Before giving up on the high estimate. Everything you should do just before and just after the contract.
Estimates for production management systems often range from 8 million to 15 million yen, and many companies feel the need for business improvement but find it difficult to take the first step. However, with careful selection methods and approaches, it is entirely possible to reduce implementation costs by 30%. 【One Point Advice】In System Implementation Part 4, we will comprehensively explain the breakdown of implementation costs focusing on customization fees, points for cost reduction, how to conduct a "trace demo" using actual company data as if it were the real thing, methods to check processing speed that are not visible in demos, how to prevent critical digit limit issues such as "part numbers not fitting," and step-by-step implementation methods tailored to different business types, covering everything from just before the contract to after the contract. Please download it from the catalog page of Improove Inc. and take a look.
Inquire About This Product
basic information
[One Point Advice] System Implementation Edition 4 This document is particularly useful for companies that are hesitant about implementation due to the size of the estimated costs, those narrowing down their final candidates by comparing multiple companies, and those that have experienced implementation failures in the past due to "it was different from what I expected." It provides content that enables practical personnel to take concrete actions from the final confirmation just before the contract to the start of operations after implementation. Specifically, it covers the following five themes: - Breakdown of implementation costs and how to identify items that can be reduced and those that should not be cut. - How to conduct a "trace demo" using actual company data as if it were the real thing. - The essence of comparing processing speeds and the five items that should be checked. - A checklist for digit count verification before implementation to prevent troubles like "the item number does not fit." - A step-by-step approach to phased implementation starting from the "most effective parts at a minimum" based on business type. We will provide key points to keep in mind from just before the contract to after the contract.
Price range
Delivery Time
Applications/Examples of results
There is a track record of supporting the introduction of 480 companies over 20 years for made-to-order production factories.
catalog(1)
Download All CatalogsCompany information
■Consulting services related to computer usage ■Sales and maintenance management of computer software ■Gifu Headquarters 〒500-8178 2nd Floor, Ishigure Building, 3-2 Kiyozumicho, Gifu City TEL: 058-263-5732 ■Tokyo Sales Office 〒142-0053 2nd Floor, Makita Building, 5-4-13 Nakanobu, Shinagawa-ku, Tokyo TEL: 03-6873-7235 ■Business Hours 9:00 AM - 6:00 PM (Closed on Saturdays, Sundays, holidays, and company-designated holidays)



