[Project Introduction] Seismic Diagnosis and Reinforcement Work for High-Pressure Gas Tanks
Through our examination, it was determined that pile work was unnecessary, resulting in approximately a 20% reduction in construction costs and a two-month shortening of the construction period!
Our company has conducted seismic diagnosis and reinforcement work on your existing high-pressure gas spherical tank in accordance with the Ministry of Economy, Trade and Industry's notification. There was a request from the customer to minimize the operational downtime of the tank and shorten the construction period as much as possible. Through our examination, we determined that pile work was unnecessary, resulting in approximately a 20% reduction in construction costs and a two-month shortening of the construction period. 【Summary of Achievements】 ■ Request - Minimize the operational downtime of the tank and shorten the construction period as much as possible. ■ Result - Through our examination, we determined that pile work was unnecessary, resulting in approximately a 20% reduction in construction costs and a two-month shortening of the construction period. *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Idemitsu Engineering's Solutions and Contributions to Customers】 ■ Evaluation of seismic motion based on advanced knowledge - Calculation of seismic motion assuming the Nankai Trough earthquake: Reduced excitation force in certain frequency bands compared to standard earthquakes - Support for negotiations between customers and local authorities regarding seismic evaluation methods ■ Design innovations aimed at reducing construction volume - Changes in the natural period of the tank due to reinforcement effects on the tank body - Implementation of a design that minimizes excitation force by offsetting the earthquake and tank periods: Resulting in no need for pile construction *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Recommended for customers like this】 ■Those who want to promote seismic retrofitting of important equipment while keeping costs and construction time down for BCP compliance. *For more details, please download the PDF or feel free to contact us.
Company information
By leveraging my experience as a user, I will contribute to the utilization of low-cost, high-efficiency, and clean equipment by responding to various customer needs regarding equipment. Additionally, I will fulfill our corporate social responsibility and strive to maintain and improve the natural environment.