List of air conditioning products
- classification:air conditioning
901~945 item / All 1486 items
Build multiple demand groups! You can achieve suitable load curves for each group.
- air conditioning
- Other air conditioning equipment
We will introduce a case where the high-altitude work environment, which was harsh due to extreme heat, was resolved using a spot bazooka!
- air conditioning
- Other air conditioning equipment

[Heat Stroke Prevention Case Study] Sumitomo Heavy Industries Modern Co., Ltd.
At Sumitomo Heavy Industries Modern Co., Ltd., a factory that manufactures large machinery of various sizes and shapes, the indoor environment is air-conditioned, but the height of the building is very high. During the summer, when assembling large machinery, the temperature in high-altitude work areas becomes elevated, necessitating improvements in the working environment. Upon learning that EASE offers a rental of a demo unit for the "Spot Bazooka Integration Set," we consulted with them. We connected a duct to change the blowing direction of the demo unit and confirmed its effectiveness. When we directed the airflow at an upward angle to the high-altitude work area, we confirmed that cold air reached the area, leading us to decide to implement the system. For more details, please refer to the related products and catalog. [Implementation Overview] ■ Installation Site: Sumitomo Heavy Industries Modern Co., Ltd. (Futtsu City, Chiba Prefecture) ■ Installed Products: Four units of the "Spot Bazooka Integration Set" (350mm reducer + flexible duct)
Decision to add more units! A case that received great acclaim for having such a high airflow spot air conditioner.
- air conditioning
- Other air conditioning equipment

[Heat Stroke Prevention Case Study] Hyogo Prefecture, Pharmaceutical Manufacturing Plant
At a pharmaceutical manufacturing plant in Hyogo Prefecture, during the summer before the introduction of the "Spot Bazooka," the temperature inside the semi-open factory exceeded 35 degrees Celsius, making work very challenging. Therefore, this product was introduced. Since liquids are being handled, the humidity inside the factory was also high, creating a harsh environment with a significant risk of heatstroke. However, after the introduction, workers were able to feel dry, cool air in the work area, and it has received very positive feedback from the employees. For more details, please refer to the related products and catalog. 【Introduction Overview】 ■ Location: Hyogo Prefecture, Pharmaceutical Manufacturing Plant ■ Number of Spot Bazookas Installed - Single Type: 11 units - Twin Type: 2 units - Integrated Type: 1 unit ■ Introduction Period: 2017
For gymnasiums where regular air conditioning installation is not possible, "Spot Bazooka" is the solution! Introduction of case studies.
- air conditioning
- Other air conditioning equipment

[Heat Stroke Prevention Case Study] Chikushi Jogakuen University
Here is an introduction to the case of Chikushi Jogakuen University, which implemented measures against heatstroke for classes and club activities. Due to the aging of the gymnasium, the university had previously been unable to install conventional air conditioning. However, with the installation of "Spot Bazooka," they were able to conduct physical education classes and club activities without worrying about heatstroke, creating a comfortable environment. Additionally, a safety net was installed as a precaution, ensuring safe use by preventing fingers from getting caught. The drainage of condensate water is managed with a tank. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■ Location: Chikushi Jogakuen University, Fukuoka Prefecture ■ Number of units installed: 4 integrated units ■ Installation period: July 2020
Introduced as a measure against heatstroke in summer! A case where the decision to implement was made due to the short installation period and cost-effectiveness.
- air conditioning
- Other air conditioning equipment

[Heat Stroke Prevention Case Study] Kasamatsu Town Matsue Elementary School
We would like to introduce the case of Matsue Elementary School in Kasamatsu Town, which implemented measures against heat stroke for classes and club activities. There are three elementary schools and one junior high school in the town, and air conditioning facilities in classrooms were established early on. However, two of the elementary schools still did not have air conditioning in their gymnasiums. As a result, we arrived at the 'Spot Bazooka,' which was suitable in terms of overwhelming airflow effectiveness, safety, installation space, and cost. After confirming the installation site and conducting a demonstration, we verified its effectiveness and implemented it in both schools. As a result, we have received feedback that not only the school but also local sports activities through school openings are now able to be conducted comfortably. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■ Installation Location: Matsue Elementary School, Kasamatsu Town, Hatori District, Gifu Prefecture ■ Number of Units Installed: 6 Spot Bazooka Single Type ■ Implementation Period: May 2020
Eliminate waste with unique flow control technology and remote support, reducing power and CO2 emissions. The average power reduction rate exceeds 80%.
- air conditioning
Utilizing well water at 15°C, we supply cold air equivalent to 25 kW! Compared to air conditioning, electricity costs can be reduced to 1/8 to 1/10! Sample units available!
- air conditioning
- Heat exchanger
- Other air conditioning equipment
Reduce power loss from output control through collaboration with solar power generation! Contribute to the reduction of contracted basic power.
- air conditioning
- Other air conditioning equipment
After implementation, it has received great acclaim for enabling comfortable and agile activities! Here is an introduction to a case where it was introduced as a heatstroke prevention measure during t...
- air conditioning

[Heat Stroke Prevention Case Study] Saitama Prefectural Disaster Prevention Aviation Center
This is an introduction to the case study implemented at the Saitama Prefectural Disaster Prevention Aviation Center. The Saitama Prefectural Disaster Prevention Aviation Team conducts aerial firefighting and rescue operations using helicopters. This time, we introduced the "Spot Bazooka" as a measure against heatstroke during the team's intense training sessions. Until now, training inside the helicopter hangar was conducted in a very harsh environment due to the lack of air conditioning, but after the introduction, the team members have been able to operate comfortably and efficiently, receiving great praise from the members. For more details, please refer to the related products and catalog. [Overview] ■ Issues - Training inside the helicopter hangar was conducted in a very harsh environment due to the lack of air conditioning. ■ Effects - After the introduction, team members have been able to operate comfortably and efficiently, receiving great praise.
Since there are no vinyl ducts, it won't interfere with the work! Introduction of a case where approximately 117 units were installed in 7 locations.
- air conditioning

[Heat Stroke Prevention Case Study] Home Logistics Co., Ltd.
The warehouse of Home Logistics Co., Ltd. has a floor height of just under 10 meters, and cooling the entire building would incur tremendous costs. However, if left unattended, the environment can exceed 35°C in the peak summer, posing a constant risk of heatstroke. Therefore, we introduced the air conditioner 'Guppy Bazooka,' which is used in agricultural greenhouses. It delivers powerful cold air up to 50 meters away with its high airflow and static pressure (the force that pushes air). We first tried one unit, and it indeed delivered cold air up to 50 meters. Next, we purchased four more units, and the workers rated it as "excellent." As a result, approximately 117 units were installed in seven regional distribution centers (logistics warehouses) of Home Logistics. For more details, please refer to the related products and catalog. [Implementation Overview] ■ Issues - Cooling the entire warehouse would incur tremendous costs. - The environment can exceed 35°C in the peak summer if left unattended. ■ Effects - Powerful cold air reaches up to 50 meters away with high airflow and static pressure (the force that pushes air). - There are no vinyl ducts, so it does not interfere with work.
It was determined that it can be implemented at a cost of less than one-fifth of the conventional equipment costs!
- air conditioning

[Heat Stroke Prevention Case Study] Bunkyo Gakuin University Girls' Junior and Senior High School
Among the three gymnasiums in total, the main gymnasium of the academic building, which did not have air conditioning installed, had previously considered introducing air conditioning. However, due to the excessively high costs, the introduction plan was put on hold. Upon learning about our products, they decided to reconsider the installation. In the case of the "Spot Bazooka," it was found that it could be installed for less than one-fifth of the cost of conventional equipment, leading to the decision to proceed with the installation. As a result, during the summer before installation, the temperature inside the gymnasium exceeded 30 degrees Celsius, making classes and club activities difficult due to the heat. However, after the installation, it became very cool and comfortable. For more details, please refer to the related products and catalog. [Case Summary] ■ Installed Equipment: Guppy Bazooka Single Type, 4 units ■ Capacity: Maximum 7 horsepower (28 horsepower for 4 units) ■ External Dimensions and Weight - Indoor Unit: Height 920 x Width 950 x Depth 330 mm, 52 kg - Outdoor Unit: Height 1350 x Width 950 x Depth 330 mm, 90 kg
The indoor unit adopts a housing equivalent to the outdoor unit, making outdoor installation possible! Introduction of case studies for the Spot Bazooka.
- air conditioning

[Heat Stroke Prevention Case Study] Koshigaya Chemical Industry Co., Ltd.
Koshigaya Kasei Kogyo Co., Ltd. has been struggling with heatstroke measures for employees every year as the temperature inside the factory exceeds 35 degrees in summer. However, we found the powerful spot air conditioner "Spot Bazooka" on the website. Immediately (in mid-July 2018), we borrowed a demo unit for one week and tested it in the extreme heat of the factory. The cool, dry air reached far and was very well received by the employees, leading us to decide to implement it. By attaching a flexible duct of the same size as the indoor unit's blower, we reduced duct resistance, allowing a large volume of cool air to be supplied throughout the factory, and the direction of the airflow could be easily changed. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■Challenges - The temperature inside the factory exceeds 35 degrees in summer, and we have been struggling with heatstroke measures for employees every year. ■Effects - The cool, dry air reached far and was very well received by the employees.
Positive feedback stating 'It was great that it could be installed quickly!' Introduction of cases where it has been implemented, mainly in elementary and middle schools.
- air conditioning

[Heat Stroke Prevention Case Study] 19 Public Elementary and Junior High School Gymnasiums in Nakano Ward, Tokyo
In Nakano Ward, we have introduced spot bazookas, focusing on the elementary and junior high schools that are planned for renovation in the future. Although there are plans for future renovations, we have implemented the introduction with a budget constraint of three units per school, and the schools that have actually used them have expressed their satisfaction, saying, "It's very cool." Since it is a lease introduction, the spot bazookas have a short installation period from planning to setup (possible within a year), and the representatives from Nakano Ward have also evaluated it positively, stating, "It was good that we could install it quickly." Additionally, the indoor and outdoor units are compact, making relocation easy. In Nakano Ward, they plan to relocate the equipment before the start of renovation work at the elementary and junior high schools to make effective use of the leased equipment. For more details, please refer to the related products and catalog. 【Introduction Overview】 ■ Nakano Ward Saginomiya Elementary School Gymnasium Indoor Unit ■ Nakano Ward Saginomiya Elementary School Gymnasium Outdoor Unit ■ Nakano Ward Eighth Junior High School Gymnasium Indoor Unit ■ Nakano Ward Eighth Junior High School Gymnasium Outdoor Unit
Cooling targeted only at the workspace! Introduction of a case study that significantly reduced air conditioning installation costs.
- air conditioning

[Heat Stroke Prevention Case Study] Shinkokugyo Co., Ltd.
Shinchu Kogyo has been considering measures against heatstroke at their automobile maintenance facility for some time. During their consideration of air conditioning systems due to their headquarters relocation, they learned about the existence of the Spot Bazooka at an exhibition. The Spot Bazooka blows cool air specifically at the work area (only where needed), which significantly reduces initial costs compared to installing a conventional air conditioning system. Furthermore, due to the nature of the maintenance facility, dust is a concern. The Spot Bazooka's environmental durability, allowing for outdoor use while being easy to maintain, was a key factor in its adoption. For more details, please refer to the related products and catalog. [After Implementation] ■ Significantly reduced initial costs ■ Environmental durability for outdoor use ■ Easy maintenance ■ The cooling air reached over 10 meters even in the semi-open maintenance facility where outside air enters, allowing workers to perform maintenance comfortably ■ Increased work efficiency
The key point is that the air conditioning's cooling airflow reaches far with a large volume of air! Introduction of case studies in vehicle maintenance facilities.
- air conditioning

[Heat Stroke Prevention Case Study] Vehicle Maintenance Facility
This is an introduction to a case study implemented at a vehicle maintenance facility. The work inside the vehicle maintenance facility was being conducted without air conditioning, but due to the ongoing extreme heat during the summer years, we were considering measures against heatstroke. As a solution, we installed one spot bazooka unit in each vehicle maintenance lane, which is the main work flow, and also installed two additional spot bazooka units on the opposite side. We considered various products, but after experiencing the actual machine at an exhibition, we decided on the Ease spot bazooka. The deciding factor was its high air volume, which allowed the air conditioning's cooling air to reach far, and after installation, the dehumidified dry air helped to dry sweat, creating a comfortable environment. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■ Installation Location: Koto Ward, Tokyo, Vehicle Maintenance Facility ■ Number of Units Installed: 7 Spot Bazooka Units ■ Installation Period: July 2020
Introducing a case study of the Spot Bazooka, which can blow cold air approximately 20 meters even inside semi-open buildings!
- air conditioning

[Heat Stroke Prevention Case Study] Hanwa Co., Ltd.
At the factory of Sanko Kogyo Co., Ltd., we have been working on heat countermeasures through the installation of fans, provision of cooling vests, and taking breaks during work when the WBGT warning temperature is reached. However, in order to further improve the workplace environment and ensure the safety of our workers, we have decided to implement more advanced measures across all sites. We are introducing our highly efficient air conditioning units at our locations nationwide. In selecting the air conditioning units, the 'Spot Bazooka,' which can blow cool air approximately 20 meters even in semi-open buildings, emerged as a strong candidate. This decision was made based on performance verification through demonstration units and confirmation of implementation results in the market. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■ A total of 99 Spot Bazookas have been installed at 20 locations nationwide (18 sales offices, including group companies, and 2 factories) as of the end of 2020. * Breakdown: 15 integrated units and 84 separate units (single type).
Introducing the implementation results and customer feedback of "Complete Factory Cool Down" for heatstroke prevention, and it's energy-saving too!
- air conditioning
Prepare for summer in winter and spring! Ventilation and air conditioning that can create a comfortable space even in large areas. Energy-saving and easy to install.
- air conditioning
Up to 8 hours of continuous operation possible! Case study of the special specification Strong Cool for educational facilities.
- air conditioning
Special specifications for educational facilities are also available! We are conducting demonstrations where you can experience the actual machine.
- air conditioning
Introducing a case study of the "Cool Breeze Plan" that cools down hot factories.
- air conditioning
Significant reduction in air conditioner power consumption! Same temperature settings and operation method, low cost, and easy installation.
- air conditioning
World's first!! Energy-saving device specialized for refrigeration equipment such as freezers, refrigerators, and chillers.
- air conditioning
An essential item for heatstroke prevention from now on! Easy ON/OFF with a single switch! You can work cool and comfortably while maintaining distance from others. *For details, please refer to the c...
- Other safety and hygiene products
- air conditioning
Mitigates direct cold air impact! Eliminates temperature unevenness in the blowing air and supplies clean air to the surgical field.
- air conditioning
Save Energy, Stay Cool. - Blow away the heat and the prices.
- Other air conditioning equipment
- Ventilation and Exhaust
- air conditioning
It is widely used for factory exteriors and solar applications.
- Rubber
- Steel
- air conditioning
The hotel's power consumption is due to "forgetting to turn off lights at checkout" and "higher temperature settings in shared areas due to customer-first thinking."
- air conditioning
- Other air conditioning equipment
For hotels, by automatically raising the temperature by 1°C every hour up to a certain set temperature, we can reduce excessive cooling in the rooms and gradually decrease power consumption while main...
- air conditioning
- Other air conditioning equipment
We provide new and updated air conditioning work with a focus on careful and safe operations!
- air conditioning
- Other services