditions, on-site surveys, or details of past plant construction cases, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Constructing a multi-story elevator shaft steel frame structure along an existing building! We are distributing examples of confirming site dimensions and the integration with the existing building, as well as the fabrication and delivery of steel components such as columns, beams, and braces. 【Recommended for the following concerns】 ◆ Want to proceed with the delivery and erection of steel in a limited construction space close to the existing building ◆ Need to accurately assemble columns, beams, and openings on each floor for a multi-story elevator shaft ◆ Safety and construction sequence must be balanced, considering high-altitude work and integration with the building side For more details on the case study, please check the catalog download. For inquiries about delivery conditions, site surveys, or details of past plant construction examples, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Prevent troubles caused by "surrounding equipment obstructing delivery" during equipment updates! We are currently distributing examples of safely handling delivery, lifting, hoisting, and installation using large cranes, ensuring reliable construction even in limited workspaces. 【Recommended for these concerns】 ◆ Want to deliver and install new equipment in a factory with limited space ◆ Need to consider delivery routes and lifting methods due to proximity of surrounding equipment For more details on the examples, please check the catalog download. For inquiries about delivery conditions, site surveys, or details of past plant construction examples, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Corrosion and peeling of the coating can be seen on the beams and joints under the stairs and landing! We are distributing a case study where we confirmed the site dimensions, manufactured steel reinforcements to match the existing columns and beams, and installed reinforcements at the deteriorated areas to restore the strength of the stair support. 【Recommended for these concerns】 ◆ Corrosion and peeling of the coating are observed on the beams and joints under the stairs and landing. ◆ There is a need to consider reinforcement methods tailored to the site. For detailed case information, please check the catalog download. For inquiries about delivery conditions, site surveys, or details of past plant construction cases, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Prevent troubles caused by "existing piping obstructing delivery" during equipment updates! We are distributing case studies that provide a consistent response to sites where construction plans are hindered due to crowded rooftops or limited yards. 【Recommended for these concerns】 ◆ Existing piping on the rooftop obstructs the delivery route ◆ Strict conditions for on-site assembly welding and space ◆ Concerns about the installation of fan rooms and internal equipment on-site For detailed case studies, please check the catalog download. For inquiries about delivery conditions, on-site surveys, or details of past plant construction cases, feel free to "contact us via the web."
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case where damage and cracks occurred in the liner plate holding part, a major component of a long-used crusher, and a repair was carried out through welding. The customer faced the challenge of wanting to efficiently repair and regenerate the component due to the high costs associated with part replacement. After inspecting the damaged and cracked areas, we removed surface dirt and the degraded layer, and prepared the substrate. As a result, we were able to extend the machine's lifespan while keeping costs down through the repair and reformation of the component. 【Recommended for the following issues】 ◆ Parts are worn and crushing efficiency has decreased, causing problems ◆ Unable to budget for the replacement of expensive manufacturer original parts ◆ The entire machine is at risk of stopping due to cracks and damage <Reasons for being chosen> - Careful repair process that removes the degraded layer and prepares the substrate - Precise bead grinding after buildup to restore original dimensions - Avoiding new part replacement to reduce repair costs and extend lifespan *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Kuramoto Iron Works Co., Ltd. is based in Noda City, Chiba Prefecture, and is engaged in the manufacturing, installation, and repair of plant equipment and steel structures. We provide comprehensive services from the fabrication of conveyors, screw feeders, hoppers, frames, stairs, walkways, handrails, and special piping, to the transportation and installation of machinery, removal of heavy items, dismantling and updating of existing equipment, and piping work. We also handle the processing of iron and stainless steel, as well as the repair of worn or corroded components. Through on-site surveys, we check the condition of the equipment, the transportation routes, and the integration with surrounding facilities, and propose manufacturing and construction methods suited to the site. Please consult us about equipment updates in limited spaces or improvements to inspection and work flow. If you have any concerns regarding your factory or plant, such as "I want to consolidate the manufacturing and installation" or "I want to repair old equipment," please let us know.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We will respond to various issues faced by companies that have their own factories. If you have concerns such as "I want to remove unused machinery or repair machinery," or "I want to redo the piping due to aging," please leave it to us. It's fine if it's not an immediate need but something for the future. We can handle a wide range of construction, so please feel free to contact us. [For these kinds of issues] ■ I want to remove unused machinery or repair machinery ■ I want to change the layout of the facility ■ I want to renovate or repair the factory ■ The company I was working with has stopped ■ I want to redo the piping due to aging *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We respond to various issues faced by manufacturers and industry peers (on-site construction and manufactured products). If you are experiencing problems such as "the company we were working with has left" or "we can no longer manage with just our existing partner companies," please leave it to us. It doesn't have to be an immediate need; even if it's for the future, we can handle a wide range of construction projects, so please feel free to contact us. [For these kinds of issues] ■ Shortage of engineers and workers ■ On-site delivery deadlines for manufactured products cannot be met ■ The company we were working with has left ■ We can no longer manage with just our existing partner companies *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case where we updated the work passageway (walkway) in our aging factory to a specification that enhances safety and durability. The existing walkway had progressed in corrosion and damage, posing challenges to safety during inspections and work. By accurately identifying the deteriorated areas through a site survey, we manufactured a specially designed new walkway that does not interfere with the existing structure. As a result, the safety and convenience of inspection and maintenance work were significantly improved. [Challenges] - The walkway, which had been used for many years, showed signs of corrosion, rust, and deformation or damage to the planks, resulting in areas that were unsafe to traverse. - Due to its installation at a high location, repair or replacement work posed dangers. - It was necessary to secure a safe working platform. *For more details, please download the PDF or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case where damage and cracks occurred in the liner plate holding part, a major component of a crusher that has been used for many years, and a repair was conducted through welding. The customer faced the challenge of wanting to repair and regenerate efficiently due to the high costs associated with part replacement. After inspecting the damaged and cracked areas, we removed surface dirt and the degraded layer, and prepared the substrate. As a result, we were able to extend the machine's lifespan while keeping costs down through the repair and reformation of the parts. 【Case Overview】 ■Challenges - Some parts of the crusher were worn and damaged due to long-term use. - Part replacement incurs high costs. ■Effects - Regeneration of worn and damaged parts without replacing them with new ones. - Extended machine lifespan while keeping costs down through the repair and reformation of parts. *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case where we installed a walkway and a fixed ladder to ensure safe access to equipment at our company. After conducting a site survey to confirm the structure, dimensions, and interference points of the existing equipment, we established inspection openings in appropriate locations. The newly installed walkway and ladder have significantly improved the safety of inspection and maintenance work, allowing workers to enter and exit the equipment interior with peace of mind. [Challenges] - The need to set up temporary scaffolding or simple ladders for each inspection - Time-consuming work preparations - High risk of labor accidents such as falls - Limited ability to check the interior of the equipment, making early detection of issues difficult *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case of stair repair conducted by our company. Rust and corrosion had occurred on the treads and stringers of the steel staircase, and it was found that in areas where corrosion had progressed, the structural strength had locally decreased. By removing the corroded parts and performing repair welding, we achieved a finish that restored strength and improved durability, ensuring long-term safety. [Challenges] ■ As a result of on-site inspection, rust and corrosion were found on the treads and stringers of the steel staircase. ■ It was confirmed that in areas where corrosion had progressed, the structural strength had locally decreased. ■ Concerns about safety due to aging were identified as an issue. *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case where we installed a new fan room (for supply and exhaust fans) in our company to improve the efficiency of the air conditioning and exhaust systems within the factory. The existing equipment faced challenges such as insufficient airflow and difficulty in maintenance, but we optimized the structure, materials, and layout to suit the on-site environment. Additionally, to avoid impacting the operation of the existing line, the delivery and installation were carried out on holidays, resulting in a significant improvement in airflow and ventilation efficiency due to the new fan room. 【Case Overview】 ■Challenges - The indoor space was too small for the fan capacity, leading to reduced airflow and supply/exhaust efficiency. - Adjustments were needed to connect the new equipment with the existing piping and ducts. ■Effects - The new fan room significantly improved airflow and ventilation efficiency. *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case where we removed aging capacitors and unnecessary manufacturing equipment, piping, and frameworks at our company. The layout of the equipment was complex, and the removal route was narrow, making it difficult to use heavy machinery. Therefore, manual dismantling was necessary to ensure that the work could be done safely and efficiently. Through a site survey, we accurately understood the structure, equipment layout, and removal route, allowing us to complete the dismantling safely while maintaining factory operations. 【Case Overview】 ■Challenges - The layout of the equipment was complex, and the removal route was narrow, making it difficult to use heavy machinery. - Manual dismantling was necessary to ensure safe and efficient work. ■Results - Completed dismantling safely while maintaining factory operations. - Secured new space by removing unnecessary equipment. - Received high praise from customers for being able to remove equipment without stopping production. *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case where large cooker equipment newly installed in a factory was brought in and set up from the roof. The challenge was that the new cooker was large and heavy, making it difficult to bring in through existing entrances and corridors. It required meticulous schedule management to complete the work in a short period while continuing factory operations. Through a site survey, we thoroughly checked the delivery route and roof structure, allowing us to achieve efficient and safe delivery without passing through narrow corridors. [Challenges] - The new cooker is large and heavy, making it difficult to bring in through existing entrances and corridors. - There are operational production lines and existing piping indoors, necessitating a precise delivery plan to avoid damaging the equipment. - Meticulous schedule management was required to complete the work in a short period while continuing factory operations. *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case of tower replacement work carried out by our company. As part of maintenance and renewal operations, we remove the existing tower and construct a new one to maintain and improve safety and reliability. The construction process consists of investigation and design, manufacturing the new tower, dismantling the existing tower, and installing the new tower. 【Construction Process】 1. Investigation and Design 2. Manufacturing the New Tower 3. Dismantling the Existing Tower 4. Installing the New Tower *For more details, please feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case where we manufactured a screw feeder. This device is used for the quantitative transport and supply of powders, granules, and solids, and is utilized in various industries such as food, chemicals, resins, recycling, and steelmaking. The basic items for manufacturing include the identification of the application and target materials (transported materials, characteristics, capacity, etc.) and the main specifications of the structure (type of screw, material, drive method, etc.). 【Basic Items for Manufacturing】 ■ Identification of application and target materials (transported materials, characteristics, capacity, etc.) ■ Main specifications of the structure (type of screw, material, drive method, etc.) *For more details, please feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case where we performed installation work for industrial dryers (such as hot air dryers) at our company. The process of installation work (heavy equipment work) involves conducting a preliminary survey and site confirmation (checking the structure of the installation location and the routes for transportation in and out), followed by the execution of heavy equipment transportation work. We also carry out installation and leveling adjustments (aligning the installation position, leveling, and securing anchor bolts) as well as trial operation adjustments. 【Flow of Installation Work】 1. Preliminary survey and site confirmation 2. Heavy equipment transportation work 3. Installation and leveling adjustments 4. Trial operation adjustments *For more details, please feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case of welding repair for a crusher that we conducted at our company. Repairs for liner plate installation PL, as well as welding for other parts such as blades (cutters), roll sections, liner plates, and hammers, are also possible. Please feel free to contact us when you need our services. 【Welding Process Example】 1. Cleaning and surface polishing of the worn area 2. Preheating if necessary 3. Multi-layer buildup: the first layer is soft steel to prevent cracking, and subsequent layers are wear-resistant materials 4. Post-processing: cooling management, finishing grinding, and tempering if necessary *For more details, please feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce our company's "can manufacturing and steel frame processing." We design all specifications, allowable loads, load calculations, and sizes tailored to the product, create detailed drawings, and carry out production processing at our own factory or with BP processing contractors to provide top-class products. You can also trust us with SUS and aluminum processing, as well as welding. The same applies to steel frame manufacturing. 【Features】 ■ Design all specifications, allowable loads, load calculations, and sizes tailored to the product ■ Create detailed drawings and carry out production processing at our own factory or with BP processing contractors to provide top-class products *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce our "Steel Frame Seismic Reinforcement Work." Seismic reinforcement refers to methods that improve the strength, rigidity, and ductility of the walls and columns of a building, thereby enhancing its seismic performance. There are various methods for seismic reinforcement, and it is necessary to plan them in a balanced manner based on the results of seismic diagnostics. Additionally, since this type of work can be costly, we collaborate with our clients to comprehensively assess the construction period, adjustments, and execution, selecting the most suitable, prompt, and high-quality methods. [Features] ■ Collaborate with clients to comprehensively assess construction period, adjustments, and execution ■ Select the most suitable, prompt, and high-quality methods *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce our "Steel Frame Construction" services. As indicated by our company name, we primarily focused on steel frame construction when we were founded. Steel frames play a crucial role as the skeleton of a building. Although the work is performed at heights and in confined spaces, we implement safety measures such as safety ropes and horizontal nets to ensure that we can respond to any potential dangers. 【Features】 ■ Our main focus at the time of establishment was steel frame construction. ■ We implement safety measures such as safety ropes and horizontal nets to ensure we can respond to any potential dangers. *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
"Metalworking" is one of the areas that Kuramochi has focused on the most. Among these, the three major elements of metalworking that we have worked hard to improve are: beautiful and strong welding, precise cutting, and a sense of style that everyone can agree on. We put a lot of effort into educating on these three aspects, and no matter which site we go to, we will carry out the work with a high level of "skill." Please leave the SUS processing, installation, and welding on-site to us. 【Three Major Elements of Metalworking】 ■ Beautiful and strong welding ■ Precise cutting ■ A sense of style that everyone can agree on *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce the "demolition work" conducted by Kuramochi Iron Works Co., Ltd. We respond to various needs such as the aging of plant equipment, equipment replacement, securing pathways for machine installation, and layout adjustments. Since this type of work can potentially lead to serious accidents if procedures are not followed correctly or if someone unknowingly approaches the area, we ensure safe and secure execution through information sharing and awareness of hazards throughout the entire company, our customers, and the worksite. [Services Offered] ■ Aging of plant equipment and equipment replacement ■ Securing pathways for machine installation ■ Layout adjustments *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
"Heavy Equipment Transportation and Installation Work" involves the transportation and installation of various heavy objects using a range of methods, from heavy machinery like cranes to manual tools such as rollers and chain blocks. In some locations, there may be low ceilings, no place to pull items in, or items that are larger than the openings, and some objects may exceed 100 tons. Kuratetsu employs various methods, shares information, and consistently implements construction using cutting-edge technology. Additionally, the ability to perform critical tasks such as marking out and height adjustment for delicate machinery at the installation site is a significant strength of Kuratetsu. 【Features】 ■ Incorporates various methods and shares information ■ Always uses cutting-edge technology for construction ■ Capable of marking out and height adjustment for delicate machinery at the installation site *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce the "temporary scaffolding construction" conducted by Kuramochi Ironworks Co., Ltd. In plant construction, temporary scaffolding is necessary in areas where there is no scaffolding at high altitudes or where high-altitude work vehicles cannot enter. This construction is directly related to safety, security, and quality. It is not uncommon to perform scaffolding work in narrow and dark areas within the plant, but we will provide sturdy scaffolding suitable for the site. 【Examples】 ■ Scaffolding for walkway replacement (202404/26) ■ Temporary scaffolding assembly work (202107/08) ■ Temporary scaffolding assembly work (202107/07) *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce the "piping construction" carried out by Kuramochi Iron Works Co., Ltd. Our company is a professional in the processing and installation of various types of piping, from iron pipes, SUS pipes, PVC pipes, to general and special piping. We measure on-site, rewrite the drawings for production, and carry out the installation as a consistent process. We handle materials suitable for the flowing gases, liquids, and solids, prioritizing safety and quality in our offerings. 【Services Offered】 ■ Iron pipes ■ SUS pipes ■ PVC pipes ■ General piping ■ Special piping *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
"Plant construction" is the area in which our company excels the most, and we take pride in being plant riggers. We install a wide variety of products, including large machinery for factory and production equipment, conveyors, tanks and pumps, piping, and electrical machinery. We also incorporate the opinions of those working in the factory to install safety equipment and maintenance for lifts. Together with our customers and all employees, we conduct thorough discussions with our business partners to provide top-class equipment safely and swiftly, with safety as our top priority. [What is a Plant Rigger?] ■ Ability to avoid the line of fire ■ Or the ability to take action for improvement ■ Possesses high skills and demonstrates them ■ High standards in high-altitude work, blacksmithing, welding, and cutting work ■ Rich in knowledge and able to provide suggestions and opinions *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration