Conducted resin injection work while managing levels! A case completed in 4 days.
Introducing examples of product planning, development, and prototyping for in-vehicle voice recognition devices.
A platform provided by an event production company that allows for sharing during periods when event materials and promotional fixtures are not in use, enabling cost reduction and addressing environmental issues.
We will introduce a case of a bag manufacturing factory that sank due to ground subsidence and the impact of an earthquake!
We would like to introduce several examples of factories in the industrial zone of Miyagi Prefecture that have been modified using our construction method!
Corrected a maximum settlement of 46mm! A case where the distortion of the door frame caused by settlement was resolved.
A maximum settlement of 500mm occurred! An example of correction using a combination of the up-con method and single pipe pile driving method.
Maximum sinking of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.
A case study of correcting liquefied ground due to the earthquake! A maximum settlement of about 60mm was corrected in a day and a half.
A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.
Possible to carry out without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.
The ground floor slab sank due to the earthquake! A case study of improving the gaps between the floor and walls, and between the walls and ceiling.
A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.















































































































