List of Contract Services products
- classification:Contract Services
571~585 item / All 2199 items
Achieves high collection efficiency through electrostatic methods. Offers a wide range of products from large to small sizes. Also compatible with water-soluble oil mist.
- air conditioning
We will introduce a case where our company was responsible for the complete construction of a batch production chemical product manufacturing plant!
- Machinery and equipment installation/dismantling/relocation
We can provide comprehensive support from the design of various units used in electrical and electronic equipment, industrial devices, and medical devices to material procurement and manufacturing ins...
- Machinery and equipment installation/dismantling/relocation
Corrected a maximum settlement of 46mm! A case where the distortion of the door frame caused by settlement was resolved.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A case study of correcting liquefied ground due to the earthquake! A maximum settlement of about 60mm was corrected in a day and a half.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A maximum settlement of 500mm occurred! An example of correction using a combination of the up-con method and single pipe pile driving method.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Maximum sinking of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Our method, which raises the CO pavement using the foaming pressure of rigid urethane resin, has been adopted!
- Other contract services
- Exhibition planning/construction
- Calibration and repair
The construction period is 1 day! A case study of the correction work for the sinking of the platform section inside the toll booth conducted in Saitama Prefecture in December 2012.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Correction of road surface irregularities and unevenness in a short construction period! Introducing examples of port facility repair work.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Possible to carry out without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
The ground floor slab sank due to the earthquake! A case study of improving the gaps between the floor and walls, and between the walls and ceiling.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.
- Other contract services
- Exhibition planning/construction
- Calibration and repair