Solar power generation system [Construction record Case 432]
Kyocera 7.41kw KJ195P-3CRCE/A
Responsibility for design and construction of solar power systems at Attic, without subcontracting.
Atik is a responsible design and construction contractor that handles total planning in-house, from the design of solar power generation (including all-electric systems) to construction and aftercare, based on a wealth of experience gained from many years of roofing work for major housing manufacturers. Since we do not subcontract, we can respond quickly to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Kyocera Solar Power Generation System Design and Construction
Price information
-
Delivery Time
P2
Applications/Examples of results
■S Residence, Utsunomiya City, Tochigi Prefecture ■Construction Date: July 2012 ■Construction Period (Installation & Electrical): 3 days ■Selected Model Specifications: Kyocera ■Mounting Method: Direct Bracket A Type ■Module: 7.41 kW KJ195P-3CRCE/A
catalog(1)
Download All CatalogsCompany information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar Power Generation System [Construction Results Case 8]](https://image.mono.ipros.com/public/product/image/13e/1377866002/IPROS_12547796147454341000.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 83]](https://image.mono.ipros.com/public/product/image/73f/2000047261/IPROS4147175348412929169.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 110]](https://image.mono.ipros.com/public/product/image/2d2/2000124584/IPROS7456677273986177533.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 314]](https://image.mono.ipros.com/public/product/image/2a7/2000184685/IPROS4666161161121051504.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 417]](https://image.mono.ipros.com/public/product/image/fd1/2000205102/IPROS4414873534909218986.jpg?w=280&h=280)
![[Column] Advantages and Disadvantages of Solar Power PPA Business](https://image.mono.ipros.com/public/product/image/e34/2000667961/IPROS04478790006577702378.png?w=280&h=280)

![[For Commercial Facilities] Muroran City: Achieving both electricity cost savings and power outage measures with self-consumed solar power!](https://image.mono.ipros.com/public/product/image/2117111/IPROS16405979355836475567.jpg?w=280&h=280)
![[Case Study] Nagano International Country Club](https://image.mono.ipros.com/public/product/image/960/2001173939/IPROS14214440717103906425.png?w=280&h=280)


![[Leveling Correction] Leveling correction of concrete floors "Teratec Method"](https://image.mono.ipros.com/public/product/image/d08/1267539002/IPROS70063422645318547243.jpeg?w=280&h=280)

