[BIM Software Implementation Case Study] Agora Evry Arena
Even when faced with unexpected challenges, it became possible to continue working by utilizing Tekla Model Sharing.
This construction is a renovation project for the Agora Evry Arena, which was built as an auditorium in 1970. At that time, it was a complex project that required high technical skills, and the expertise of the Bordan Châtauneuf team was necessary for the construction. The first challenge of this project was to recreate the design model of the existing building from scratch in order to add a new structure. The modeling was based on a manual created by Bordan Châtauneuf in 1970. Using point cloud data obtained from a 3D scan of the existing structure, the components were adjusted by a few centimeters. It was confirmed that the measured point cloud data had position information very close to that of the actual building. This "research" faced several unexpected challenges, but despite the difficulties, it became possible to continue working by utilizing Tekla ModelSharing.
- Company:トリンブル・ソリューションズ
- Price:Other