We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction Product List and Ranking from 171 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 08, 2025~Nov 04, 2025
This ranking is based on the number of page views on our site.

Construction Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 08, 2025~Nov 04, 2025
This ranking is based on the number of page views on our site.

  1. 原田鉄工 Hiroshima//Manufacturing and processing contract
  2. 双日マシナリー 環境・生活産業システム本部 Tokyo//Trading company/Wholesale
  3. 小森安全機研究所 Saitama//Industrial Machinery
  4. 4 イワタ Saitama//Building materials, supplies and fixtures
  5. 5 フロロテクノロジー Aichi//Chemical

Construction Product ranking

Last Updated: Aggregation Period:Oct 08, 2025~Nov 04, 2025
This ranking is based on the number of page views on our site.

  1. Regarding substrate preparation using ISO Sa2.5 blasting. 原田鉄工
  2. Vacuum Thermal Decomposition Resin Cleaning Furnace 'VACUCLEAN' 双日マシナリー 環境・生活産業システム本部
  3. One-touch installation by simply inserting the pipe! Air piping "Air Liner" 日東工器
  4. 4 "Batcher Plant" *Supports design, construction, and maintenance. SHOWA KOKI CO.,LTD
  5. 4 Easy application with just a wipe! For stain resistance, water repellency, and shine, use 'Peri Coating S'. 中京化成工業

Construction Product List

196~210 item / All 276 items

Displayed results

[2×4 Housing Construction Achievements] Wooden Factory - Kowa Manufacturing Co., Ltd.

Introducing examples of buildings constructed with smooth transportation and user-friendly flow!

We would like to introduce the construction achievements of 2×4 houses at our wooden factory, Kowa Manufacturing, which operates with a fully integrated system from the design and manufacturing of press molds to press processing, assembly, and shipping. The first floor consists of a processing factory and a warehouse, while the second floor includes a conference room, office, material storage area (81.94 tsubo), and a workshop (116.44 tsubo), allowing for ample material storage. The building is equipped with a material transport lifter (8.12 m²) connecting the first and second floors, ensuring smooth and user-friendly transportation flow. 【Project Overview (Partial)】 ■ Overall construction period: September 2022 to the end of April 2023 (8 months) ■ Address: Tarui Town, Fuwa District, Gifu Prefecture ■ Number of floors: 2-story with some single-story sections ■ Total floor area: ・2504.16 m² (757.6 tsubo) ・1st floor: 1669.44 m², 2nd floor: 834.72 m² *For more details, please refer to the related links or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[2×4 Housing Construction Achievements] Wooden Welfare Facility - Altea Headquarters

The concept is coexistence and intergenerational exchange! A layout plan where each department is connected by a corridor.

We would like to introduce our construction achievements of 2×4 houses at the wooden welfare facility, Altea headquarters. The layout plan features entrances for each department on both the east and west sides, connected by a corridor. Each department faces the courtyard (Altea Garden), allowing glimpses of activities specific to each department through the courtyard. Additionally, the nursing day room incorporates a bright space with a skylight facing the courtyard, serving as an area for meals, watching television or sports, and enjoying karaoke. 【Project Overview (Partial)】 ■ Construction Period: November 2021 ■ Address: Gifu City, Gifu Prefecture ■ Number of Floors: Single-story ■ Total Floor Area: 681.58 m² (206.18 tsubo) ■ Concept: Coexistence and Intergenerational Exchange *For more details, please refer to the related links or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[2×4 Housing Construction Achievements] Wooden Rice Storage Warehouse <Constant Temperature>

The interior materials use cedar boards from Tokushima Prefecture! Significantly reduces initial and running costs of the equipment.

We would like to introduce our construction achievements of 2×4 houses in a wooden rice storage warehouse. This rice storage warehouse maintains a constant temperature of 13°C. With a high airtightness and high insulation specification, combined with a household air conditioner, the energy-saving design reduces electricity costs for air conditioning to one-third of the usual amount, significantly lowering both initial and running costs of the equipment. Additionally, the interior materials use cedar boards from Tokushima Prefecture. This "wooden structure + wooden interior + energy-saving" design results in a large wooden storage warehouse that is environmentally friendly. 【Case Overview】 ■ Construction Period: July 2021 ■ Structure: Wooden single-story warehouse ■ Total Floor Area: 566.42 m² (171.34 tsubo) ■ Foundation: Continuous foundation, with the foundation and floor slab (with reinforcement) poured as a single unit, no underground beams ■ Wooden Structure: Walls are 206, and the roof structure achieves a maximum span of 20m using LVL truss construction ■ Construction Duration: Actual working days 9 (from foundation to completion of structural frame) *For more details, please refer to the related links or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[2×4 Housing Construction Achievements] Docomo Shop Nagahama National Route 8 Store

Introducing a construction that adopts a "truss structure" to create a spacious environment!

We would like to introduce the construction achievements of 2×4 houses at the Docomo Shop Nagahama Route 8 store. This commercial facility is a wooden building using "JAS structural materials." The roof employs a "truss structure" that combines components in a triangular shape, creating a spacious interior. Part of the interior uses "Biwa Lake timber," sourced from Shiga Prefecture, and actively using local materials contributes to the conservation of Shiga's forests. 【Case Overview】 ■ Construction Period: April 2020 ■ Type: Commercial Facility ■ Property Structure: 2×4 construction with some two-story sections ■ Total Floor Area: 388m³ (117.37 tsubo) ■ Wood Usage: 72.95m³ ■ CO2 Sequestration: 43.61t-CO2 (equivalent to 5.5 Nagahama Domes per year) *For more details, please refer to the related links or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[2×4 Housing Construction Achievements] Shiga Wood Headquarters

Reduce electricity consumption by up to 1/4 with solar power! Achieve heating and cooling for the entire building with 5 home air conditioners.

We would like to introduce our construction achievements of 2×4 houses at the Shigawood headquarters. The structure, characterized by the high airtightness and high insulation of the 2x4 construction method, is thoroughly implemented. We simulate the heating and cooling consumption based on weather data and mechanical heat quantities, setting the size of windows and insulation performance. Additionally, a spacious atrium structure from the ground floor to the second floor allows for the entire building to be heated and cooled with five household air conditioning units. This uniquely efficient structure is also gaining attention from an ecological perspective and serves as a showroom. 【Case Overview】 ■ Construction Period: November 2014 ■ Type: Large corporate building ■ Property Structure: 2×4 construction, two stories ■ Total Floor Area: 561 m² (170 tsubo) *For more details, please refer to the related links or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Welding construction for vertical mill parts.

Achieving a longer lifespan by applying hardening buildup to the worn parts! Here is an introduction to buildup welding construction.

The grinding surfaces of vertical mills (rollers and table liners) experience wear over time, leading to a decrease in grinding performance. To address this, hardfacing is applied to the rollers and table to enhance wear resistance and achieve a longer lifespan. Additionally, after a certain period of operation, repairs are conducted to restore the grinding surfaces to their original shape through re-hardfacing welding, aimed at recovering grinding performance. 【Features of Hardfacing Welding】 - By applying hardfacing to the worn areas of the rollers and table liners, a longer lifespan is achieved. - Hardfacing materials specifically developed for vertical mill rollers and table liners are used for the hardfacing welding process. - The vertical mill crushes the material to approximately 100μm using the rotating table and rollers. *For more details, please refer to the related links page or feel free to contact us.

  • image_03.png
  • image_05.png
  • テーブル 加工.jpg
  • ミル写真 加工.jpg
  • 竪型Mill マンガ 追記.jpg
  • Processing Contract
  • Other metal materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Design and construction of painting equipment.

In 3D design, we bring our customers' visions to life. Achieving labor-saving in painting, quality improvement, and environmental enhancement!

Introducing TOMEX's painting equipment design and construction department, which provides a more efficient and effective painting system. We flexibly combine different mechanisms based on conditions such as the purpose of painting, type of paint, size, shape, material of the object to be painted, processing steps, and production volume, to achieve labor-saving in painting, quality improvement, and environmental enhancement through high-functionality total system design and construction. 【Features】 ■ We listen to customer requests and visualize the equipment in 3D. ■ Achieving labor-saving in painting, quality improvement, and environmental enhancement. *For more details, please refer to the PDF materials or feel free to contact us.

  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reliable drainage regardless of pipe slope!! Drain pump + hose installation

We will introduce the differences in drainage methods between PVC piping installation (drain-up) and drain pump + hose installation!

In conventional drain piping installation, "PVC piping installation" is generally adopted. In contrast, our company's "drain pump" used in "drain pump + hose installation" has a completely different drainage method. Let's take a look at the differences in drainage methods. ■ PVC Piping Installation (Drain Up) This method involves lifting the drain water from the air conditioner and draining it using natural slope. It is essential to create a slope for drainage. ■ Drain Pump + Hose Installation This method lifts the drain from the air conditioner using a drain pump and pumps it out with the power of the pump. In this case, no slope is necessary. Furthermore, with a built-in backflow prevention valve in the pump, it can immediately send the water horizontally to the drainage destination after being lifted. This is a method that uses hose piping. ■ Points With drain pump + hose installation, drainage can be reliably achieved regardless of the piping slope. There is no need to design the drainage route in advance, allowing for on-site decisions, which provides the advantage of being able to install air conditioning equipment in the optimal location.

  • Other pumps

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reduce working hours and labor costs by 80% compared to conventional methods!! Drain pump + hose installation.

Reduce work time and labor costs by 80% compared to conventional "PVC piping installation"! A new drainage piping installation method that does not require a slope: "Drain pump + hose installation."

As an example of conventional "PVC piping installation," when using a drain-up kit installed in ceiling cassette air conditioners, the drain piping is raised and sloped (natural slope) to send the drain to the drainage point. If the slope is not sufficient, drainage cannot occur, so it is necessary to design the piping route and install support hardware. This process includes many tasks that require knowledge and experience, such as marking out, anchor installation, and bonding PVC pipes. In contrast, "drain pump + hose installation" does not require a natural slope because the drain pump pressurizes and discharges the water. Since it uses hose piping, the piping route can be freely determined on-site. No knowledge or experience is needed for installation, and the number of steps is fewer, making it possible for anyone to perform the installation while also reducing the likelihood of installation defects. The installation time*1 is approximately 16 hours for PVC piping installation and about 3 hours for drain pump + hose piping. Labor costs*2 are 42,000 yen for PVC piping installation and 8,000 yen for drain pump + hose piping. Comparatively, both can achieve an 80% reduction (compared to our company). *1… A single worker installs a 20m long drain pipe. Design and trial operation time and costs are not included. *2… Calculated based on 21,000 yen for 8 hours of work per day.

  • Other pumps

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Easy application with just a wipe! For stain resistance, water repellency, and shine, use 'Peri Coating S'.

Achieves long-lasting effects for over 6 months at a lower cost than fluorine coatings! A one-component, room temperature curing glass coating agent that can also be used on heavy machinery. *Available for purchase starting from one trial bottle.

The "Peri Coating S," manufactured and sold by Chukyo Chemical Industry, is a one-component, room-temperature curing glass coating agent that can be easily applied by spraying it on heavy machinery or vehicle bodies and wiping it off with a cloth. ~ Points for Choosing Peri Coating S ~ Typical glass coatings are two-component and generally difficult to apply, which is a common drawback. However, Peri Coating S is one-component and easy to apply, and its durability and longevity exceed six months, making it more cost-effective and safer to use than wax or fluorine coatings. 【Features】 ■ Prevents adhesion of cement, concrete slurry, mud, etc., improving the work environment ■ More durable and longer-lasting than fluorine coatings and wax, at an affordable price ■ Effective not only for automobiles but also for heavy machinery ★ A video is also available! Please check it out at the bottom of the screen. You can purchase a trial bottle starting from just one! *For more details, please refer to the PDF document or feel free to contact us.

  • Coating Agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

With numerous achievements, we provide a comprehensive service from office design and planning to construction!

[Must-see for those considering an office relocation] Original offices created by a store design company. We will transform your workspace into something better.

Comprehensive production that surpasses other companies with "overwhelming high quality" and "overwhelming short delivery times." We will provide proposals that address the current issues and objectives within your office. Please leave it to us for new suggestions that consider not only furniture placement and design but also the activation of communication and the flow of staff. Additionally, if you are considering new construction or relocation, we will offer various proposals from different angles, taking into account construction costs for wooden structures, lightweight steel, and heavy steel. We also provide advice on points that must be legally complied with, such as building codes and fire laws. *For more details, please download the PDF materials or contact us by mentioning "Ipros."

  • Other office supplies

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] TRACKMAN Showroom

Introducing a case where we assisted with the showroom of "TRACKMAN"!

We would like to introduce a case study for TRACKMAN. We carefully selected materials to recreate the world depicted in the brochure. We made adjustments to the installation position of the projector, the size of the screen, and the mounting methods to effectively convey the outstanding performance of the simulator. Please feel free to contact us when you need our services. 【Case Overview】 ■Company Name: TRACKMAN Showroom ■Area: 58 tsubo *For more details, please refer to the related links or feel free to contact us.

  • Other services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Nishikawa Communications Co., Ltd.

Here are some examples of proposals for break rooms, such as cafes on different floors!

We would like to introduce a case study for Nishikawa Communications Co., Ltd. The break room is designed to be a stylish space that allows for relaxation, resembling a real café, with a ceiling made of solid wood panels. In the multipurpose room, we focused on the lighting plan with indirect lighting to effectively facilitate presentations on a large screen using a projector. 【Case Overview】 ■Company Name: Nishikawa Communications Co., Ltd. ■Area: 37 tsubo *For more details, please refer to the related links or feel free to contact us.

  • Other services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Maruto Mizutani Co., Ltd. Employee Cafeteria

We would like to introduce a case where we received a request to transform the employee break area into a bright space like a café!

We would like to introduce a case study of the employee cafeteria at Maruto Mizutani Co., Ltd. We installed indirect lighting in the ceiling, which had a low and oppressive feel, to create a sense of openness. The effect of the decorative greenery also contributes to a relaxing atmosphere. Materials have been selected to ensure comfort for a wide range of ages and genders. 【Case Overview】 ■Company Name: Maruto Mizutani Co., Ltd. Employee Cafeteria ■Area: 71 tsubo *For more details, please refer to the related links or feel free to contact us.

  • Other services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

On-site machining services available.

We will process and repair it on-site without disassembling the equipment.

We use Sir Meccanica products to “accurately” and “quickly” recondition shaft holes in factory equipment, production machinery, large cargo handling machinery, and other equipment. We can also rebuild shaft holes “on the spot”, ‘accurately’, and “quickly”. Normally, equipment must be stopped, disassembled, transported, repaired, etc., but we can minimize downtime by providing on-site repair services. Please feel free to contact us for more information. For heavy equipment repairs, we will introduce you to a user.

  • Other machine tools
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration