Season 5 [Expansion] Chapter 5: The Dramatic Evolution of the Procurement Process Brought About by the Complete Synchronization of Bill of Materials (BOM) and 3D Shapes
T3Japan
By completely synchronizing design data (3D CAD models) and the bill of materials (BOM) that serves as the foundation for procurement and production management in real-time, we explained the mechanism and significance that brings dramatic evolution to the procurement and purchasing processes in manufacturing.
The "3D models" in the design department and the "BOM" in the procurement department were disconnected, leading to frequent human errors such as manual reorganization of the BOM, missed changes, and incorrect orders of the latest specifications. In response, by integrating various attributes (material, supplier, cost, etc.) into each part of the 3D model to achieve "complete synchronization" with the BOM, the 3D model transforms into a "living database" that drives the entire operation.
This synchronization enables three transformations: 1. Reduction of lead time through one-click request for quotation (RFQ) orders, 2. Elimination of ordering mistakes through centralized management of master data, and 3. Strengthening collaboration with suppliers. While there are challenges such as reducing the input burden on designers and breaking down organizational silos during implementation, connecting the upstream to the downstream with a single "digital thread" is presented as a competitive advantage for next-generation manufacturing.

Inquiry about this news
Contact Us OnlineMore Details & Registration
Details & Registration
Related Links
Nice to meet you, I'm Takachan, working in sales (which is more like a pre-sales role) at ThinkDesign. Usually, I listen to clients' desires for "the kind of service they want to create" and bridge the gap to turn those into a "concrete blueprint" that engineers and designers can follow without hesitation.




