[Achievement Introduction] Boiler Aging Renewal Plan - Design - Construction
Multiple small boilers have been introduced! It has become possible to generate steam with the minimum necessary amount according to the timing.
The water tube boiler used for steam generation within the factory has aged and it is time for an upgrade. We proposed an optimal update based on the latest utility load of the facility to the customer and carried out the design, procurement, and construction. In response to the request to build new equipment while using the existing building as is, we introduced multiple small boilers. This allowed for steam generation with the minimum necessary amount according to the timing. Customers who wish to update aging utility equipment but want to optimize it according to their current utility load are welcome to contact us. 【Case Overview】 ■ Renewal of aging large water tube boiler at an oil storage facility (completed in FY 2019) ■ Construction Details - Instead of simply updating the equipment with the same specifications, we proposed an optimized update tailored to the current utility load of the facility. - We supported the selection of equipment and the update plan, undertaking a complete construction including ancillary work. *For more details, please refer to the PDF materials or feel free to contact us.
- Company:出光エンジニアリング
- Price:Other