This is a case study of floor sinking correction work and void filling work conducted at a warehouse and factory located in Sapporo City, Hokkaido. Due to floor sinking, the racks used for storing goods had become tilted. As a temporary measure, spacers were used under the racks to adjust their height and level them. The sinking correction work was carried out in a limited space, and within a few hours, the floor was made flat. Additionally, sinking correction work was performed in the office without interrupting the customer's operations. [Case Study] ■ Total construction area: Approximately 334 m² ■ Maximum sinking amount: 105 mm ■ Construction period: 3 days *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationDue to the impact of the Great East Japan Earthquake, the floor inside the store has significantly sunk. As a result of the floor sinking, gaps were observed between the floor and walls, as well as between the walls and ceiling. Therefore, our company carried out repair work. The "Upcon Method," which can be implemented at night during the business suspension, was adopted for the repairs. Additionally, voids were observed under the floor, so filling work was also conducted. 【Construction Overview】 ■ Construction Area: Approximately 2,300m2 ■ Maximum Settlement: 144mm ■ Construction completed in 2012, with repairs made over 11 consecutive nights. *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationA shopping center where widespread floor subsidence was observed due to ground subsidence. Due to the floor subsidence, gaps appeared between the floor and walls, causing various issues within the stores. As a result, our company implemented repairs. The "Upcon Method," which can be executed at night during the business closure, was adopted for the repairs. Additionally, since voids were also observed under the floor, filling work was carried out. 【Construction Overview】 ■ Construction Area: Approximately 540m² ■ Maximum Subsidence: 71mm ■ Maximum Void: 190mm ■ Construction completed in 2011, with repairs conducted over 7 consecutive nights. *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationA large shopping center experienced significant floor subsidence due to weak ground. Gaps were observed in various places, such as between the floor and walls and between the walls and ceiling, caused by the subsidence. As a result, our company implemented repairs. The "Upcon Method," which can be executed during nighttime while the business is closed, was adopted for the repairs. To expedite the construction period, two construction plant vehicles were utilized, and the repairs were completed over 25 nights. 【Construction Overview】 ■ Construction Area: Approximately 3,240m2 (Backyard 405m2, Inside Store 2,835m2) ■ Maximum Subsidence: 94mm ■ Repairs completed over 25 nights ■ Two construction plant vehicles used to expedite the construction period For more details, please feel free to contact us via PDF download or inquiry form.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration