Responsibility for design and construction of industrial solar power generation systems at Attic, without subcontracting.
Atik is a responsible design and construction contractor that handles total planning in-house, from the design of solar power generation (including all-electric systems) to construction and aftercare, based on its extensive track record in roofing work for major housing manufacturers over many years. Since we do not subcontract, we can quickly respond to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Sharp - Design and construction of solar power generation systems
Price information
-
Delivery Time
Applications/Examples of results
■I-san, Oura Town, Gunma Prefecture ■Construction Date: July 2016 ■Selected Model Specifications: Sharp ■Module: 270.0 kW ■Site Area: 937 tsubo
catalog(1)
Download All CatalogsCompany information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Industrial Solar Power Generation System [Construction Record Case 45]](https://image.mono.ipros.com/public/product/image/053/2000182358/IPROS7328495797206974900.jpg?w=280&h=280)
![Industrial Solar Power Generation System [Construction Record Case 46]](https://image.mono.ipros.com/public/product/image/2f2/2000182359/IPROS8759751559092592000.jpg?w=280&h=280)
![Industrial Solar Power Generation System [Construction Record Case 96]](https://image.mono.ipros.com/public/product/image/da0/2000239242/IPROS4930296429415415213.jpg?w=280&h=280)
![Industrial Solar Power Generation System [Construction Record Case 126]](https://image.mono.ipros.com/public/product/image/3a8/2000298485/IPROS1576537880003083022.jpg?w=280&h=280)
![Industrial Solar Power Generation System [Construction Record Case 163]](https://image.mono.ipros.com/public/product/image/1c6/2000360201/IPROS8802024189820049738.jpg?w=280&h=280)


![[For Data Centers] Otaru City Achieves Up to 29% Reduction in Electricity Costs with Solar Power!](https://image.mono.ipros.com/public/product/image/2117111/IPROS16495614374399606239.jpg?w=280&h=280)

![[For Factories] Obihiro City Self-Consumption Solar Power Generation Cost and Renewable Energy Reduction!](https://image.mono.ipros.com/public/product/image/2117111/IPROS8107665412631161417.jpg?w=280&h=280)


![Amenities Meter: Creating a Comfortable Working Space with IoT [Work Style Reform]](https://image.mono.ipros.com/public/product/image/6fb/2001027009/IPROS12754886358639934309.png?w=280&h=280)