List of Design and production support products
- classification:Design and production support
451~495 item / All 11902 items
Reduce the workload from handling heavy objects! Here are five case studies that solved customer challenges! We are also accepting free consultations and tests tailored to your work!
- Other conveying machines
Presentation of explanatory materials on JIS and ISO standards. We propose suitable safety barriers from a rich product series! Free rental of demo kits.
- Other safety and hygiene products
Utilize the symbol editor! Creating outline symbols.
- 2D CAD Electrical
Utilize the symbol editor!! Creating circuit symbols
- 2D CAD Electrical
Convert AutoCAD files too! Utilize drawings and symbols.
- 2D CAD Electrical
Make selections more efficiently! Utilizing the symbol sheet.
- 2D CAD Electrical
Utilize the pattern editor! Make drawing more efficient.
- 2D CAD Electrical
The behind-the-scenes of automatic linkage! Component DMT, Connection DMT, BOM
- 2D CAD Electrical
Real-time linkage! What is part DMT?
- 2D CAD Electrical
Centralized management of numerous drawings! A drawing management system that significantly reduces management workload.
- Other CAD
- Document and Data Management
ECAD DCX Implementation Case Study <Meiden Corporation> Achieved approximately 50% reduction in design man-hours by resolving drawing inconsistencies and automating parts list creation.
Since its establishment in 1975, Meiden Co., Ltd. has developed by leveraging its strength in a system that can consistently handle everything from precision sheet metal processing to painting and assembly. We would like to introduce the points and effects of solving the challenges of inspection drawing and parts list creation time through the introduction of 'ECAD DCX'. ■ Effects after introduction - The parts list creation that used to take a full day is now completed with the push of a button, reducing the man-hours for design work by 50%. - Optimization of delivery time and costs through the use of ECAD-Cabinet collaboration. - Standardization of design ensures the same quality regardless of who is designing. - Significant improvement in design accuracy, creating an environment where we can focus on what we should be doing. ■ Product features - Real-time information updates and error detection significantly reduce inspection drawing man-hours. - Automatic creation of reports such as parts lists, terminal block tables, and wiring tables from drawing data improves productivity. - During drawing creation, necessary parts can be searched and assigned from the cloud-based parts library database 'ECAD Library' (support contract required), and selected parts can be registered in the master for shared use. - Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving automation. *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Eliminate double entry of CAD and cabinet data by utilizing CAD drawing data! With ECAD for panel design, Nitto Kohki cabinet processing becomes easy and has a short delivery time.
- 2D CAD Electrical
- Other CAD related software
ECAD DCX Implementation Case Study <Meiden Corporation> Achieved approximately 50% reduction in design man-hours by resolving drawing inconsistencies and automating parts list creation.
Since its establishment in 1975, Meiden Co., Ltd. has developed by leveraging its strength in a system that can consistently handle everything from precision sheet metal processing to painting and assembly. We would like to introduce the points and effects of solving the challenges of inspection drawing and parts list creation time through the introduction of 'ECAD DCX'. ■ Effects after introduction - The parts list creation that used to take a full day is now completed with the push of a button, reducing the man-hours for design work by 50%. - Optimization of delivery time and costs through the use of ECAD-Cabinet collaboration. - Standardization of design ensures the same quality regardless of who is designing. - Significant improvement in design accuracy, creating an environment where we can focus on what we should be doing. ■ Product features - Real-time information updates and error detection significantly reduce inspection drawing man-hours. - Automatic creation of reports such as parts lists, terminal block tables, and wiring tables from drawing data improves productivity. - During drawing creation, necessary parts can be searched and assigned from the cloud-based parts library database 'ECAD Library' (support contract required), and selected parts can be registered in the master for shared use. - Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving automation. *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Rich parts library and comprehensive support system.
- 2D CAD Electrical
- Other CAD related software
ECAD DCX Implementation Case Study <Meiden Corporation> Achieved approximately 50% reduction in design man-hours by resolving drawing inconsistencies and automating parts list creation.
Since its establishment in 1975, Meiden Co., Ltd. has developed by leveraging its strength in a system that can consistently handle everything from precision sheet metal processing to painting and assembly. We would like to introduce the points and effects of solving the challenges of inspection drawing and parts list creation time through the introduction of 'ECAD DCX'. ■ Effects after introduction - The parts list creation that used to take a full day is now completed with the push of a button, reducing the man-hours for design work by 50%. - Optimization of delivery time and costs through the use of ECAD-Cabinet collaboration. - Standardization of design ensures the same quality regardless of who is designing. - Significant improvement in design accuracy, creating an environment where we can focus on what we should be doing. ■ Product features - Real-time information updates and error detection significantly reduce inspection drawing man-hours. - Automatic creation of reports such as parts lists, terminal block tables, and wiring tables from drawing data improves productivity. - During drawing creation, necessary parts can be searched and assigned from the cloud-based parts library database 'ECAD Library' (support contract required), and selected parts can be registered in the master for shared use. - Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving automation. *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Even if we understand the necessity of work style reform, what exactly should we do? Here are hints for work style reform in control panel manufacturing that we should tackle in the future, as seen in...
- Other FA equipment
- Other CAD related software
ECAD DCX Implementation Case Study <Meiden Corporation> Achieved approximately 50% reduction in design man-hours by resolving drawing inconsistencies and automating parts list creation.
Since its establishment in 1975, Meiden Co., Ltd. has developed by leveraging its strength in a system that can consistently handle everything from precision sheet metal processing to painting and assembly. We would like to introduce the points and effects of solving the challenges of inspection drawing and parts list creation time through the introduction of 'ECAD DCX'. ■ Effects after introduction - The parts list creation that used to take a full day is now completed with the push of a button, reducing the man-hours for design work by 50%. - Optimization of delivery time and costs through the use of ECAD-Cabinet collaboration. - Standardization of design ensures the same quality regardless of who is designing. - Significant improvement in design accuracy, creating an environment where we can focus on what we should be doing. ■ Product features - Real-time information updates and error detection significantly reduce inspection drawing man-hours. - Automatic creation of reports such as parts lists, terminal block tables, and wiring tables from drawing data improves productivity. - During drawing creation, necessary parts can be searched and assigned from the cloud-based parts library database 'ECAD Library' (support contract required), and selected parts can be registered in the master for shared use. - Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving automation. *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Even if we understand the necessity of work style reform, what exactly should we do? Here are hints for work style reform in control panel manufacturing that we should tackle in the future, as seen in...
- 2D CAD Electrical
- Other CAD related software
ECAD DCX Implementation Case Study <Meiden Corporation> Achieved approximately 50% reduction in design man-hours by resolving drawing inconsistencies and automating parts list creation.
Since its establishment in 1975, Meiden Co., Ltd. has developed by leveraging its strength in a system that can consistently handle everything from precision sheet metal processing to painting and assembly. We would like to introduce the points and effects of solving the challenges of inspection drawing and parts list creation time through the introduction of 'ECAD DCX'. ■ Effects after introduction - The parts list creation that used to take a full day is now completed with the push of a button, reducing the man-hours for design work by 50%. - Optimization of delivery time and costs through the use of ECAD-Cabinet collaboration. - Standardization of design ensures the same quality regardless of who is designing. - Significant improvement in design accuracy, creating an environment where we can focus on what we should be doing. ■ Product features - Real-time information updates and error detection significantly reduce inspection drawing man-hours. - Automatic creation of reports such as parts lists, terminal block tables, and wiring tables from drawing data improves productivity. - During drawing creation, necessary parts can be searched and assigned from the cloud-based parts library database 'ECAD Library' (support contract required), and selected parts can be registered in the master for shared use. - Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving automation. *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Even if we understand the necessity of work style reform, what exactly should we do? Here are hints for work style reform in control panel manufacturing that we should tackle in the future, based on s...
- 2D CAD Electrical
- Other CAD related software
ECAD DCX Implementation Case Study <Meiden Corporation> Achieved approximately 50% reduction in design man-hours by resolving drawing inconsistencies and automating parts list creation.
Since its establishment in 1975, Meiden Co., Ltd. has developed by leveraging its strength in a system that can consistently handle everything from precision sheet metal processing to painting and assembly. We would like to introduce the points and effects of solving the challenges of inspection drawing and parts list creation time through the introduction of 'ECAD DCX'. ■ Effects after introduction - The parts list creation that used to take a full day is now completed with the push of a button, reducing the man-hours for design work by 50%. - Optimization of delivery time and costs through the use of ECAD-Cabinet collaboration. - Standardization of design ensures the same quality regardless of who is designing. - Significant improvement in design accuracy, creating an environment where we can focus on what we should be doing. ■ Product features - Real-time information updates and error detection significantly reduce inspection drawing man-hours. - Automatic creation of reports such as parts lists, terminal block tables, and wiring tables from drawing data improves productivity. - During drawing creation, necessary parts can be searched and assigned from the cloud-based parts library database 'ECAD Library' (support contract required), and selected parts can be registered in the master for shared use. - Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving automation. *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Even if you understand the necessity of work style reform, what exactly should you do? Here are hints for work style reform in control panel manufacturing that you should focus on in the future, as se...
- 2D CAD Electrical
- Other CAD related software
ECAD DCX Implementation Case Study <Meiden Corporation> Achieved approximately 50% reduction in design man-hours by resolving drawing inconsistencies and automating parts list creation.
Since its establishment in 1975, Meiden Co., Ltd. has developed by leveraging its strength in a system that can consistently handle everything from precision sheet metal processing to painting and assembly. We would like to introduce the points and effects of solving the challenges of inspection drawing and parts list creation time through the introduction of 'ECAD DCX'. ■ Effects after introduction - The parts list creation that used to take a full day is now completed with the push of a button, reducing the man-hours for design work by 50%. - Optimization of delivery time and costs through the use of ECAD-Cabinet collaboration. - Standardization of design ensures the same quality regardless of who is designing. - Significant improvement in design accuracy, creating an environment where we can focus on what we should be doing. ■ Product features - Real-time information updates and error detection significantly reduce inspection drawing man-hours. - Automatic creation of reports such as parts lists, terminal block tables, and wiring tables from drawing data improves productivity. - During drawing creation, necessary parts can be searched and assigned from the cloud-based parts library database 'ECAD Library' (support contract required), and selected parts can be registered in the master for shared use. - Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving automation. *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Introducing examples of successful work style reforms achieved through the efficiency and standardization of electrical design!
- Other CAD
ECAD DCX Implementation Case Study <Meiden Corporation> Achieved approximately 50% reduction in design man-hours by resolving drawing inconsistencies and automating parts list creation.
Since its establishment in 1975, Meiden Co., Ltd. has developed by leveraging its strength in a system that can consistently handle everything from precision sheet metal processing to painting and assembly. We would like to introduce the points and effects of solving the challenges of inspection drawing and parts list creation time through the introduction of 'ECAD DCX'. ■ Effects after introduction - The parts list creation that used to take a full day is now completed with the push of a button, reducing the man-hours for design work by 50%. - Optimization of delivery time and costs through the use of ECAD-Cabinet collaboration. - Standardization of design ensures the same quality regardless of who is designing. - Significant improvement in design accuracy, creating an environment where we can focus on what we should be doing. ■ Product features - Real-time information updates and error detection significantly reduce inspection drawing man-hours. - Automatic creation of reports such as parts lists, terminal block tables, and wiring tables from drawing data improves productivity. - During drawing creation, necessary parts can be searched and assigned from the cloud-based parts library database 'ECAD Library' (support contract required), and selected parts can be registered in the master for shared use. - Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving automation. *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Approximately 2 million registered parts! Necessary part information can be accessed directly from the cloud, speeding up the process from design to manufacturing.
- 2D CAD Electrical
- Other CAD related software
ECAD DCX Implementation Case Study <Meiden Corporation> Achieved approximately 50% reduction in design man-hours by resolving drawing inconsistencies and automating parts list creation.
Since its establishment in 1975, Meiden Co., Ltd. has developed by leveraging its strength in a system that can consistently handle everything from precision sheet metal processing to painting and assembly. We would like to introduce the points and effects of solving the challenges of inspection drawing and parts list creation time through the introduction of 'ECAD DCX'. ■ Effects after introduction - The parts list creation that used to take a full day is now completed with the push of a button, reducing the man-hours for design work by 50%. - Optimization of delivery time and costs through the use of ECAD-Cabinet collaboration. - Standardization of design ensures the same quality regardless of who is designing. - Significant improvement in design accuracy, creating an environment where we can focus on what we should be doing. ■ Product features - Real-time information updates and error detection significantly reduce inspection drawing man-hours. - Automatic creation of reports such as parts lists, terminal block tables, and wiring tables from drawing data improves productivity. - During drawing creation, necessary parts can be searched and assigned from the cloud-based parts library database 'ECAD Library' (support contract required), and selected parts can be registered in the master for shared use. - Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving automation. *For more details, please refer to the materials. Feel free to contact us with any inquiries.
This is a list of examples of using the electrical design CAD 'ECAD'.
- 2D CAD Electrical
Introducing a case where a system was built that allows beginners to perform wiring work in a short period of time, even without prior experience in electrical CAD!
- Other CAD
WIRE CAM DX Introduction Case Study <Meito Panel Co., Ltd.> Built a system that allows beginners to perform wiring work in a short period of time, even without prior experience in electrical CAD!
Since its establishment in 1980, Meito Panel Co., Ltd., a "specialized manufacturer of panel production" that assembles control panels, distribution boards, and cubicles, has introduced 'WIRE CAM DX' to focus on digitalizing panel assembly through various innovations without sticking to traditional methods. Here are the effects of the introduction. ■ Effects After Implementation - Significantly reduced the man-hours required for data creation necessary for manufacturing by easily converting wiring design results into Excel data. - Directly imported wire number data into the mark tube printer for printing processing. - Successfully reduced material waste by about 30-40% by producing wires for doors and other components in precise sizes. - Outsourced wires and ducts for increased efficiency. - Increased the number of wiring personnel. - Shortened wiring work from 80 hours to about 60 hours. - Unified wiring routes, improving product quality. ■ Product Features 'WIRE CAM DX' is simulation software that can create production information for panels from design drawings. - In addition to CAD data, various files can be used for wiring design. - Tasks can be transitioned to non-technical personnel, allowing for increased production capacity through the establishment of a division of labor.
Introducing a case where an environment was established within one month from the introduction, allowing anyone to perform wiring work on control panels!
- Other CAD
WIRE CAM DX Introduction Case Study <Meito Panel Co., Ltd.> Built a system that allows beginners to perform wiring work in a short period of time, even without prior experience in electrical CAD!
Since its establishment in 1980, Meito Panel Co., Ltd., a "specialized manufacturer of panel production" that assembles control panels, distribution boards, and cubicles, has introduced 'WIRE CAM DX' to focus on digitalizing panel assembly through various innovations without sticking to traditional methods. Here are the effects of the introduction. ■ Effects After Implementation - Significantly reduced the man-hours required for data creation necessary for manufacturing by easily converting wiring design results into Excel data. - Directly imported wire number data into the mark tube printer for printing processing. - Successfully reduced material waste by about 30-40% by producing wires for doors and other components in precise sizes. - Outsourced wires and ducts for increased efficiency. - Increased the number of wiring personnel. - Shortened wiring work from 80 hours to about 60 hours. - Unified wiring routes, improving product quality. ■ Product Features 'WIRE CAM DX' is simulation software that can create production information for panels from design drawings. - In addition to CAD data, various files can be used for wiring design. - Tasks can be transitioned to non-technical personnel, allowing for increased production capacity through the establishment of a division of labor.
The standard of the electrical design industry 'ECAD'
- 2D CAD Electrical
- Other CAD related software
ECAD DCX Implementation Case Study <Meiden Corporation> Achieved approximately 50% reduction in design man-hours by resolving drawing inconsistencies and automating parts list creation.
Since its establishment in 1975, Meiden Co., Ltd. has developed by leveraging its strength in a system that can consistently handle everything from precision sheet metal processing to painting and assembly. We would like to introduce the points and effects of solving the challenges of inspection drawing and parts list creation time through the introduction of 'ECAD DCX'. ■ Effects after introduction - The parts list creation that used to take a full day is now completed with the push of a button, reducing the man-hours for design work by 50%. - Optimization of delivery time and costs through the use of ECAD-Cabinet collaboration. - Standardization of design ensures the same quality regardless of who is designing. - Significant improvement in design accuracy, creating an environment where we can focus on what we should be doing. ■ Product features - Real-time information updates and error detection significantly reduce inspection drawing man-hours. - Automatic creation of reports such as parts lists, terminal block tables, and wiring tables from drawing data improves productivity. - During drawing creation, necessary parts can be searched and assigned from the cloud-based parts library database 'ECAD Library' (support contract required), and selected parts can be registered in the master for shared use. - Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving automation. *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Significantly improve the productivity of board manufacturing through the utilization of IT! We support the reduction of lead time, prevention of variability, work style reform, and resolution of labo...
- 2D CAD Electrical
- Other CAD related software
We will exhibit our products at the Kansai Grand Fair 2025: Electrical Design CAD / Panel Manufacturing Support System.
We are pleased to announce that our company will be exhibiting products at the "Grand Fair 2025," which will be held at five locations nationwide. ECAD is a dedicated CAD solution for electrical design, equipped with a wealth of features for control design and power distribution panel design, developed for domestic electrical designers over approximately 40 years. It addresses challenges such as improving design quality, enhancing operational efficiency, and reducing labor. At the venue, we will introduce the "Panel Manufacturing Skill-less Solution," which utilizes the panel manufacturing support system "WIRE CAM DX" to create information in the pre-manufacturing stage. This solution enables inexperienced workers to achieve high-quality manufacturing in processes such as wire processing, component assembly, and wiring, addressing the labor shortage issues that have traditionally required skilled workers in panel manufacturing. We invite you to visit our exhibition booth. ■ Exhibition Name: Kansai Grand Fair 2025 ■ Location: Intex Osaka, Hall 6 A・B ■ Booth Number: C-14 ■ Dates: September 18 (Thursday) to September 19 (Friday), 2025 (2 days) ■ Hours: 10:00 AM to 5:00 PM (Final day: 9:00 AM to 4:00 PM) *For more information about the exhibited products, please download the materials. Feel free to contact us with any inquiries.
ECAD DCX 2025 Released An electrical design CAD solution equipped with a wealth of features for electrical design, including control panels and power distribution boards.
- 2D CAD Electrical
- Other CAD related software
ECAD DCX Implementation Case Study <Meiden Corporation> Achieved approximately 50% reduction in design man-hours by resolving drawing inconsistencies and automating parts list creation.
Since its establishment in 1975, Meiden Co., Ltd. has developed by leveraging its strength in a system that can consistently handle everything from precision sheet metal processing to painting and assembly. We would like to introduce the points and effects of solving the challenges of inspection drawing and parts list creation time through the introduction of 'ECAD DCX'. ■ Effects after introduction - The parts list creation that used to take a full day is now completed with the push of a button, reducing the man-hours for design work by 50%. - Optimization of delivery time and costs through the use of ECAD-Cabinet collaboration. - Standardization of design ensures the same quality regardless of who is designing. - Significant improvement in design accuracy, creating an environment where we can focus on what we should be doing. ■ Product features - Real-time information updates and error detection significantly reduce inspection drawing man-hours. - Automatic creation of reports such as parts lists, terminal block tables, and wiring tables from drawing data improves productivity. - During drawing creation, necessary parts can be searched and assigned from the cloud-based parts library database 'ECAD Library' (support contract required), and selected parts can be registered in the master for shared use. - Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving automation. *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Reduction of lead time through improvement of drawing quality and efficiency of design work.
- Other CAD
Reduce drawing time by 20%! By automatically outputting parts list data from drawings, we can reduce ordering mistakes, and by outputting data for sheet metal processing, we can also reduce the man-ho...
- 2D CAD Electrical
ECAD DCX Implementation Case Study <Meiden Corporation> Achieved approximately 50% reduction in design man-hours by resolving drawing inconsistencies and automating parts list creation.
Since its establishment in 1975, Meiden Co., Ltd. has developed by leveraging its strength in a system that can consistently handle everything from precision sheet metal processing to painting and assembly. We would like to introduce the points and effects of solving the challenges of inspection drawing and parts list creation time through the introduction of 'ECAD DCX'. ■ Effects after introduction - The parts list creation that used to take a full day is now completed with the push of a button, reducing the man-hours for design work by 50%. - Optimization of delivery time and costs through the use of ECAD-Cabinet collaboration. - Standardization of design ensures the same quality regardless of who is designing. - Significant improvement in design accuracy, creating an environment where we can focus on what we should be doing. ■ Product features - Real-time information updates and error detection significantly reduce inspection drawing man-hours. - Automatic creation of reports such as parts lists, terminal block tables, and wiring tables from drawing data improves productivity. - During drawing creation, necessary parts can be searched and assigned from the cloud-based parts library database 'ECAD Library' (support contract required), and selected parts can be registered in the master for shared use. - Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving automation. *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Achieving innovation through IWS (I-DEN Wiring Solution) with wiring measurement functionality.
- Other CAD
We will introduce examples of business efficiency improvements from design to procurement and manufacturing, as well as adaptations to changes during times of material shortages!
- Other CAD
ECAD DCX Implementation Case Study <Meiden Corporation> Achieved approximately 50% reduction in design man-hours by resolving drawing inconsistencies and automating parts list creation.
Since its establishment in 1975, Meiden Co., Ltd. has developed by leveraging its strength in a system that can consistently handle everything from precision sheet metal processing to painting and assembly. We would like to introduce the points and effects of solving the challenges of inspection drawing and parts list creation time through the introduction of 'ECAD DCX'. ■ Effects after introduction - The parts list creation that used to take a full day is now completed with the push of a button, reducing the man-hours for design work by 50%. - Optimization of delivery time and costs through the use of ECAD-Cabinet collaboration. - Standardization of design ensures the same quality regardless of who is designing. - Significant improvement in design accuracy, creating an environment where we can focus on what we should be doing. ■ Product features - Real-time information updates and error detection significantly reduce inspection drawing man-hours. - Automatic creation of reports such as parts lists, terminal block tables, and wiring tables from drawing data improves productivity. - During drawing creation, necessary parts can be searched and assigned from the cloud-based parts library database 'ECAD Library' (support contract required), and selected parts can be registered in the master for shared use. - Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving automation. *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Successfully standardized the process from design to procurement!
- 2D CAD Electrical
Introducing a case where the transition from ECAD dio to ECAD DCX was completed within six months, along with the establishment of an operational system that improved productivity and reduced workload...
- Other CAD
ECAD DCX Implementation Case Study <Meiden Corporation> Achieved approximately 50% reduction in design man-hours by resolving drawing inconsistencies and automating parts list creation.
Since its establishment in 1975, Meiden Co., Ltd. has developed by leveraging its strength in a system that can consistently handle everything from precision sheet metal processing to painting and assembly. We would like to introduce the points and effects of solving the challenges of inspection drawing and parts list creation time through the introduction of 'ECAD DCX'. ■ Effects after introduction - The parts list creation that used to take a full day is now completed with the push of a button, reducing the man-hours for design work by 50%. - Optimization of delivery time and costs through the use of ECAD-Cabinet collaboration. - Standardization of design ensures the same quality regardless of who is designing. - Significant improvement in design accuracy, creating an environment where we can focus on what we should be doing. ■ Product features - Real-time information updates and error detection significantly reduce inspection drawing man-hours. - Automatic creation of reports such as parts lists, terminal block tables, and wiring tables from drawing data improves productivity. - During drawing creation, necessary parts can be searched and assigned from the cloud-based parts library database 'ECAD Library' (support contract required), and selected parts can be registered in the master for shared use. - Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving automation. *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Introducing a case where transitioning from general-purpose CAD has improved drawing quality and productivity, while also reducing stress for the staff!
- Other CAD
ECAD DCX Implementation Case Study <Meiden Corporation> Achieved approximately 50% reduction in design man-hours by resolving drawing inconsistencies and automating parts list creation.
Since its establishment in 1975, Meiden Co., Ltd. has developed by leveraging its strength in a system that can consistently handle everything from precision sheet metal processing to painting and assembly. We would like to introduce the points and effects of solving the challenges of inspection drawing and parts list creation time through the introduction of 'ECAD DCX'. ■ Effects after introduction - The parts list creation that used to take a full day is now completed with the push of a button, reducing the man-hours for design work by 50%. - Optimization of delivery time and costs through the use of ECAD-Cabinet collaboration. - Standardization of design ensures the same quality regardless of who is designing. - Significant improvement in design accuracy, creating an environment where we can focus on what we should be doing. ■ Product features - Real-time information updates and error detection significantly reduce inspection drawing man-hours. - Automatic creation of reports such as parts lists, terminal block tables, and wiring tables from drawing data improves productivity. - During drawing creation, necessary parts can be searched and assigned from the cloud-based parts library database 'ECAD Library' (support contract required), and selected parts can be registered in the master for shared use. - Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving automation. *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Demonstrating the features of metal 3D printing! A case where we were able to deliver according to the customer's desired deadline and cost.
- 3D Printer
Achieve real-time AI behavior analysis with a small amount of video data. Utilize it to improve on-site operations, prevent accidents, and discover on-site issues through the accumulation of behavior ...
- Other analyses
You can gain a deeper understanding of digital twins in the ProcessMetaverse.
- simulator
- Integrated operation management
Analyze the handling of tasks and machinery to improve work efficiency! Quickly detect falls and accidents! It can be utilized in a wide range of scenes, including production sites, healthcare, and nu...
- Other analyses
Thickness 2.0mm, height 40mm! Targeting corner lock type or round lock type folding plates.
- Machinery and equipment installation/dismantling/relocation
High-quality output approaching injection molding made possible with G-ZERO×POTICON FILAMENT!
- 3D Printer
- Other polymer materials
Certified as a "Excellent Factory" in Ota Ward for the fiscal year 2025.
Gutenberg Co., Ltd. has been selected for the factory certification system "Yukojo" (Excellent Factory) implemented by Ota Ward. "Yukojo" is a system that certifies outstanding facilities that serve as models for other factories, emphasizing not only high technical and management capabilities but also the creation of a worker-friendly labor environment, cooperation with the community, and consideration for the environment, reflecting a positive attitude towards people and the town. The system started in the 7th year of the Heisei era, and so far, 309 companies have been certified. This system, which focuses on creating a comfortable working environment for employees, harmony with the community, and reducing environmental impact, has been highly regarded as a precursor to the principles of the SDGs. In this, the 31st year, as a result of a rigorous examination, 10 new companies have been certified as "Yukojo." Our selection is thanks to the support of our customers, partner companies, and the local community. We will continue to strive for social contributions centered around 3D printing technology. You can view the original release below. https://www.pio-ota.jp/news/information/r7yukojo_kettei/
Maximum speed 700mm/s, maximum acceleration 30,000mm/s², layer pitch 50-200μm!
- 3D Printer
Certified as a "Excellent Factory" in Ota Ward for the fiscal year 2025.
Gutenberg Co., Ltd. has been selected for the factory certification system "Yukojo" (Excellent Factory) implemented by Ota Ward. "Yukojo" is a system that certifies outstanding facilities that serve as models for other factories, emphasizing not only high technical and management capabilities but also the creation of a worker-friendly labor environment, cooperation with the community, and consideration for the environment, reflecting a positive attitude towards people and the town. The system started in the 7th year of the Heisei era, and so far, 309 companies have been certified. This system, which focuses on creating a comfortable working environment for employees, harmony with the community, and reducing environmental impact, has been highly regarded as a precursor to the principles of the SDGs. In this, the 31st year, as a result of a rigorous examination, 10 new companies have been certified as "Yukojo." Our selection is thanks to the support of our customers, partner companies, and the local community. We will continue to strive for social contributions centered around 3D printing technology. You can view the original release below. https://www.pio-ota.jp/news/information/r7yukojo_kettei/
Equipped with a dehumidification unit to protect the filament from moisture, which causes quality degradation!
- 3D Printer
Certified as a "Excellent Factory" in Ota Ward for the fiscal year 2025.
Gutenberg Co., Ltd. has been selected for the factory certification system "Yukojo" (Excellent Factory) implemented by Ota Ward. "Yukojo" is a system that certifies outstanding facilities that serve as models for other factories, emphasizing not only high technical and management capabilities but also the creation of a worker-friendly labor environment, cooperation with the community, and consideration for the environment, reflecting a positive attitude towards people and the town. The system started in the 7th year of the Heisei era, and so far, 309 companies have been certified. This system, which focuses on creating a comfortable working environment for employees, harmony with the community, and reducing environmental impact, has been highly regarded as a precursor to the principles of the SDGs. In this, the 31st year, as a result of a rigorous examination, 10 new companies have been certified as "Yukojo." Our selection is thanks to the support of our customers, partner companies, and the local community. We will continue to strive for social contributions centered around 3D printing technology. You can view the original release below. https://www.pio-ota.jp/news/information/r7yukojo_kettei/
The tool head is made up of resin parts printed by G-ZERO itself for weight reduction!
- 3D Printer
Certified as a "Excellent Factory" in Ota Ward for the fiscal year 2025.
Gutenberg Co., Ltd. has been selected for the factory certification system "Yukojo" (Excellent Factory) implemented by Ota Ward. "Yukojo" is a system that certifies outstanding facilities that serve as models for other factories, emphasizing not only high technical and management capabilities but also the creation of a worker-friendly labor environment, cooperation with the community, and consideration for the environment, reflecting a positive attitude towards people and the town. The system started in the 7th year of the Heisei era, and so far, 309 companies have been certified. This system, which focuses on creating a comfortable working environment for employees, harmony with the community, and reducing environmental impact, has been highly regarded as a precursor to the principles of the SDGs. In this, the 31st year, as a result of a rigorous examination, 10 new companies have been certified as "Yukojo." Our selection is thanks to the support of our customers, partner companies, and the local community. We will continue to strive for social contributions centered around 3D printing technology. You can view the original release below. https://www.pio-ota.jp/news/information/r7yukojo_kettei/
A tabletop-sized 3D printer of industrial quality that can achieve high speed, high precision, low vibration, low noise, and can also print engineering plastics.
- 3D Printer
Certified as a "Excellent Factory" in Ota Ward for the fiscal year 2025.
Gutenberg Co., Ltd. has been selected for the factory certification system "Yukojo" (Excellent Factory) implemented by Ota Ward. "Yukojo" is a system that certifies outstanding facilities that serve as models for other factories, emphasizing not only high technical and management capabilities but also the creation of a worker-friendly labor environment, cooperation with the community, and consideration for the environment, reflecting a positive attitude towards people and the town. The system started in the 7th year of the Heisei era, and so far, 309 companies have been certified. This system, which focuses on creating a comfortable working environment for employees, harmony with the community, and reducing environmental impact, has been highly regarded as a precursor to the principles of the SDGs. In this, the 31st year, as a result of a rigorous examination, 10 new companies have been certified as "Yukojo." Our selection is thanks to the support of our customers, partner companies, and the local community. We will continue to strive for social contributions centered around 3D printing technology. You can view the original release below. https://www.pio-ota.jp/news/information/r7yukojo_kettei/
Equipped with a dehumidification unit to protect the filament from moisture that causes quality deterioration!
- 3D Printer
Certified as a "Excellent Factory" in Ota Ward for the fiscal year 2025.
Gutenberg Co., Ltd. has been selected for the factory certification system "Yukojo" (Excellent Factory) implemented by Ota Ward. "Yukojo" is a system that certifies outstanding facilities that serve as models for other factories, emphasizing not only high technical and management capabilities but also the creation of a worker-friendly labor environment, cooperation with the community, and consideration for the environment, reflecting a positive attitude towards people and the town. The system started in the 7th year of the Heisei era, and so far, 309 companies have been certified. This system, which focuses on creating a comfortable working environment for employees, harmony with the community, and reducing environmental impact, has been highly regarded as a precursor to the principles of the SDGs. In this, the 31st year, as a result of a rigorous examination, 10 new companies have been certified as "Yukojo." Our selection is thanks to the support of our customers, partner companies, and the local community. We will continue to strive for social contributions centered around 3D printing technology. You can view the original release below. https://www.pio-ota.jp/news/information/r7yukojo_kettei/
Would you like to come for a factory tour that is possible because of domestic design and manufacturing in Japan?
- 3D Printer
Certified as a "Excellent Factory" in Ota Ward for the fiscal year 2025.
Gutenberg Co., Ltd. has been selected for the factory certification system "Yukojo" (Excellent Factory) implemented by Ota Ward. "Yukojo" is a system that certifies outstanding facilities that serve as models for other factories, emphasizing not only high technical and management capabilities but also the creation of a worker-friendly labor environment, cooperation with the community, and consideration for the environment, reflecting a positive attitude towards people and the town. The system started in the 7th year of the Heisei era, and so far, 309 companies have been certified. This system, which focuses on creating a comfortable working environment for employees, harmony with the community, and reducing environmental impact, has been highly regarded as a precursor to the principles of the SDGs. In this, the 31st year, as a result of a rigorous examination, 10 new companies have been certified as "Yukojo." Our selection is thanks to the support of our customers, partner companies, and the local community. We will continue to strive for social contributions centered around 3D printing technology. You can view the original release below. https://www.pio-ota.jp/news/information/r7yukojo_kettei/
Would you like to come for a factory tour that is possible because of domestic design and manufacturing in Japan?
- 3D Printer
Certified as a "Excellent Factory" in Ota Ward for the fiscal year 2025.
Gutenberg Co., Ltd. has been selected for the factory certification system "Yukojo" (Excellent Factory) implemented by Ota Ward. "Yukojo" is a system that certifies outstanding facilities that serve as models for other factories, emphasizing not only high technical and management capabilities but also the creation of a worker-friendly labor environment, cooperation with the community, and consideration for the environment, reflecting a positive attitude towards people and the town. The system started in the 7th year of the Heisei era, and so far, 309 companies have been certified. This system, which focuses on creating a comfortable working environment for employees, harmony with the community, and reducing environmental impact, has been highly regarded as a precursor to the principles of the SDGs. In this, the 31st year, as a result of a rigorous examination, 10 new companies have been certified as "Yukojo." Our selection is thanks to the support of our customers, partner companies, and the local community. We will continue to strive for social contributions centered around 3D printing technology. You can view the original release below. https://www.pio-ota.jp/news/information/r7yukojo_kettei/
Quickly transform data into knowledge based on informatics! Contributing to the field of advanced materials development.
- Software (middle, driver, security, etc.)
- simulator
We will be exhibiting at "Kansai Plastic Japan" from May 11 (Wednesday) to May 13 (Friday).
Schrödinger, Inc. will be exhibiting at the 10th [Kansai] Plastic Japan (May 11-13, at Intex Osaka). At our booth, you can experience our unique materials development support software based on LiveDesign. Additionally, in a specialized technical seminar, Takashi Ishizaki, Strategic Deployment Manager, will give a lecture titled "Data Accumulation Platform for Utilizing Open Source in Materials Informatics" on May 11 (Wednesday) at 10:00 AM.
Identifying promising candidate substances! Useful for selecting compounds that meet the conditions for device optimization.
- Other electronic parts
- simulator
- Organic EL
November 24 (Thursday) to 25 (Friday) Organic EL Discussion Meeting 35th Regular Session Oral Presentations and Exhibits
Schrödinger, Inc. will be presenting oral presentations and exhibiting at the 35th Organic EL Discussion Meeting from November 24 (Thursday) to 25 (Friday). 【Company Exhibition Advertisement】 Date and Time: November 25, 17:15-17:40 Title: "A Platform for Molecular Simulation and Machine Learning Supporting the Development of New Organic EL Materials: Materials Science Suite" 【Simulation Short Oral Presentation】 Date and Time: November 26, 13:10 Title: "Molecular Structure Search of Hole Transport Materials Using Genetic Algorithms with Machine Learning Models for Evaluation Functions" We look forward to your visit.
By performing it on a single graphical interface, calculations can be done efficiently!
- Software (middle, driver, security, etc.)
- simulator
We will be exhibiting at "Kansai Plastic Japan" from May 11 (Wednesday) to May 13 (Friday).
Schrödinger, Inc. will be exhibiting at the 10th [Kansai] Plastic Japan (May 11-13, at Intex Osaka). At our booth, you can experience our unique materials development support software based on LiveDesign. Additionally, in a specialized technical seminar, Takashi Ishizaki, Strategic Deployment Manager, will give a lecture titled "Data Accumulation Platform for Utilizing Open Source in Materials Informatics" on May 11 (Wednesday) at 10:00 AM.