How about reviewing the frequent equipment stoppages from the floor?
Level the device to reduce unseen damage.
■ Are you only addressing the frequent chocolate stops on-site? If errors do not decrease despite multiple adjustments to the equipment, production efficiency will decline, potentially leading to damages amounting to tens of millions of yen. ■ This issue... might be improved from the floor up. In our construction process, we inject rigid urethane "TerraTech resin" under the concrete floor, and its expansion force levels the floor. By eliminating floor distortion, we can reduce malfunctions and maintain stable production. ■ With our main method, the "TerraTech method," there is no need to move equipment or cargo! We solve issues with an overwhelmingly short construction period. Using a laser level and receiver, we adjust the floor height to the millimeter. Additionally, since it does not require large-scale construction, there is minimal dust generated, making it widely adopted in places with strict hygiene management, such as clean rooms. Would you like to create an environment that allows for stable operations? Please feel free to contact us first. Toll-free number: 0120-873-835
Inquire About This Product
Related Videos
basic information
■Various Experts in Different Fields Our company has a range of experts, including first-class architects with extensive experience, specializing in architecture, civil engineering, ground conditions, liquefaction, and structural vibrations. We propose construction methods tailored to your needs from a wide variety of products. If it is difficult to resolve an issue with a single method due to the condition of the building or your concerns, we suggest a combination of methods for the construction. ■Appropriate Investigation Costs Before carrying out construction, we conduct an on-site investigation and propose methods that address the concerns you wish to resolve. Investigation costs: Basic fee of 50,000 yen (excluding tax) + actual transportation costs. *Additional costs may apply depending on the location and conditions of the site. [Void Volume Investigation] We drill several holes with a diameter of 16 mm in the floor slab and use an endoscope to measure the thickness of the slab and the volume of voids beneath it. In addition to understanding the current situation, we perform measurements necessary for construction planning, such as calculating the amount of resin to be used. [Settlement (Level) Investigation] Using surveying equipment, we measure the height of the floor slab and quantify the amount of settlement and deflection. The measured values are used to set target values for corrections and to create construction plans. Please feel free to contact us. Toll-free number: 0120-873-835
Price information
Please feel free to contact us. Toll-free number: 0120-873-835
Delivery Time
※For more details, please contact us.
Applications/Examples of results
【Related Case Studies】 Automotive and Aerospace Component Manufacturing: Before construction, it was confirmed that the concrete floor in the factory had cracks and an uneven appearance. Additionally, there were micro-vibrations, and in hindsight, it seems that the floor may have begun to sink. This posed a significant operational issue... Read more here: https://mainmark.co.jp/works/interview016 Precision Equipment Manufacturing Factory: The precision positioning table units manufactured by our company require adjustments at the nanometer level. Changes in room temperature can lead to metal expansion, greatly affecting product accuracy, so we manage the temperature environment with an error of less than ±0.5℃... Read more here: https://mainmark.co.jp/works/interview019 Precision Parts Manufacturing Factory: The first sense of discomfort was felt when we introduced two new machines in 2020. Although we had also introduced three machines in 2019, after the introduction in 2020, everyone working in that workspace began to feel "shaking" in the floor when operating the machines... Read more here: https://mainmark.co.jp/works/interview023
catalog(3)
Download All CatalogsCompany information
The main business activities of Mainmark involve "returning tilted floors and buildings to a level state" and "preventing existing floors and buildings from tilting." We primarily offer the "TerraTech Method," which allows us to level tilted floors without stopping operations, and we provide various construction proposals tailored to our customers' concerns, from investigation to execution. ■ Nationwide responsible construction with over 5,000 completed projects Mainmark has established offices in eight locations across the country and conducts responsible construction nationwide. We serve a wide range of clients, including factories, stores, warehouses, offices, and apartments. ■ Non-disruptive floor tilt and subsidence correction method "TerraTech Method" Our main service, the "TerraTech Method," is a patented technique that injects TerraTech resin (rigid polyurethane foam resin) into concrete floors that have developed tilts, subsidence, steps, or voids due to ground subsidence or earthquakes. The expansion force of the resin levels the sunken floor and fills the voids beneath it. This technology is also registered with the Ministry of Land, Infrastructure, Transport and Tourism's "NETIS," ensuring its reliability. Patent No. 4896949 "Method for Correcting Sunken Floors" NETIS Registration No. "QS-080007"



