Otsuka Group begins operation of demand-site co-located storage batteries - Utilizing surplus on-site PV to achieve self-consumption of renewable energy and maximize environmental value.
エナリス
Eneres Inc. (Headquarters: Chiyoda-ku, Tokyo, President and CEO: Goro Suzuki, hereinafter referred to as "Eneres") has collaborated with Otsuka Holdings Co., Ltd. (Headquarters: Chiyoda-ku, Tokyo, President and CEO: Makoto Inoue) and Tes Engineering Co., Ltd. (Headquarters: Yodogawa-ku, Osaka, President: Toshihiro Takasaki) to begin supporting the operation of a co-located battery storage system at a factory site in Hokkaido, part of the Otsuka Group, starting in July of this year. Eneres will manage the operation of the battery storage system and support the Otsuka Group's achievement of carbon neutrality by maximizing the use of electricity generated by on-site solar power facilities.
For more details, please see here:
https://www.eneres.co.jp/news/20260715.html?utm_source=ipros&utm_medium=referral&utm_campaign=free_plan

Inquiry about this news
Contact Us Online



