Responsibility for design and construction of solar power systems at Attic without subcontracting.
Atik is a responsible design and construction contractor that handles total planning in-house, from the design of solar power generation (including all-electric systems) to construction and aftercare, based on its extensive track record of roofing work for major housing manufacturers over many years. Since we do not subcontract, we can quickly respond to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Sharp - Design and construction of solar power generation systems
Price information
-
Delivery Time
P2
Applications/Examples of results
■K's residence, Koga City, Ibaraki Prefecture ■Construction date: October 2015 ■Construction period (foundation, installation, electrical): 2 days ■Selected model specifications: Sharp ■Mounting method: YR method ■Module: 4.92kw NU-205AD
catalog(1)
Download All CatalogsCompany information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar Power Generation System [Construction Record Case 47]](https://image.mono.ipros.com/public/product/image/5d1/2000009092/IPROS2375377979639981012.jpg?w=280&h=280)
![Solar Power Generation System [Construction Achievements Case 24]](https://image.mono.ipros.com/public/product/image/149/2000081749/IPROS1753982083152070480.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 36]](https://image.mono.ipros.com/public/product/image/b18/2000104333/IPROS7289552683857786854.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 258]](https://image.mono.ipros.com/public/product/image/350/2000162310/IPROS2311577559396654666.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 262]](https://image.mono.ipros.com/public/product/image/974/2000165152/IPROS675862832360513338.jpg?w=280&h=280)

![[For commercial facilities] Kushiro City reduces electricity costs by up to 29% with self-consumption solar power!](https://image.mono.ipros.com/public/product/image/2117111/IPROS17172476485255629150.jpg?w=280&h=280)
![[Information] How to Choose Solar Power? <For Corporations>](https://image.mono.ipros.com/public/default/object/noimage_l.gif?w=280&h=280)




