List of Other contract services products
- classification:Other contract services
2461~2475 item / All 8377 items
Achieves high collection efficiency through electrostatic methods. Offers a wide range of products from large to small sizes. Also compatible with water-soluble oil mist.
- air conditioning
Utilizing spring break for quick subsidence correction! The cycle from construction to restoration is short.
- Other contract services
Up to 60mm of subsidence in the central Slavic region! Ground compaction reinforcement with the foaming pressure of polyurethane resin.
- Other contract services
The foamed polyurethane resin compressively strengthens the ground! It suppresses the occurrence of voids, cavities, and gaps after construction.
- Other contract services
We will introduce a case where the number of preparations was reduced, leading to a 15% shortening of delivery time and cost reduction!
- Processing Jig
- Other contract services
We have our own factory fully equipped. We accept the manufacturing of any type of tent or sheet.
- Other contract services
Decarbonization through the P-D-C-A cycle! We propose suitable renewable energy and energy-saving options.
- Other contract services
The first step towards DX transformation, "going paperless," is best left to the professionals.
- Other contract services
Corrected a maximum settlement of 46mm! A case where the distortion of the door frame caused by settlement was resolved.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A case study of correcting liquefied ground due to the earthquake! A maximum settlement of about 60mm was corrected in a day and a half.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A maximum settlement of 500mm occurred! An example of correction using a combination of the up-con method and single pipe pile driving method.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Maximum sinking of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Our method, which raises the CO pavement using the foaming pressure of rigid urethane resin, has been adopted!
- Other contract services
- Exhibition planning/construction
- Calibration and repair
The construction period is 1 day! A case study of the correction work for the sinking of the platform section inside the toll booth conducted in Saitama Prefecture in December 2012.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.
- Other contract services
- Exhibition planning/construction
- Calibration and repair