List of Other contract services products
- classification:Other contract services
2266~2280 item / All 8259 items
Presentation of explanatory materials on JIS and ISO standards. We propose suitable safety barriers from a rich product series! Free rental of demo kits.
- Other safety and hygiene products
Amino acid-derived natural cationic polymer that can be used in food preservatives, hygiene materials, and daily necessities. It is a safe material as it is a fermentation product produced by natural ...
- Shelf life enhancer
Introduction of the preservative polylysine / fermented polyamino acids that contribute to food poisoning prevention.
We provide easy-to-understand materials explaining the natural preservative polylysine, which prevents food poisoning. ε-Polylysine (hereafter referred to as polylysine) is an amino acid-derived preservative widely used as a food preservative. By adding polylysine, the growth of microorganisms that cause food poisoning can be prevented. Every year, food poisoning caused by microorganisms is a significant issue and is frequently reported in the news. Even foods that do not appear to be spoiled can rapidly proliferate microorganisms if the growth environment is suitable, so caution is necessary. Even if something looks clean, contamination by bacteria can progress, posing a risk of food poisoning. By ensuring hygiene management during the manufacturing process, proper storage at appropriate temperatures, and the appropriate use of the preservative polylysine, food safety can be more effectively protected. 【Features】 ■ A safe material produced through fermentation by natural microorganisms (not genetically modified organisms) ■ Provides a good image as a natural fermented product ■ Listed in the existing additive registry as a food preservative ■ A safe domestic product *Please feel free to contact us.
A maximum settlement of 500mm occurred! An example of correction using a combination of the up-con method and single pipe pile driving method.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Maximum sinking of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Our method, which raises the CO pavement using the foaming pressure of rigid urethane resin, has been adopted!
- Other contract services
- Exhibition planning/construction
- Calibration and repair
The construction period is 1 day! A case study of the correction work for the sinking of the platform section inside the toll booth conducted in Saitama Prefecture in December 2012.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Correction of road surface irregularities and unevenness in a short construction period! Introducing examples of port facility repair work.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Possible to carry out without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
The ground floor slab sank due to the earthquake! A case study of improving the gaps between the floor and walls, and between the walls and ceiling.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Even in cases where the space between neighboring properties is very narrow, construction is possible! A maximum settlement of 66mm can be corrected in 3 days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Disaster recovery and emergency response for roads! 100% filling of gaps and voids with polyurethane resin.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
An example of quickly correcting the unevenness in the concrete pavement slab at a highway toll booth!
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Performed repairs for the subsidence of the toll booth! Partial corrections were also made in areas where there was a step difference with the U-shaped drainage ditch.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Correction of subsidence while checking the level! A case of pavement repair work at the entrance of a toll booth.
- Other contract services
- Exhibition planning/construction
- Calibration and repair